BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//SF Bay Conservation &amp; Development - ECPv6.17.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.bcdc.ca.gov
X-WR-CALDESC:Events for SF Bay Conservation &amp; Development
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20230312T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20231105T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20240310T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20241103T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20250309T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20251102T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VTIMEZONE
TZID:UTC
BEGIN:STANDARD
TZOFFSETFROM:+0000
TZOFFSETTO:+0000
TZNAME:UTC
DTSTART:20230101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20240516T080000
DTEND;TZID=America/Los_Angeles:20240516T170000
DTSTAMP:20240628T211943Z
CREATED:20240528T224540Z
LAST-MODIFIED:20240628T211943Z
UID:10000179-1715846400-1715878800@www.bcdc.ca.gov
SUMMARY:May 16\, 2024 Environmental Justice Working Group (Cancelled)
DESCRIPTION:
URL:https://www.bcdc.ca.gov/event/may-16-2024-environmental-justice-working-groupcancelled/
CATEGORIES:Environmental Justice Working Group
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20240516T130000
DTEND;TZID=UTC:20240516T170000
DTSTAMP:20250321T215637Z
CREATED:20240118T081327Z
LAST-MODIFIED:20250321T215637Z
UID:10000097-1715864400-1715878800@www.bcdc.ca.gov
SUMMARY:May 16\, 2024 Commission Meeting
DESCRIPTION:This Commission meeting will operate as a hybrid meeting under teleconference rules established by the Bagley-Keene Open Meeting Act. Commissioners are located at the primary physical location and may be located at the teleconference locations specified below\, all of which are publicly accessible. The Zoom video-conference link and teleconference information for members of the public to participate virtually is also specified below. \nPrimary Physical Meeting Location \nMetro Center375 Beale St.\, Temazcal Conference RoomSan Francisco\, 415-352-3600 \nIf you have issues joining the meeting using the link\, please enter the Meeting ID and Password listed below into the ZOOM app to join the meeting. \nJoin the meeting via ZOOM \nhttps://bcdc-ca-gov.zoom.us/j/88105137697?pwd=vbbiJ6slOT960Wiv4z9juBdKuZbMvZ.1 \nLive Webcast \nSee information on public participation \nTeleconference numbers1 (866) 590-5055Conference Code 374334 \nMeeting ID872 1472 7080 \nPasscode506054 \nIf you call in by telephone: \nPress *6 to unmute or mute yourselfPress *9 to raise your hand or lower your hand to speak  \n				\n				\n				\n				\n				Tentative Agenda\n				\nCall to Order\nRoll Call\nPublic Comment Period(Each speaker is limited to three minutes) A maximum of 15 minutes is available for the public to address the Commission on any matter on which the Commission either has not held a public hearing or is not scheduled for a public hearing later in the meeting. Speakers will be heard in the order of sign-up\, and each speaker is generally limited to a maximum of three minutes. It is strongly recommended that public comments be submitted in writing so they can be distributed to all Commission members for review. The Commission may provide more time to each speaker and can extend the public comment period beyond the normal 15-minute maximum if the Commission believes that it is necessary to allow a reasonable opportunity to hear from all members of the public who want to testify. No Commission action can be taken on any matter raised during the public comment period other than to schedule the matter for a future agenda or refer the matter to the staff for investigation\, unless the matter is scheduled for action by the Commission later in the meeting.(Steve Goldbeck) [415/352-3611; steve.goldbeck@bcdc.ca.gov]\nApproval of Minutes for May 2\, 2024 Meeting(Sierra Peterson) [415/352-3608; sierra.peterson@bcdc.ca.gov]\nReport of the Chair\nReport of the Executive Director\nCommission Consideration of Administrative Matters(Harriet Ross) [415/352-3615; harriet.ross@bcdc.ca.gov]\nPublic Hearing and Possible Vote on PG and E Programmatic Operations and Maintenance Permit 2023.002.00 The Commission will hold a public hearing and possibly vote on an application by Pacific Gas and Electric Company for a five-year operations and maintenance program for existing gas and electrical transmission structures throughout the Commission’s jurisdiction\, excluding the Suisun MarshApplication Summary Staff PresentationApplicant Presentation  (Rowan Yelton) [415/352-3613; rowan.yelton@bcdc.ca.gov]\nPublic Hearing and Possible Vote on PG and E Programmatic Operations and Maintenance Permit 2023.003.00mdThe Commission will hold a public hearing and possibly vote on an application by Pacific Gas and Electric Company for a five-year operations and maintenance program of existing gas and electrical transmission structures in the Suisun Marsh.Application Summary (Rowan Yelton) [415/352-3613; rowan.yelton@bcdc.ca.gov]\nPublic Hearing and Possible Vote on 505 East Bayshore Road Permit Application The Commission will hold a public hearing and possibly vote on an application by Regis Homes Bay Area\, LLC\, to redevelop an approximately 2.54-acre industrial parcel with a new residential project consisting of 56 for-sale townhouses\, as well as shoreline public access and open space areas\, within the Bay and 100-foot shoreline band at 505 East Bayshore Road in the City of Redwood City\, San Mateo County.Application SummaryLetter of Support Letter of SupportStaff PresentationApplicant Presentation (Katharine Pan) [415/352-3650; katharine.pan@bcdc.ca.gov]\nCommission Authorization of an Interagency Flooding and Sea Level Rise Memorandum of Understanding The Commission will receive a briefing and consider authorizing the Executive Director to enter into a Memorandum of Understanding (MOU) between BCDC and the member agencies of the Bay Area Regional Collaborative (BARC). The purpose of the MOU is to coordinate efforts to address the threats of flooding and sea level rise the San Francisco Bay Area. Attachment APresentation (Jessica Fain) [415/352-3642; jessica.fain@bcdc.ca.gov]\nAdjournment\n\n			\n				\n				\n				\n				\n				Listing of Pending Administrative Matters\n				\nThis report lists the administrative permit applications that have been filed and are pending with the Commission. The Executive Director will take the action indicated on the matters unless the Commission determines that it is necessary to hold a public hearing. The staff members to whom the matters have been assigned are indicated at the end of the project descriptions. Inquiries should be directed to the assigned staff member prior to the Commission meeting. \nAdministrative Permit Applications \n\nApplicant\n\n\n\nJ&M Paradise Properties LLCP.O. Box 2099Mill Valley\, CA 94941 \n\n\nBCDC Permit Application No. M2023.029.0\n \n\n\nFiled\nApril 25\, 2024\n\n\n90th Day\nJuly 24\, 2024\n\n\nLocation\nWithin the Commission’s Shoreline Band jurisdiction\, at 2088 Paradise Dr.\, Tiburon\, in Marin County.\n\n\nDescription\n\nRenovate and remodel a single-family home through the following activities: \n\nInstall a new 600-square-foot parking deck and driveway;\nConstruct a new\, approximately 1\,000 square-foot ADU residence with an approximately 410-square-foot deck;\nExpand the second-floor residence from 650 square feet to approximately 1\,047 square feet\, and replace a 162 square-foot deck in-kind;\nExpand the first-floor residence from 639 square feet to approximately 786 square feet\, and replace a 162 square-foot deck in-kind;\nReduce the size of the crawl space area from 584 square feet to 575 square feet;\nExpand the basement floor patio from 145 square feet to 220 square feet; and\nReplacing the existing outdoor staircases and landings\, reducing the footprint from 512 square feet to 305 square feet. The project will take place entirely within the Shoreline Band and will not result in any Bay fill. The applicant will submit an amendment request at a later date for a proposed overwater deck and boat dock. There are no existing public access requirements in the vicinity\, and no new improvements are proposed as part of this project.\n\n\n\n\nTentative Staff Position\n\nRecommend Approval with Conditions. Sam Fielding; 415/352-3665 or sam.fielding@bcdc.ca.gov \n\n\n\n\nApplicant\n\n\n\nCity of Sausalito420 Litho StreetSausalito CA 94965 \n\n\nBCDC Permit Application No. M2024.004.00 \n\n\n\nFiled\nApril 4\, 2024\n\n\n90th Day\nJuly 3\, 2024\n\n\nLocation\n\nWithin the Commission’s Bay jurisdictions\, at 466 Bridgeway\, in the City of Sausalito\, Marin County. \n\n\n\nDescription\n\nReinstall a historic sea lion sculpture\, which was originally installed in 1958\, and damaged by a storm in 2023. This project would reinstall the statue on a new concrete pedestal. The project will result in approximately 1.2 cubic yards of new fill over an approximately25-square-foot area of the Bay. Construction of the project will require a temporary detour of a sidewalk for fewer than five days. \n\n\n\nTentative Staff Position\n\nRecommend Approval with Conditions. Rowan Yelton; 415/352-3613 or rowan.yelton@bcdc.ca.gov \n\n\n\n\nApplicant\n\n\n\nNational Park ServiceLower Fort Mason Center – Building ESan Francisco\, CA 94123 \n\n\nBCDC Consistency Determination No. C2024.003.00 \n\n\n\nFiled\nApril 23\, 2024\n\n\n90th Day\nJun3 22\, 2024\n\n\nLocation\n\nWithin the Bay and the Commission’s Coastal Zone\, at the Sea Scout Base of San Francisco Maritime National Historical Park in the City and County of San Francisco. \n\n\n\nDescription\n\nRepair the existing deteriorated system of walkways\, docks\, and piers at the Sea Scout base\, through the following activities. Remove the existing: \n\n20-foot-long walkway between the concrete platform and elevated wooden pier;\n12-foot-long by 8-foot-wide portion of the existing elevated wooden pier;\n21-foot-long by 8-foot-wide metal gangway; and\nfloating 40-foot-long by 8.75-foot-wide dock. Install a new 40-foot-long by 10-foot-wide floating dock\, consisting of wood planking on floats; and a new 42-foot-long by 4-foot-wide metal gangway with metal guardrail.\n\nNo existing pilings will be removed\, and new pilings will not be installed. The project will be conditioned to minimize impacts to Bay Resources and public access in the vicinity during construction. The project will result in no solid fill in the Bay. \n\n\n\nTentative Staff Position\n\nRecommend Approval with Conditions. Sam Fielding; 415/352-3665 or sam.fielding@bcdc.ca.gov \n\n\n\nThe Commission has received the following minor amendment to the Suisun Marsh Local Protection Program for certification since the last listing. \n\nApplicant\n\n\n\nSuisun Resource Conservation District2516 Grizzly Island RoadSuisun City\, CA 94585 \n\n\nMinor Amendment to the Suisun Marsh Local Protection Program (BPA 1-23) \n\n\n\nDescription\nOn March 11\, 2022\, the Commission certified a major amendment to the Suisun Resource Conservation District (SRCD) Component of the Suisun Marsh Local Protection Program (LPP). The amendment included 121 updated Individual Ownership Adaptive Habitat Management Plans (IOAHMPs) for each privately-owned managed wetland within the Primary Management Area of the Suisun Marsh. To ensure these plans remain current\, SRCD tracks modifications to operations and updates plans on an ongoing basis. Annually\, SRCD will submit these minor amendments to the LPP for Commission certification. This listing is to notify the Commission that the Executive Director intends to certify a minor amendment to the SRCD component to the LPP\, submitted on April 19\, 2024. The amendment submitted by SRCD includes updates to facilities and operations on 10 privately-owned managed wetlands. Examples of activities described in the minor amendment include\, but are not limited to\, repairs\, replacements\, or upgrades to water control structures\, such as flaps and pipes. The activities described in the minor amendment consist of minor repairs and improvements to privately-owned managed wetland facilities and meet the requirements of Title 14 of the California Code of Regulations (CCR) Sections 11210-11215.\n\n\nTentative Staff Position\nRecommend Certification. Erik Buehmann; erik.buehmannbcdc.ca.gov\n\n\n\nApplicant\n\n\n\nPort of San FranciscoPier 1\, The EmbarcaderoSan Francisco\, CA 94111 \n\n\nBCDC Permit Application No. M2023.019.00 \n\n\n\nFiled\nApril 5\, 2024\n\n\n90th Day\nJuly 5\, 2024\n\n\nLocation\n\nWithin the Commission’s Bay jurisdictions\, at Wharf J9\, Pier 47\, in the City and County of San Francisco. \n\n\n\nDescription\n\nRemove and replace the existing dilapidated Wharf J9 mooring piles and construct a temporary floating dock\, through the following actions: \n\nRemove fifteen existing timber piles;\nInstall twelve steel piles;\nInstall a 12-foot by 270-foot floating dock;\nInstall an 8-foot by 16-foot aluminum access platform; and\nInstall an 8-foot by 12-foot steel platform with a 4-foot by 80-foot aluminum gangway connecting to the floating dock.\n\nThe dock will accommodate up to six vessels\, and allow public access to off-boat fish and crab sales. The Project is an interim action\, and is part of the Port’s longer-term Waterfront Resiliency Program redevelopment project of Wharf J9. The new floating dock would remain in place for approximately two to five years until the Wharf J9 Redevelopment project is permitted and implemented. The project will result in a net total of 3\,479 square feet of overwater fill and 5.22 cubic yards of solid fill. The project will be conditioned to minimize impacts to Bay resources and to public access in the area during construction. \n\n\n\nTentative Staff Position\n\nRecommend Approval with Conditions. Sam Fielding; 415/352-3665 or sam.fielding@bcdc.ca.gov \n\n\n			\n				\n				\n				\n				\n				Supplemental Materials\n				\nArticles about the Bay and BCDC \nChina Basin revealed: How a ‘complicated land-use deal’ yielded a new gem by the bay \n Will Travis Obituary \n			\n				\n				\n				\n				\n				Meeting Minutes\n				Minutes \n			\n				\n				\n				\n				\n				Audio Recording & Transcript\n				\nAudio recording \n \n\nTranscript\n\nCHAIR\, ZACHARY WASSERMAN: \nLET’S CALL THE ROLL. \n>>CLERK\, REYLINA RUIZ: CHAIR \nWASSERMAN? \n>>CHAIR\, ZACHARY WASSERMAN: \nHERE. \n>>CLERK\, REYLINA RUIZ: \nADDIEGO? \n>>MARK ADDIEGO: HERE. \n>>CLERK\, REYLINA RUIZ: \nCOMMISSIONER AHN? AHN HERE. \n>>CLERK\, REYLINA RUIZ: \nCOMMISSIONER BEACH? \n>>SPEAKER: PRESENT. \n>>CLERK\, REYLINA RUIZ: \nECKLUND? \n>>PATRICIA SHOWALTER: HERE. \n>>CLERK\, REYLINA RUIZ: \nGILLMOR? \n>>SPEAKER: HERE. \n>>CLERK\, REYLINA RUIZ: \nGUNTHER? \nGUN HERE. \n>>CLERK\, REYLINA RUIZ: HASZ? \n>>V. CHAIR\, KARL HASZ: HERE. \n>>CLERK\, REYLINA RUIZ: KIM \nBAIL? \n>>SPEAKER: HERE. \n>>CLERK\, REYLINA RUIZ: \nKISHIMOTO? \n>>YORIKO KISHIMOTO: HERE. \n>>CLERK\, REYLINA RUIZ: NELSON? \n>>BARRY NELSON: HERE. \n>>CLERK\, REYLINA RUIZ: \nMOULTON-PETERS? \n>>STEPHANIE MOULTON-PETERS: \nHERE. \n>>CLERK\, REYLINA RUIZ: \nPEMBERTON? \n>>SHERI PEMBERTON: HERE. \n>>CLERK\, REYLINA RUIZ: PINE? \n>>DAVE PINE: HERE. \n>>CLERK\, REYLINA RUIZ: \nCOMMISSIONER RANDOLPH? RAN. \n>>SPEAKER: HERE. \n>>CLERK\, REYLINA RUIZ: HAVE WE \nMISSED ANYONE? \n>>SPEAKER: COMMISSIONER \nJOHN-BAPTISTE. \n>>CLERK\, REYLINA RUIZ: THANK \nYOU. CHAIR WASSERMAN\, YOU HAVE \nA QUORUM. THANK YOU FOR THOSE \nOF YOU WHO ARE HERE VIRTUALLY \nWHO ARE MEETING OUR STATUTORY \nREQUIREMENT TO HAVE SOMEBODY IN \nTHE BUILDING. WE ARE NOW AT \nITEM THREE PUBLIC COMMENT SIERRA \nDO WE HAVE PEOPLE WHO HAVE \nSIGNED UP FOR PUBLIC COMMENT \nTHIS IS TO ADDRESS MATTERS THAT \nARE NOT ON OUR AGENDA TODAY FOR \nWHICH WE DO NOT HAVE A HEARING. \nYOU WILL HAVE THREE MINUTES. \n>>CLERK OF THE BOARD: THERE ARE \nNO COMMENTS IN-PERSON AND NO \nHANDS RAISED. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU. THAT BRINGS US TO MY \n— OH I’M SORRY. THAT BRINGS US \nTO APPROVAL OF THE MINUTES OF \nMAY 2ND\, 2024. WE HAVE BEEN ED \nDRAFTS OF THOSE MINUTES DO I \nHAVE A MOTION AND SECOND TO \nAPPROVE? \n>>PATRICIA SHOWALTER: I MOVE \nAPPROVAL\, PAT EKLUND. \n>>YORIKO KISHIMOTO: I’LL \nSECOND. \n>>CHAIR\, ZACHARY WASSERMAN: \nMOVED BY COMMISSIONER ECKLUND\, \nSECOND BY COMMISSIONER \nKISHIMOTO. ARE THERE ANY \nOBJECTIONS OR CORRECTIONS TO THE \nMINUTES? \n>>MARIE GILMORE: ONE \nABSTENTION. \n>>CHAIR\, ZACHARY WASSERMAN: \nCOMMISSIONER GILLMOR ABSTAINS. \n>>SPEAKER: I WILL WILL BE AB \nSTAINING. \n>>CHAIR\, ZACHARY WASSERMAN: TWO \nABSTENTIONS. THE MINUTES ARE \nAPPROVED. THAT BRINGS US TO MY \nREPORT I WANT TO START BY \nTHANKING THE GOVERNOR\, LARRY \nWILL PROVIDE ADDITIONAL DETAILIS \nWANT TO RECOGNIZE ON BEHALF OF \nTHE COMMISSION THAT THE \nGOVERNOR’S MAY BUDGET DOES \nINCLUDE FUNDING TO START \nIMPLEMENTING SB272. AND IN THIS \nVERY DIMPLE BUDGET YEAR\, WE NEED \nTO THANK HIM FOR DOING THAT AND \nHIS COMMITMENT TO SHORELINE \nRESILIENCE AND OUR — AND THIS \nIS A VERY BROAD OUR\, \nA VERY BIG TENT — ABILITY TO \nSTART DISSEMINATING THESE \nGUIDELINES AND START \nIMPLEMENTING CONSISTENCY WE THEM \nAND PROJECTS TO SAVE US ALL FROM \nTHE INUNDATION THAT IS COMING. \nI WAS PLEASED IN A NUMBER OF \nWAYS ON TUESDAY BAY \nPLANNING COALITION HOSTED THEIR \nSPRING SUMMIT FOCUSED ON \nFINANCING ADAPTATION TO RISING \nSEA LEVEL. \nTHEY HAD A FULL ARRAY OF \nSPEAKERS AND PANELISTS TALKING \nABOUT HOW THIS IS GOING HAPPEN \nAND THE NECESSARY ELEMENTS. WE \nWERE KICKED OFF WITH A KEYNOTE \nBY FORMER MAYOR LIBBY SCHAAF OF \nOAKLAND\, WHOSE THEME WAS HOPE\, \nCHANGE\, ACTION. AND SOME OF THE \nTHEMES THAT WE’RE STATED \nTHROUGHOUT THE VARIOUS SPEAKERS \nWERE\, WE DO NEED TO WORK \nTOGETHER. WE NEED TO RECOGNIZE \nTHAT WE CAN ONLY ADDRESS THIS AS \nA REGION\, THAT IT’S GOING TAKE\, \nAS WE WELL KNOW\, SOURCES\, FUNDS \nFROM MANY DIFFERENT SOURCES TO \nMEET THE COST\, THE ESTIMATED \n$110 BILLION COST\, AND WE ALL \nTHAN’S A LOW FIGURE\, A SCARY \nFIGURE\, BUT LOW FIGURE. THERE \nWAS ALSO SOME EMPHASIS ON THE \nIMPORTANCE OF STORY TELLING\, \nBOTH FOR OURSELVES AND AS WE \nCOMMUNICATE OUR ISSUES TO \nELECTED LEADERS AT ALL LEVELS \nAND TO THE PUBLIC THAT\, WE NEED \nTO KEEP IN MIND STORY THAT \nCONVEY BOTH WHAT MAY HAPPEN\, AND \nTHE WAY IN WHICH WE CAN\, IN \nFACT\, ADAPT AND FUND \nADAPTATION. \nI HAD THE CHALLENGE OF \nSUMMARIZING SOME FIVE HOURS OF \nPRESENTATIONS IN TEN MINUTES. \nAND I THINK I ROSE TO THE \nCHALLENGE. BUT IT WAS A VERY \nGOOD CONFERENCE. I WANT TO \nTHANK EVERYBODY WHO WAS AT THE \nMETRO CENTER TWO WEEKS AGO. OUR \nABILITY TO MEET TOGETHER\, I \nTHINK\, DOES ENHANCE OUR ACTIONS \nAS A COMMISSION. RECOGNIZING \nTHAT FOR MANY\, THE CONVENIENCE \nOF BEING ABLE TO ATTEND BY ZOOM \nIS IMPORTANT\, AND \nENVIRONMENTALLY BENEFICIAL. \nNONETHELESS N DOING THIS WORK\, \nWHICH IS NOT EASY\, HAVING PEOPLE \nMEET TOGETHER AND BE ABLE TO SEE \nEACH OTHER AND TALK OFFLINE A \nBIT\, IS ALWAYS VERY HELPFUL. \nCOMMISSIONER GUNTHER HAS ASKED \nFOR A COUPLE OF MINUTES TO \nCOMMENT ON THE SEA LEVEL RISE \nPRESENTATION THAT WE HEARD AND \nHE NOW HAS THE FLOOR. \n>>ANDREW GUNTHER: THANK YOU MR. \nCHAIRMAN. JUST VERY BRIEFLY\, I \nWANT TO SHARE WITH EVERYBODY \nTHAT IN THINKING ABOUT BEN \nHAMILTON’S PRESENTATION\, AND THE \nFACT THAT THE HIGH SCENARIO FOR \nSEA LEVEL RISE IS NOW LOWER\, AND \nTHAT WE WON’T SEE — WE REALLY \nDON’T HAVE A CHANCE\, ACCORDING \nTO THEIR NEW PROJECTIONS OF \nSEEING THREE METERS OF SEA LEVEL \nRISE UNTIL THE MIDDLE OF THE \n22nd CENTURY\, THAT MEANS \nEVERYTHING THAT WE’RE DOING NOW\, \nPARTICULARLY THE WETLANDS \nRESTORATION IS GOING TO RESULT \nIN ANOTHER HALF OR MAYBE A FULL \nCENTURY OF BENEFITS TO THE \nREGION BEFORE THEY’RE FINALLY \nINUNDATED. AND THE SAME THING \nGOES THROUGH FOR ANY HARD \nSTRUCTURES WE PUT IN THERE. SO\, \nI THINK IT AD ADDS TREMENDOUS \nFRAME OF THE VALUE OF WHAT WE DO \nIN THE PRESENT DAY. THAT BEING \nSAID\, I ALSO WANT TO SHARE THAT \nTHE WHOLE PROCESS OF ICE SHEET \nCOLLAPSE\, WHICH IS THE MECHANISM \nTHAT’S DRIVING THAT HIGH \nSCENARIO\, IS STILL VERY\, VERY \nUNCERTAIN. AND I HAVE A \nCOLLEAGUE LOOKING AT THESE \nISSUES FROM A CONCERNED \nSCIENTIST BOARD AND SHE SHARED \nWITH ME THAT HE THINKS IT’S A \nLITTLE TOO EARLY TO PUT THE IDEA \nIN OUR POCKET THAT WE’RE NOT \nGOING TO SEE ONE OF THESE REALLY \nEXTREME SCENARIOS. SO\, WITH \nTHAT PROVISO\, I THINK THE \nINFORMATION THAT WE GOT INFORMS \nTHE PURPOSE OF WHAT WE’RE DOING \nTODAY PARTICULARLY TO \nRESTORATION BECAUSE IT’S GOING \nTO PAY OFF FOR THE FUTURE OF THE \nREGION THAN WE THOUGHT. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU. IT’S AN IMPORTANT \nREMINDER THAT AS WE FOCUS OUR \nEFFORTS ON THE IMMEDIATE FUTURE \nIN ORDER TO PREPARE FOR A FUTURE \nTHAT IS MODERATELY FAR OFF\, THE \nTHINGS WE DO WILL BENEFIT US IN \nBETWEEN\, AS WELL. OUR NEXT \nMEETING WILL OCCUR IN TWO WEEKS\, \nON JUNE 6TH\, THE MEETING WILL BE \nHELD IN THE METRO CENTER\, AND \n— \nSORRY\, I’M PAUSING BECAUSE I \nNEED TO SWITCH BETWEEN \nDOCUMENTS. WE EXPECT THAT WE \nWILL HAVE PRESENTATIONS ON — \nSORRY. THE AGENDA WILL INCLUDE \nA PRESENTATION BY THE DEPARTMENT \nOF FINANCE DESCRIBING THE \nMISSION BASED REVIEW OF BCDC’S \nPERMITTING PROCESS AND SYSTEMS \nCONTRACT TO DEVELOPMENT REGIONAL \nSHORELINE ADAPTATION PLAN \nTECHNICAL ASSISTANCE PROGRAM AND \nTHIRD UPDATE ON PROGRESS ON THE \nCOMMISSION’S STRATEGIC PLAN. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU. THAT BRINGS US TO EX \nPARTE MATTERS. IF THERE IS ANY \nCOMMISSIONER WHO WISHES TO \nREPORT ON A COMMUNICATION \nCONCERNING A COMMISSION MATTER\, \nTHAT THEY HAVE NOT ALREADY PUT \nON THE RECORD\, NOW IS THE TIME \nTO SHARE THAT.   THIS IS ON \nADJUDICATORY MATTERS\, NOT \nMISCELLANEOUSLY MATTERS OF \nPOLICY\, AND YOU DO NEED TO FILE \nSOMETHING IN WRITING. BUT NOW \nIS THE TIME TO SPEAK\, AND I SEE \nCOMMISSIONER ECKLUND HAS HER \nHAND UP. \n>>PATRICIA SHOWALTER: NOT EX \nPARTE I WANTED TO QUESTION YOU \nSAID IT WAS AT THE METRO CENTER \nWE CAN COME INTO THE OFFICE OR \nINTO THE MEETING ROOMS THAT WAS \nYOUR POINT. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU FOR HELPING ME \nEMPHASIZE PARTICULARLY AS WE \nTALK ABOUT THE STRATEGIC PLAN I \nTHINK HAVING AS MANY THERE AS \nPOSSIBLE MAKES IT A PRODUCTIVE \nMEETING. \n>>PATRICIA SHOWALTER: THANKS \nFOR CLARIFYING THAT. WASN’T \nQUITE SURE WHAT THAT MEANT. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU. THAT BRINGS US TO \nTHE REPORT OF THE EXECUTIVE \nDIRECTOR. \n>>LARRY GOLDZBAND: THANK YOU \nCHAIR WASSERMAN\, JUST TO LET \nPEOPLE KNOW THAT COMMISSIONER \nGILMORE IS HAVING SOME TECHNICAL \nISSUES SO SHE’LL BE TRYING TO \nGET BACK IN IF SHE’S NOT HERE \nNOW. FIRST I WANT TO APOLOGIZE \nTO THE COMMISSION\, AND AGAIN TO \nSTEVE GOLDBECK FOR HAVING TO \nVACATE THIS BUILDING TWO WEEKS \nAGO 15 MINUTES PRIOR TO THE \nCOMMISSION MEETING\, WHICH MEANS \nTHAT STEVE HAD TO SIT IN MY \nCHAIR UNEXPECTEDLY AND I MISSED \nHIS ANNOUNCEMENT OF HIS \nRETIREMENT. I HAD ALREADY JUST \nA FEW MINUTES EARLIER THAT MY \nWIFE HAD TESTED FOR COVID SO I \nFIGURED YOU ALL WOULD BE MUCH \nHAPPIER IF I LEFT THE OFFICE AND \nBEGAN TO ISOLATE. THAT I DID\, \nALTHOUGH I HAD TO TAKE BART TO \nGET HOME SO I WE’RE A MASK. \nWHILE LOOKING OUT THE WINDOW AT \nBART I SMILED AT HOW FAST I \nCOULD GET TO OUR HOME OVER 20 \nMILES AWAY. NOT ALWAYS THE CASE \nOF COURSE LINOLEATE HAS IT ON \nTHIS DAY MAY 18th FIRST \nREGULARLY SCHEDULED MISSISSIPPI \nSTEAMBOAT HEADED SOUTH LIKELY AT \nFOUR MILES PER HOUR. A GREAT \nCOINCIDENCE 134 YEARS LATER ON \nTHIS DATE THE FIRST REGULARLY \nSCHEDULED AIRPLANE SERVICE \nBETWEEN NEW YORK AND LONDON \nBEGAN JUST AS TRAVEL TIMES \nCONTINUE TO GET SHORT YOU CAN \nGET STUCK IN A 90 MINUTE TRAFFIC \nJAM JUST TO GET TO THE BAY \nBRIDGE AS WE DID ON SUNDAY AFTER \nTHE GIANTS GAME. WITH REGARD TO \nBUDGET AND STAFFING BCDC HAS \nSELECTED ALYSSA PLEASE TO JOIN \nKATHARINE PAN SHORELINE \nDEVELOPMENT PERMITTING TEAM AS A \nCOASTAL PROGRAM ANALYST ALYSSA \nIS A GOLDEN BEAR HAVING EARNED \nHER UNDERGRADUATE DEGREE FROM \nCAL LANDSCAPE TECHNICAL \nENVIRONMENTAL PLANNING JOINS \nENVIRONMENTAL IMPACT REPORTS AND \nGENERAL PLAN POLICY DEVELOPMENT \nRELATED TO COASTAL PLANNING \nCLIMATE CHANGE VULNERABILITY. \nGREATER NEWS CHAIR WASSERMAN \nGOVERNOR NEWSOME’S MAY REVISE \nBUDGET PLAN INCLUDES FULL \nFUNDING FOR BCDC AND THE COASTAL \nCOMMISSION TO HIRE STAFF TO \nIMPLEMENT SB272 LEGISLATION \nAUTHORED BY SENATOR JOHN LAIRD \nREQUIRING LOCAL GOVERNMENTS TO \nCREATE RISING SEA LEVEL \nADAPTATION PLANS THAT EITHER WE \nOR THE COASTAL COMMISSION WILL \nNEED TO APPROVE. YESTERDAY I \nSPENT THE DAY IN SACRAMENTO \nWATCHING ASSEMBLY AND SENATE \nBUDGET HEARINGS\, AND I THINK \nTHAT I’M HAPPY TO REPORT THAT \nNONE OF THE QUESTIONS FROM THE \nMEMBERS DEALT AT ALL WITH RISING \nSEA LEVEL FUNDING\, LEADING US\, \nPERHAPS TO HOPE THAT NOBODY WILL \nQUESTION ITS IMPORTANCE. \nLEADERSHIP OF THE RESOURCES \nAGENCY RECOGNIZES THE IMPORTANCE \nOF THE SMALL AMOUNT OF FUNDING \nIN THE GOVERNOR’S PLAN AND I \nKNOW THEY WILL BE WORKING ON OUR \nBEHALF. MORE INFORMATION TO \nCOME WHEN WE RECEIVE IT. \nNOW FOR SOME NOT SO GREAT BUDGET \nNEWS\, AS PART OF THE BUDGET PLAN \nBCDC AND ALL OTHER STATE \nORGANIZATIONS WILL FAIRS FACE A \nGENERAL FUND CUT OF SOMETHING \nLIKE 8% NEXT YEAR WE HAVE \nSTARTED TO PLAN FOR IT AND WILL \nKEEP YOU UPDATED ON \nRAMIFICATIONS. GOOD NEWS\, MANY \nOF OUR STAFF ALONG WITH \nCOMMISSIONER AHN TO MY RIGHT \nPARTICIPATED IN A WORKSHOP WITH \nOUR ENVIRONMENTAL JUSTICE \nADVISERS LAST WEEK AS PART OF \nTHE ORGANIZATIONALITY \nDEVELOPMENT CONSULTING CONTRACT \nTHAT AIMS TO INCREASE \nCOMMUNICATION AND ALIGNMENT \nBETWEEN BCDC AND OUR ADVISERS. \nEACH OF US WHO ATTENDED HAVE \nREALTY POSITIVE THOUGHTS ABOUT \nTIME SPENT TOGETHER AND WE HAVE \nTALKED AT LENGTH HOW TO BEST \nWORK AS COLLAB RURALITYS I AM \nSURE WE’LL HAVE MORE TO REPORT \nIN THE FUTURE. I’M RELATIONSHIP \nTO REPORT THAT THE SEAPORT PLAN \nYOU APPROVED LAST NOVEMBER HAS \nBEEN APPROVED BY CALIFORNIA’S \nOFFICE OF ADMINISTRATIVE LAW \nTHIS PAST TUESDAY THEREFORE THE \nNEW SEAPORT PLAN IS NOW IN \nEFFECT. GREAT NEWS GOVERN ALL \nTHE WORK THAT CORY AND THE TEAM \nPUT INTO IT STARTING\, REMEMBER\, \nWITH THE HOWARD TERMINAL ISSUE. \nFULL OF GOOD NEWS TODAY \nESPECIALLY TO MY LEFT AS \nCOMMISSIONER BEACH WATCHES. \nTHIS WEEK THE U.S. ARMY CORP OF \nENGINEERS 2024 WORKPLAN WAS \nRELEASED AND WE’RE EXCITED TO \nNOTE THAT THE CORP HAS RECEIVED \nFUNDING TO INCLUDE THE BEL MARIN \nKEYS UNIT INTO THE HAMILTON \nWETLANDS PROJECT WHICH WILL \nBRING THE TOTAL HABITAT \nRESTORATION TO 26\,000 ACRES AS A \nRESULT OF OUR 2016 COALITION \nTHAT SPURRED CHANGES TO THE \nAUTHORIZING LEGISLATION THE CORP \nWILL SPEND ANOTHER $7 MILLION TO \nINCREASE BENEFICIAL REUSE OF \nSEDIMENT IN THE BAY DURING THE \nNEXT YEAR. TWO FINAL NOTES\, \nFIRST PERHAPS SOMETHING OF AN \nANTIDOTE TO THE GIANT’S \nDISAPPOINTING FIRST QUARTER OF \nBASEBALL\, I URGE TO YOU STRONGLY \nVISIT — I URGE TO YOU STRONGLY \nVISIT THE NEW CHINA BASIN PARK \nACROSS McCOVEY COVE FROM THE \nBALLPARK I WAS POSITIVELY \nTHRILLED TO ASK TO SPEAK AT THE \nGRAND OPENING LATE LAST MONTH \nAND IT’S TREMENDOUS. AT THE \nBCDC PERMIT THERE IS AN AUDIO \nTOUR OF THE SHORELINE FROM THE \nFERRY BUILDING DOWN TO MISSION \nROCK NOW KNOWN AS CHINA BASIN \nPARK THAT IS NOW LIVE IT’S A FEW \nYEARS LATE\, A DIFFERENT FORM OF \nPUBLIC ACCESS THAN WHAT BCDC \nNORMALLY REQUIRES FOR SURE AND \nWE’RE WORKING WITH GIANTS TO \nMAKE SURE IT’S PUBLICIZED WELL. \nFINALLY ANOTHER NOTICE FOR THE \nBCDC BOOK CLUB. COMMISSIONER \nAHN’S NEW BOOK ENTITLED \nADVOCATE\, A GRAPHIC MEME WHAT OF \nFAMILY\, COMMUNITY\, AND THE FIGHT \nFOR ENVIRONMENTAL JUSTICE IS NOW \nAVAILABLE FOR PURCHASE. IT’S \nABSOLUTELY SUPERB AND IF YOU \nFOLLOW COMMISSIONER AHN ON \nSOCIAL MEDIA\, YOU WILL KNOW WHY\, \nAND WE ALL RECOMMEND IT HIGHLY. \nIN ADDITION THE COMMISSIONER HAS \nASSURED US THAT HE IS MORE THAN \nHAPPY TO SIGN ALL AVAILABLE \nCOPIES AT A SMALL PRICE. WITH \nTHAT\, CHAIR WASSERMAN\, I’M HAPPY \nTO ANSWER ANY QUESTIONS. \n[LAUGHTER] \n>>CHAIR\, ZACHARY WASSERMAN: ANY \nQUESTIONS FOR LARRY? \n>>EDDIE AHN: A QUICK COMMENT \nFROM COMMISSIONER AHN. THERE IS \nNO PRICE. IT WILL BE DONE \nABSOLUTELY FREE OF CHARGE \n[LAUGHTER] \nTHANK YOU\, THOUGH. VERY MUCH \nAPPRECIATE YOUR PRAISE FOR THE \nBOOK. \n>>CHAIR\, ZACHARY WASSERMAN: \nWELL\, THERE IS A PRICE\, YOU NEED \nTO BUY THE BOOK\, AND YOU \nSHOULD. \nBUT NO PRICE FOR THE SIGNATURE. \nI WAS ACTUALLY DISAPPOINTED THAT \nWE ARE NOT ALL TOGETHER\, BECAUSE \nI HAVE MY BOOK AND HOPE TO GET \nHIM TO SIGN T BUT I WILL \nHOPEFULLY DO THAT AT OUR NEXT \nMEETING. \nONE OF THE THINGS SAID REMINDS \nME OF ONE THING I WANT TO NOTE\, \nTHERE WAS A REPORT IN THE SAN \nJOSE MERCURY LAST WEEK ABOUT THE \nHOWARD TERMINAL SETTLEMENT\, THE \nSETTLEMENT OF THE CLAIM BY \nPACIFIC MARITIME ASSOCIATION AND \nOTHERS AGAINST BCDC REGARDING \nOUR ACTIONS\, AND THERE WAS A \nSTATEMENT IN THAT ARTICLE THAT \nWE HAD IN THAT SETTLEMENT\, MADE \nA DEAL AND CHANGED THE TERMS OF \nWHAT WAS GOING ON TO PUT THE \nHOWARD TERMINAL BACK INTO THE \nSEAPORT PLAN. THAT IS NOT \nACCURATE. WE MADE NO CHANGE IN \nTHE DEAL. WE SIMPLY DISMISSED \n— AGREED TO DISMISS THE \nLAWSUIT. STATE LAW WHICH \nAUTHORIZED THE USE BY THE AS OF \nHOWARD TERMINAL\, HAD AN \nEXPIRATION DATE IN IT WHEREBY IF \nTHE PORT AND THE A DESERT NOT \nREACH A BINDING AGREEMENT\, BY A \nDATE\, WHICH I THINK WAS SOMETIME \nTHIS YEAR\, SOMEBODY MAY CORRECT \nME ON THAT — IT — THE \nEXCLUSION OF THE PROJECT\, FROM \nTHE TIDE LANDS TRUST\, OR THE \nDETERMINATION THAT THAT USE WAS \nCONSISTENT WITH THE TIDE LANDS \nTRUST WOULD EXPIRE\, WE DID NOT \nMAKE ANY CHANGE IN IT WE WILL \nCONVEY THIS TO THE MERCURY. I \nKNOW THE PORT OF OAKLAND KNOWS \nTHAT\, BUT WE WILL MAKE THAT \nCLEAR\, AS WELL. \nTHAT BRINGS US TO ITEM SEVEN\, \nCONSIDERATION OF ADMINISTRATIVE \nMATTERS. WE HAVE RECEIVED THE \nADMINISTRATIVE — THE DRAFT OF \nADMINISTRATIVE MATTERS. \nARE THERE ANY PUBLIC COMMENTS \nON THE ADMINISTRATIVE LIST? \n>>CLERK OF THE BOARD: NO HANDS \nRAISED. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU VERY MUCH. I SEE \nNOTHING FROM COMMISSIONERS. SO\, \nONCE AGAIN\, DIRECTOR ROSS GETS \nOFF WITHOUT BEING GRILLED. \nONE OF THESE DAYS\, YOU MAY FIND \nYOU’RE GETTING GRILLED. THAT \nBRINGS US TO ITEMS 8 AND 9\, \nWHICH WE ARE GOING TO COMBINE \nAND HEAR AS ONE ITEM. THEY ARE \nVERY SIMILAR. THEY INVOLVE TWO \nDIFFERENT GEOGRAPHIC AREAS\, BUT \nTHE ISSUES ARE ESSENTIALLY \nSUBSTANTIALLY THE SAME. THESE \nARE HEARINGS AND POSSIBLE VOTES \nON PACIFIC GAS AND ELECTRIC \nAPPLICATION FOR NEW FIVE-YEAR \nPROGRAMMATIC OPERATIONS \nMAINTENANCE PERMIT EXISTING \nELECTRIC TRANSMISSION STRUCTURES \nTHROUGHOUT THE COMMISSION’S \nJURISDICTION OUTSIDE SUISUN \nMARSH AND INSIDE SUISUN MARSH \nWHERE WE DO HAVE SOME \nJURISDICTION. THE PRESENTATION \nWILL BE — SO\, WE’RE HAVING ONE \nPUBLIC HEARING TO COVER BOTH OF \nTHESE ISSUES. ROWAN YELTON OF \nOUR STAFF WILL MAKE THE STAFF’S \nINTRODUCTION AND THEN INTRODUCE \nSPEAKERS FROM PG&E. \n>>ROWAN YELTON: THANK YOU CHAIR \nWASSERMAN. IS THAT SHOWING UP? \n>>CHAIR\, ZACHARY WASSERMAN: \nIT’S SHOWING UP WITH YOUR NOTES \nWHICH YOU MAY OR MAY NOT WANT. \n>>CHAIR\, ZACHARY WASSERMAN: GOT \nIT. \n>>ROWAN YELTON: MY NAME IS \nROWAN YELTON\, I AM A COASTAL \nPROGRAM ANALYST ON THE BAY \nRESOURCES TEAM. \n>>LARRY GOLDZBAND: FOR YOU ALL \nWHO ARE ONLINE THERE IS \nCONSTRUCTION OUTSIDE METRO \nCENTER THAT’S MAKING IT HARD FOR \nUS TO HEAR. I’M LOOKING AT YOU \nALL SO I WANT TO KNOW IF YOU CAN \nHEAR\, PLEASE RAISE YOUR HANDS. \nIF YOU CAN’T HEAR — ALL RIGHT\, \nROWAN\, YOU’RE GOING TO NEED TO \nYELL INTO THAT MICROPHONE. USE \nYOUR OUTSIDE VOICE. \n>>ROWAN YELTON: OKAY I’LL USE \nMY OUTSIDE VOICE. I’M \nPRESENTING TWO PERMIT \nAPPLICATIONS FOR OPERATIONS AND \nMAINTENANCE PROGRAM PROPOSED BY \nTHE PACIFIC GAS AND ELECTRIC \nCOMPANY. APPLICATIONS ARE FOR \nFIVE YEARS PROGRAMS OF \nMAINTENANCE REPAIR REPLACEMENT \nREMOVAL RETIREMENT AND \nMODIFICATION OF PG&E FACILITIES \nACTIVITIES WOULD BE LIMITED TO \nEXISTING FACILITIES AND \nSTRUCTURES AND WOULD NOT RESULT \nIN PERMANENT NET BAY FILL THOUGH \nSOME TEMPORARY FILL WOULD BE \nINSTALLED FOR SITE ACCESS. \nTHERE WOULD NOT BE PERMANENT \nADVERSE IMPACTS TO PUBLIC \nACCESS. \nBASED ON THE APPLICATION\, WE \nEXPECT THAT HUNDREDS OF PROJECTS \nWILL BE CONDUCTED UNDER THIS \nPERMIT EACH YEAR. MOST PROJECTS \nINVOLVE REPAIRS TO ELECTRICAL \nTOWERS AND POLES SUCH AS \nREPAIRING CRACKS AND TOWER \nFOUNDATIONS TRIMMING VEGETATION \nNEAR TOWERS AND LINES AND \nREPLACING DAMAGED HARDWARE \nINSTIGATEULARITIES AND \nSTRUCTURAL COMPONENTS OF TOWERS \nAND POLES. LESS FREQUENT \nACTIVITIES INCLUDE REPLACEMENT \nOF ENTIRE STRUCTURES SUCH AS \nTOWERS AND PIPELINES. THE \nPROGRAM WOULD INCLUDE ACTIVITIES \nIN ALL NINE COUNTY BAY AREAS\, \nBCDC’S BAY SHORELINE BAND\, WATER \nWAYS SALT PONDS AND MANAGED \nWETLANDS JURISDICTIONS THE \nPROGRAM SPLIT INTO TWO \nAPPLICATIONS ONE FOR ACTIVITIES \nPRIMARY MANAGEMENT AREA OF THE \nSUISUN MARSH AND FOR ALL OTHER \nLOCATIONS THE TWO PERMITS WOULD \nHAVE IDENTICAL AUTHORIZATIONS \nAND SPECIAL CONDITIONS AND ONLY \nDIFFER IN FINDINGS. BCDC \nPREVIOUSLY ISSUED TWO PERMITS \nFOR SIMILAR OPERATION AND \nMAINTENANCE PROGRAMS IN 1987 AND \n1989. THESE PERMITS WERE \nREPEATEDLY AMENDED AND EXTENDED \nAND WILL BOTH EXPIRE ON MAY \n30TH\, 2024. IN 2021\, PG&E \nAPPLIED FOR FIVE-YEAR EXTENSIONS \nTO BOTH PERMITS. WHEN \nAPPLICATIONS WERE RECEIVED BCDC \nSTAFF REVIEWED THE EXISTING \nPERMITS AND DETERMINED THAT THEY \nWERE OUTDATED FOR THE FOLLOWING \nREASONS: AUTHORIZATIONS WERE NO \nLONGER SUFFICIENT TO COVER ALL \nOF PG&E’S ACTIVITIES AND SPECIAL \nCONDITIONS NEEDED SIGNIFICANT \nCHANGES TO BRING THEM UP-TO-DATE \nWITH CURRENT BCDC LAWS AND \nPOLICIES\, ENGINEERING CODES AND \nSTANDARDS\, CURRENT STATE OF THE \nBAY ENVIRONMENT\, AND OUR \nSCIENTIFIC UNDERSTANDING OF THE \nBAY ENVIRONMENT. \nSO\, THE PREVIOUS PERMITS WERE \nPERMITTED ADMINISTRATIVELY\, BUT \nAT THIS TIME WE ARE LOOKING TO \nISSUE MAJOR PERMITS \nFOR THEM BECAUSE ALTHOUGH EACH \nINDIVIDUAL ACTIVITY QUALIFIES AS \nMINOR REPAIRS OR IMPROVEMENTS \nTHE PERMITS WOULD COVER A LARGE \nNUMBER OF PROJECTS OVER THE \nENTIRE BAY AREA OVER FIVE YEARS \nTHEY CANNOT BE REASONABLY \nCONSTRUED AS A SINGLE ACTIVITY \nAND SHOULD NOT BE PERMITTED \nADMINISTRATIVELY. WHEN WRITING \nTHE STAFF RECOMMENDATION OUR \nCONCERN WAS ENSURING THAT THE \nPROJECTS WOULD NOT HAVE \nSIGNIFICANT PERMIT IMPACTS OR \nENVIRONMENT OR PUBLIC ACCESS \nIMPACTS ADDRESSING CONCERNS TO \nSPECIAL CONDITIONS INCLUDED \nREQUIRE PERMITTEE TO RESTORE \nCONSTRUCTION SITES TO ORIGINAL \nCONDITION OR BETTER WHERE \nAPPROPRIATE ENVIRONMENTAL WORK \nAVOID MINIMIZE PUBLIC ACCESS \nIMPACTS BEST MANAGEMENT OF \nPRACTICES IN MARSHES IN THE BAY \nAND SENSITIVE HABITATS COMPLY \nWITH CONDITIONS OF APPROVALS BY \nTHE RESOURCE AGENCIES SPECIAL \nCONDITION LIMIT TO ALLOW \nACTIVITIES THAT DO NOT RESULT IN \nINCREASE TO BAY FILL DURATION OF \nTEMPORARY FILL LESS THAN 180 \nDAYS PER PROJECT LIMIT \nRELOCATION AND REDECISION OF \nSTRUCTURES AND DISALLOW \nPERMANENT ADVERSE IMPACTS TO \nPUBLIC ACCESS. PROPOSAL REVIEW \nPROCESS ALL ACTIVITIES REQUIRE \nBCDC STAFF APPROVAL BEFORE THEY \nCAN BE CONDUCTED EXCEPT FOR \nLIMITED CATEGORY ACTIVITIES THAT \nWOULD NOT BE EXPECTED TO RESULT \nIN ADVERSE IMPACTS TO THE \nENVIRONMENT OR PUBLIC ACCESS AND \nDO NOT INVOLVE ANY WATERWORKS. \nSOME EXAMPLES OF ACTIVITIES \nINCLUDE REPLACING MINOR \nSTRUCTURAL COMPONENTS AND \nEQUIPMENT\, PAINTING AND \nVEGETATION TRIMMING. FOR ALL \nACTIVITY WHICH IS COULD RESULT \nIN ADVERSE IMPACTS TO THE BAY OR \nENVIRONMENT OR PUBLIC ACCESS OR \nWOULD INVOLVE WATERWORKS THE \nPERMIT WOULD BE REQUIRED TO \nSUBMIT ACTIVITY PROPOSAL BASED \nON FORM INCLUDED AS EXHIBIT TO \nTHE PERMIT BCDC STAFF WOULD THEN \nREVIEW ACTIVITY FOR CONSISTENCY \nWITH THE PERMIT YOU \nAUTHORIZATION AND CONDITIONS IF \nSTAFF FIND THE PROJECT IS NOT \nCONSISTENT WITH PERMITS AND PG&E \nWILL HAVE TO SUBMIT AN \nINDIVIDUAL PERMIT APPLICATION \nSPECIAL CONDITIONS ALSO INCLUDED \nTO REQUIRE APPLICANT TO SUBMIT \nANNUAL REPORTS ON THE ACTIVITIES \nCONDUCTED OVER THE PAST YEAR \nCUMULATIVELY SINCE PERMIT WAS \nISSUED AND IF THE ACTIVITY IS \nPROJECTED FOR UPCOMING YEAR \nFIVE-YEAR PROJECTED WORKPLAN FOR \nREPAIR AND REPLACEMENT OF \nELECTRICAL TOWERS IN BCDC \nJURISDICTION. AS YOU LEARN MORE \nABOUT THIS PROGRAM FROM THE PG&E \nSTAFF PRESENTATION\, \nTO KEEP IN MIND TIDAL \nFLATS\, FISH\, AQUATIC ORGANISMS\, \nWILDLIFE MITIGATION PUBLIC \nACCESS AND SHORELINE BAND \nAND MARSH PLANS LAND USE AND \nMARSH MANAGEMENT POLICY THE \nCOMMISSION SHOULD CONSIDER \nWHETHER THE PROPOSED PROJECT IS \nCONSISTENT WITH THE \nMCATEER-PETRIS ACT APPLICABLE TO \nSAN FRANCISCO BAY PLAN POLICIES \nSPECIFICALLY WHETHER THE FILL \nRESULTS IN RESULTING PROJECTS \nUPON CONSISTENT WITH REGULATIONS \nSECTION 66605 AND THAT FILL IS \nMINIMUM NECESSARY AND DESIGNED \nTO MINIMIZE HARM RECALL EFFECTS \nOF THE FILL. AND WHETHER \nSPECIAL CONDITIONS OF PERMIT ARE \nAPPROPRIATE TO AVOID MINIMIZE \nADVERSE IMPACTS TO THE PUBLIC \nACCESS AND BAY ENVIRONMENT. \nTHAT CONCLUDES THE STAFF \nPRESENTATION AND I’LL NOW \nINTRODUCE KYLE STAPLE MAN\, TIM \nANDREWS\, JOHN WILCOX FROM PG&E F \nTHEIR PRESENTATION OF THE \nPROGRAM. \n>>SPEAKER: THANKS ROWAN. \n>>SPEAKER: GO AHEAD JOHN. \n>>JON WILCOX: ARE YOU ABLE TO \nRUN THE PRESENTATION? WE DIDN’T \nWORK OUT THE LOGISTICS WITH \nBCDC. \n>>SPEAKER: I’M PULLING UP THE \nPRESENTATION NOW\, IF YOU CAN \nCONFIRM YOU SEE IT? \n>>JOHN WILCOX: I SEE T I’LL \nKICK US OFF. THANK YOU\, FIRST \nOF ALL\, CHAIR WASSERMAN AND THE \nCOMMISSIONERS\, TO LOOK AT OUR \nPERMIT APPLICATION. AS ROWAN \nSAID\, AND THIS IS SOMETHING WE \nHAVE BEEN WORKING ON FROM THE \n’80s OFF A PREVIOUS PERMIT THIS\, \nIS SOLELY FOR OUR OWN ACTIVITIES \nIN AND AROUND THE BAY SO WE LOOK \nFORWARD TO GETTING THIS NEW \nPERMIT PUT IN PLACE\, GETTING \nPROCESSES IN PLACE AND WORKING \nTO\, YOU KNOW\, A GOOD FUTURE WITH \nUS\, WITH BCDC AS WE HAVE THIS \nPERMIT ACTIVE IN THE FUTURE. \nWITH THAT\, I’LL INTRODUCE TIM \nANDREWS WHO IS THE MANAGER OF \nOUR WATER PROGRAM. TIM\, ARE YOU \nABLE TO PRESENT? SORRY. WE \nHAVE A LITTLE BIT OF ISSUE ON \nOUR SIDE. PG&E DOESN’T \nNECESSARY HE ALLOW US TO USE \nZOOM SO WE’RE TRYING TO DO IT \nVIA PHONES FOR SOME FOLKS. \n>>SPEAKER: TIM SAID SAID HE MAY \nNOT — HE’S RUNNING INTO \nTECHNICAL DIFFICULTIES. I CAN \nTAKE IT OVER FOR HIM. GOOD \nAFTERNOON COMMISSION STAFF AND \nCOMMISSIONERS. MY NAME IS TYLER \nSTAPLE MAN. \n>>JON WILCOX: TYLER YOU’RE A \nLITTLE QUIET. CUYLER YOU’RE A \nLITTLE QUIET. CUYLER \n. \n>> CUYLER: CAN YOU HEAR ME? MY \nNAME IS CUYLER STAPLE MAN\, \nPLANNER AT PG&E I HAVE BEEN \nWORKING WITH BCDC STAFF AND PG&E \nSTAKE R STAKEHOLDERS ON THE \nDEVELOPMENT OF THIS PERMIT FOR \nTHE PAST COUPLE OF YEAR OR SO \nTODAY IS THE BIDAY AND LOOKING \nFORWARD TO THE DISCUSSION AFTER \nTHE PRESENTATION. I WANT TO DO \nA QUICK OVERVIEW OF OUR AGENDA \nTOPICS HERE IN THIS \nPRESENTATION. I’M GOING TO GO \nOVER PROGRAM NEED AND PURPOSE \nBACKGROUND OF OUR WORK\, \nACTIVITIES WE’RE SEEKING TO GET \nAUTHORIZED BY THESE PERMITS\, \nEXAMPLES OF WHAT THOSE \nACTIVITIES ARE\, AND THE ACTIVITY \nCLASSES THAT HAVE BEEN \nINCORPORATED INTO THIS PERMIT\, \nAND OVERVIEW OF THE POTENTIAL \nIMPACTS AND THE SPECIAL \nCONDITIONS THAT WE WILL BE \nIMPLEMENTING DURING OUR \nOPERATIONS AND MAINTENANCE \nPROGRAM. I REALIZE SOME OF THIS \nIS — MAY BE REPETITIVE FROM THE \nINFORMATION THAT WAS JUST \nPRESENTED\, SO\, I’LL TRY TO \nSTREAMLINE WHERE POSSIBLE. \nPG&E’S MISSION IS TO DELIVER \nCLEAN SAFE RELIABLE AFFORDABLE \nENERGY TO OUR CUSTOMERS\, THIS \nMEANS WE MUST ROUTINELY INSPECT \nMAINTAIN AND OPERATE OUR \nFACILITIES TO ACHIEVE THAT \nGOAL. \nWE FEEL THAT THE PURPOSE OF THIS \nO&M PLAN IS TO MAINTAIN THE \nENERGY TRANSMISSION AND \nDISTRIBUTION FACILITIES TO \nDELIVER THAT ENERGY TO OUR \nCUSTOMERS. AND IN DOING SO\, AND \nMAINTAINING SAFE AND RELIABLE \nFACILITIES\, WE’LL BE DOING OUR \nPART IN BEING GOOD STEWARDS TO \nTHE BAY ENVIRONMENT AND THE \nRESOURCES UNDER BCDC’S \nJURISDICTION. \nPG&E HAS BEEN CONDUCTING ROUTINE \nOPERATIONS AND MAINTENANCE WORK \nWITHIN BCDC’S JURISDICTION UNDER \nPERMITS THAT WERE INITIALLY \nEFFECTIVE IN 1987. THEY HAVE \nBEEN EXTENDED NUMEROUS TIMES IN \nTHE CURRENT EXTENSIONS EXPIRE \nMAY 31ST OF THIS YEAR. UNDER \nTHESE NEW PERMITS WE PROPOSE TO \nCONTINUE THAT OPERATIONS AND \nMAINTENANCE PLAN WITH NEW \nSPECIAL CONDITIONS AND \nNOTIFICATION AND REPORTING \nPROCEDURES WITH BCDC. \nSO\, AGAIN THIS\, PERMIT WOULD \nAUTHORIZE PG&E TO PERFORM THIS \nROUTINE WORK FOR A PERIOD OF \nFIVE YEARS WITH AN OPTION TO \nRENEW AT THE END OF THE TERM. \nAND THIS O&M WORK WILL BE \nCONDUCT THE UNDER TWO SEPARATE \nPERMITS\, ONE FOR SUISUN MARSH \nPRIMARY MANAGEMENT AREA\, AND THE \nOTHER PERMIT FOR ALL OTHER \nPORTIONS OF BCDC’S JURISDICTION\, \nALONG THE SAN FRANCISCO BAY. \nAGAIN\, THE ACTIVITIES WE’LL BE \nPERFORMING WILL BE SIMILAR TO \nACTIVITIES WE HAVE BEEN \nPERFORMING UNDER EXISTING \nPERMITS WITH NEW SPECIAL \nCONDITIONS. \nSO\, THE FOLLOWING MAPS SHOW THE \nLOCATIONS OF PG&E WORK THAT WE \nCONDUCTED UNDER THE EXISTING \nPERMITS IN 2022 AND 2023\, AS \nWELL AS WORK WE’RE PLANNING FOR \n2024 AND 2025. I WANT TO \nBRIEFLY POINT OUT SOME ITEMS ON \nTHIS LEGEND IN THE FOLLOWING \nMAPS BCDC’S JURISDICTION IS \nSHADED IN A PURPLE COLOR\, AND \nTHE PROJECTS FROM 2022 TO 2025 \nARE SHOWN AS POINTS. ONE THING \nTO KEEP IN MIND IS THAT THE \nDISTINCTION BETWEEN TRANSMISSION \nAND DISTRIBUTION FACILITIES. \nSO\, WHEN PG&E TALKS ABOUT OUR \nFACILITIES THERE\, IS TWO MAJOR \nCATEGORIES THAT THINK WE OF\, \nTRANSMISSION AND DISTRIBUTION. \nAND TO UNDERSTAND THE DIFFERENCE \nIT’S REALLY IMPORTANT TO KEEP IN \nMIND THAT ENERGY ISN’T ALWAYS \nCONSUMED WHERE IT’S PRODUCED. \nSO\, WHEN WE THINK ABOUT \nTRANSMISSION FACILITIES\, THESE \nFACILITIES TRANSMIT ENERGY \nRESOURCES OVER LONG DISTANCES\, \nBETWEEN THE LOCATIONS ITS \nPRODUCED AND WHERE IT’S \nCONSUMED. ELECTRIC TRANSMISSION \nSYSTEM MAY BE HIGHER VOLTAGE \nWITH LARGER POLES\, AND A GAS \nTRANSMISSION SYSTEM HAS A LARGER \nDIAMETER PIPELINE. FOR \nDISTRIBUTION SYSTEMS\, THESE \nSYSTEMS DELIVER ENERGY DIRECTLY \nTO THE END USER\, OUR \nCUSTOMERS. \nDISTRIBUTION POLE\, ELECTRIC \nDISTRIBUTION POLE ARE THOSE \nYOU’RE LIKELY TO SEE IN YOUR \nCOMMUNITY OR NEIGHBORHOOD\, AND A \nGAS DISTRIBUTION PIPELINE IS \nGENERALLY SMALLER. \nTO GIVE PG&E STAFF AND \nCOMMISSIONERS A SENSE OF THE \nAMOUNT OF INFRASTRUCTURE WE HAVE \nIN THE JURISDICTION\, I \nRAN SOME NUMBERS WITH OUR GIS \nDEPARTMENT AND WANT TO SHARE \nTHOSE WITH YOU TODAY. WE HAVE \nOVER 520 MILES OF ENERGIZED \nELECTRICAL CONDUCTOR WITHIN YOUR \nJURISDICTION AND THOSE \nCONDUCTORS ARE SUPPORTED BY 829 \nTOWERS\, AND OVER 4\,900 POLES AND \nSIMILAR SUPPORT STRUCTURES. \nTHOSE 829 TOWERS MAY BE ACCESSED \nBY OVER 180 MILES OF BOARDWALK \nIN THE BAY AND WE ALSO HAVE OVER \n65 MILES OF NATURAL BAS \nPIPELINE. ALL OF THESE ASSETS \nMUST BE INSPECTED\, MAINTAINS AND \nOPERATED TO ENSURE FAY OUR \nFACILITIES PROVIDE SAFE RELIABLE \nENERGY TO OUR CUSTOMERS. \nTHE ACTIVITIES AUTHORIZED BY \nTHESE PERMITS ARE THOSE THAT WE \nROUTINELY PERFORM TO MEET OUR \nGOALS. UNDER THIS PERMIT\, THESE \nACTIVITIES WILL BE LIMITED TO \nTHE MAINTENANCE OF EXISTING \nFACILITIES RATHER THAN THE \nCONSTRUCTION OF NEW FACILITIES. \nTHE PERMIT WILL CATEGORIZE OUR \nOPERATION AND MAINTENANCE \nACTIVITIES INTO FOUR CLASSES\, \nWHICH WE’LL DISCUSS IN A FEW \nMORE SLIDES. BUT I WANTED TO \nNOTE THAT THE PERMIT WAS WRITTEN \nWITH BROAD LANGUAGE INTENDED TO \nCOVER MOST OF OUR ROUTINE \nOPERATIONS AND MAINTENANCE \nWORK. \nHOWEVER ANY ACTIVITY THAT \nDOESN’T FALL WITHIN THESE \nACTIVITY CLASSES OR WITHIN THE \nAUTHORIZED ACTIVITY DEFINITIONS\, \nPG&E WILL SEEK SEPARATE \nAUTHORIZATION FROM BCDC. EXCUSE \nME\, SO\, THE MAJORITY OF \nACTIVITIES WE EXPECT TO PERFORM \nUNDER THIS PERMIT ARE WHAT WE \nREFER TO AS OVERHEAD ACTIVITIES \nWHICH CONSIST OF REPLACING \nOR REPAIRING OR REPLACING OF \nEQUIPMENT AT TOP OF UTILITY \nPOLES AND TOWERS ACTIVITIES \nDON’T REQUIRE ANY GROUND \nDISTURBANCE OR EXCAVATION ON THE \nGROUND\, ACTIVITIES OVERHEAD MAY \nINCLUDE REPLACING \nINSTIGATEULARITIES AND HANGING \nPLATES THAT SUSPEND ELECTRIFIED \nCONDUCTORS FROM TOWERS AND POLES \nAS WELL AS REPAIRING HIGH WIRES\, \nVOLTAGE SIGNS AND REPLACING \nBOLTS THESE ARE DEMON MOUSE \nCLASS ACTIVITIES MENTIONED ON \nTHE SLIDE EXPECTING TO PERFORM \n500 OVERHEAD ACTIVITIES DURING \nTHE FIVE-YEAR PERMIT TERM. IN \nADDITION TO OVERHEAD ACTIVITIES \nWE’RE EXPECTING TO REPLACE 25 \nMILES OF BOARDWALK REPLACE 50 \nPOLES\, TOWERS\, AND TOWER \nFOUNDATIONS AND REPLACE SECTIONS \nOF FIVE GAS PIPELINES OVER THE \nNEXT FIVE YEARS. \nSO PERMITS INCLUDE FOUR ACTIVITY \nCLASSES WITHIN WHICH PG&E WILL \nHAVE SPECIFIC REVIEW\, \nNOTIFICATION\, AND REPORTING \nREQUIREMENTS TO FOLLOW. IN \nGENERAL\, ACTIVITIES WITH LESS \nENVIRONMENTAL RISK WILL BE \nREVIEWED AND AUTHORIZED MORE \nQUICKLY THAN ACTIVITIES THAT \nHAVE POTENTIAL TO IMPACT PUBLIC \nACCESS OF BAY RESOURCES. CLASS \nONE ACTIVITIES DO NOT INVOLVE \nANY IMPACTS TO PUBLIC ACCESS OR \nTHE BAY\, AND DO NOT INVOLVE ANY \nIN WATERWORKS. THESE ARE THOSE \nOVERHEAD ACTIVITIES I PREVIOUSLY \nREFERRED TO. \nPG&E WILL BE PROCEEDING WITH \nTHIS WORK AT OUR DISCRETIONARY \nDURING — UNDER — DURING THIS \nPERMIT\, HOWEVER WE’LL BE \nREPORTING TO BCDC ANNUALLY\, A \nSUMMARY OF CLASS ONE ACTIVITIES \nPERFORMED. \nTHE SECOND ACTIVITY CLASS IS \nCLASS TWO AND WITHIN CLASS TWO\, \nTHERE ARE TWO SUBTYPES. CLASS \nTWO. A AND 2B. CLASS TWO \nACTIVITIES WILL OCCUR IN THE \nSHORELINE BAND\, THEY MAY INVOLVE \nSMALL AMOUNTS OF FILL AND \nEXTRACTION. THEY DO NOT INVOLVE \nANY WATERWORKS. NOW\, THE \nDIFFERENCE BETWEEN 2A AND 2B IS \nCLASS 2A IS LIMITED TO WORK THAT \nDOES NOT IMPACT PUBLIC ACCESS\, \nWHEREAS CLASS 2B MAY INCLUDE \nTEMPORARY PUBLIC ACCESS \nIMPACTS. \nCLASS THREE ACTIVITIES ARE THE \nROUTINE OPERATIONS AND \nMAINTENANCE ACTIONS THAT HAVE \nPOTENTIAL TO RESULT IN IMPACTS \nTO BAY RESOURCES INCLUDING FISH \nAND WILDLIFE AND TIDAL MARSHES \nHOWEVER THE SPECIAL CONDITIONS \nREQUIRED BY THIS PERMIT AND PG&E \nPROGRAMMATIC MAINTENANCE PERMITS \nWITH RESOURCES AGENCIES \nSIGNIFICANT ADVERSE IMPACTS TO \nRESOURCES WILL NOT OCCUR FROM \nIMPLEMENTATION OF CLASS THREE \nACTIVITIES. CLASS THREE \nACTIVITY MAY INCLUDE REPLACING \nOF CONCRETE FOOTING OF AN \nEXISTING STEEL TRANSMISSION \nTOWER IN THE TIDAL MARSH THAT \nMAY INVOLVE EXCAVATION OR GROUND \nDISTURBANCE WITHIN THE TIDAL \nMARSH. \nTHIS SLIDE IS BRIEFLY \nSUMMARIZING THE IMPACTS THAT MAY \nRESULT FROM PG&E’S OPERATIONS \nAND MAINTENANCE ACTIVITIES UNDER \nTHIS PERMIT. AS ROWAN \nPREVIOUSLY MENTIONED\, WE DO NOT \nEXPECT ANY SIGNIFICANT NET \nINCREASE IN BAY FILL. WHILE \nPG&E EXPECTS TO REPLACE OVER 100 \nCUBIC YARDS PLACE OVER \n140 CUBIC QUARTERS OF FILL \nWITHIN BCDC’S JURISDICTION THIS \nFILL WILL BE OFFSET BY REMOVAL \nOF EXISTING FILL OF ROUGHLY \nEQUAL AMOUNTS\, FOR EXAMPLE\, IF \nWE REPLACE A POLE WE’LL INSTALL \nAND REPLACE POLE NEW POLE AND \nBASE STAYS AT ROUGHLY ZERO. \nPERMIT ALSO LIMITS PUBLIC ACCESS \nSCENIC VIEW IMPACTS FROM PG&E \nFACILITIES PROJECTS WITH \nPERMANENT ADVERSE IMPACTS TO BAY \nRESOURCES  PUBLIC ACCESS WILL \nNOT BE AUTHORIZED BY THIS \nPERMIT. \nTO BRIEFLY MENTION PREVIOUSLY\, \nTHESE PERMITS WILL REQUIRE PG&E \nTO EMPLOY A STANDARD OF BEST \nMANAGEMENT PRACTICES WHILE \nPERFORMING ALL AUTHORIZED \nACTIVITIES. ADDITIONALLY THE \nPERMIT HAS A NUMBER OF \nCONDITIONS THAT PG&E MUST FOLLOW \nTO AVOID OR MINIMIZE IMPACTS TO \nRESOURCES REGULATED BY BCDC. \nSUCH AS FISH\, WILDLIFE\, AND \nTIDAL MARSH. \nFURTHERMORE\, PG&E’S BIOLOGISTS \nWILL BE REVIEWING MAINTENANCE \nWORK WITH POTENTIAL TO IMPACT \nBIOLOGICAL RESOURCES TO IDENTIFY \nSPECIFIC RESOURCES PROTECTION \nMEASURES NEEDED TO AVOID IMPACTS \nTO RESOURCES DURING WORK \nEXECUTION THESE PROJECTS \nSPECIFIC MEASURES WILL BE \nDOCUMENTED IN A BIOLOGICAL \nREPORT SENT TO BCDC’S WITH THE \nWORK NOTIFICATION PACKAGE. \nTHE LAST ITEM I WANTED TO POINT \nOUT IS THE SPECIAL CONDITIONS \nREQUIRED BY THIS PERMIT ARE \nCONSISTENT WITH THE RESOURCE \nAGENCY PERMITS PG&E HAS FOR \nOPERATIONS AND MAINTENANCE \nPLANNING INCLUDING THE BAY AREA \nHABITAT CONSERVATION PLAN \nAUTHORIZED BY THE OFFICIAL \nWILDLIFE SERVICE\, THE BAY AREA \nINCIDENTAL PERMIT BY DEPARTMENT \nOF FISH AND WILDLIFE AS WELL AS \nOUR OPERATIONS AND MAINTENANCE \nPERMIT PERFORM FROM REGIONAL \nWATER QUALITY BOARD AND U.S. \nARMY CORP. WITH THAT SAID \nTHAT’S THE END OF THE \nPRESENTATION. I’LL TURN IT BACK \nTO BCDC F QUESTIONS AND \nDISCUSSION. THANK YOU. \n>>CHAIR\, ZACHARY WASSERMAN: DO \nWE HAVE ANY QUESTIONS FROM THE \nPUBLIC OR COMMENTS FROM THE \nPUBLIC. \n>>CLERK OF THE BOARD: NO HANDS \nRAISED IN-PERSON OR ON ZOOM. \n>>CHAIR\, ZACHARY WASSERMAN: I \nWILL OPEN THE PUBLIC HEARING AND \nJUST TO BE VERY CLEAR\, BECAUSE I \nSHOULD HAVE DONE IS THAT BEFORE\, \nWHAT I JUST DID\, WE STILL HAVE \nNOBODY FROM THE PUBLIC WISHING \nTO COMMENT\, IS THAT CORRECT \nSIERRA? \n>>CLERK OF THE BOARD: THAT’S \nCORRECT. \n>>CHAIR\, ZACHARY WASSERMAN: WE \nDO HAVE TWO COMMISSIONER HANDS \nRAISED\, COMMISSIONER ECKLUND. \n>>PATRICIA SHOWALTER: THANK YOU \nVERY MUCH\, CHAIR. \nMY QUESTION IS THAT YOU \nINDICATED THAT THERE WOULDN’T BE \nANY ADVERSE IMPACTS ON PUBLIC \nVIEWS OR WHATEVER. BUT IS THERE \nANY OPPORTUNITIES WHERE WE CAN \nIMPROVE THE PUBLIC ACCESS AND \nVIEWS BY MAKING SOME CHANGES? \nTHAT’S MY FIRST QUESTION. MY \nSECOND QUESTION IS — \n>>SPEAKER: [INDISCERNIBLE]\n \nTHAT’S WHY I GOT FEEDBACK. \n>>PATRICIA SHOWALTER: PARDON \nME? OVERDOES AND THE \n— THE SECOND QUESTION I HAVE \nIS YOU SHOWED THE BIG TOWERS ARE \nTHERE ANY TOWERS THAT ARE GOING \nTO BE REPLACED? IF YOU COULD \nCLARIFY THAT? \n>>JON WILCOX: YES WE ARE GOING \nTO REPLACE TOWERS AND WILL \nPROVIDE A PLAN OVER THE NEXT \nFIVE YEARS TO BCDC OF THOSE \nTOWERS THAT WILL BE REPLACED \nWE’RE GOING THROUGH THAT\, THAT’S \nTHE BIG DRIVER FOR RENEWING THIS \nPERMIT. BECAUSE THOSE TOWERS \nARE SITTING IN SALT WATER\, THEY \nGET BEAT UP PRETTY BAD\, AND THEY \nNEED TO BE REPLACED EVERY NOW \nAND THEN. WITH REGARDS TO THE \nOTHER ONE ABOUT IMPROVEMENT\, SO\, \nWE ARE DOING THINGS OF APPROVING \nOR LINING SOME BOARDWALKS TO \nBETTER LOCATIONS THAT MAKE LESS \nIMPACTS THAT’S OUT THERE\, THIS \nIS REALLY AT THE HEART OF \nO&M TO HANDLE THE EQUIPMENT AND \nFACILITIES THAT ARE CURRENTLY IN \nPLACE THAT WOULD TRIGGER OTHER \nTHINGS LIKE RIGHT OF WAY\, \nACCESS\, AND OTHER PERMITS THAT \nWOULD BE NEEDED ABOVE AND BEYOND \nOF JUST FIXING THE ASSETS THAT \nARE CURRENTLY IN THAT LOCATION. \n>>PATRICIA SHOWALTER: OKAY. \nAND THEN\, I GUESS THAT \nCLARIFICATION ON THOSE METAL \nTOWERS\, YOU SAID THAT THEY WOULD \nBE REPLACED\, BUT ARE — YOU SAID \nTHAT THAT WAS GOING TO BE A \nSEPARATE PERMIT APPLICATION TO \nBCDC? WAS THAT CORRECT? \n>>JON WILCOX: NOT A SEPARATE \nPERMIT IT WOULD BE PROVIDED IN \nTHE REPORT WE’RE PROVIDING TO \nBCDC THAT’S WHAT’S CREATED UNDER \nTHIS NEW PERMIT. \n>>PATRICIA SHOWALTER: SO ARE \nYOU GOING TO BE COORDINATING \nWITH CITIES AND COUNTIES ON \nGETTING A PERMIT? BECAUSE I \nJUST HAD AN SPECIALTY RECENTLY \nTHAT PG&E WAS GOING TO BE \nWORKING ON A PARTICULAR \nTELECONFERENCE POLE. \n>>PAT ECKLUND: APPARENTLY THEY \nFORGOT TO GET A PERMIT. DO YOU \nHAVE A DOUBLE CHECK TO MAKE SURE \nTHAT PERMITS ARE APPLIED FOR AND \nRECEIVED BEFORE WORK IS ACTUALLY \nIN THE SHADED\, OR LETTERS GO OUT \nTO FOLKS? \n>>JON WILCOX: YES THAT’S ALL OF \nOUR PERMIT PLANNING PROCESS IT’S \nNOT JUST CITIES AND COUNTIES WE \nHAVE STATE AGENCIES AND THERE IS \nOVERLAY. WE HAVE A PROCESS\, \nPRESIDENT MATTICS\, WITH THE FEDS \nAND STATE THAT REQUIRE \nREPORTING\, BEST MANAGEMENT \nPRACTICES\, OR AVOIDANCE MEASURES \nTHAT WE PUT IN PLACE\, AS WELL. \nSO\, THAT’S IN THERE AND THERE IS \nA CHECK PROCESS THAT GOES \nTHROUGH OUR ENVIRONMENTAL \nPLANNING GROUP TO TAKE CARE OF \nTHINGS AS FAR AS CITIES AND \nCOUNTIES THAT’S A DIFFERENT \nGROUP CALLED EPWC BUT THEY \nHANDLE THE — IN THIS CASE\, IF \nYOU HAVE TO GET A PERMIT TO SHUT \nDOWN A ROADWAY FROM THE CITY AND \nCOUNTY ENCROACHMENT TYPE PERMITS \nTHEY WORK ON THAT AS WELL. \n>>PAT ECKLUND: I UNDERSTAND I \nWORKED FOR THE ARM I CORP OF \nENGINEERS AND U.S. ENVIRONMENTAL \nPROTECTION AGENCY FOR 43 YEARS \nSO I UNDERSTANDS ALL OF THAT. \nTHANK YOU VERY MUCH FOR \nANSWERING MY QUESTION. \n>>SPEAKER: THANK YOU. \n>>SPEAKER: TO ANSWER THE \nQUESTIONS ABOUT THE ELECTRICAL \nTOWERS\, THE PERMIT IS — \nRESTRICTS THE ACTIVITIES TO \nPROJECTS THAT WOULDN’T REQUIRE \nANY ADDITIONAL COMPENSATORY \nMITIGATION. SO\, WHEN PG&E WOULD \nPROPOSE SOMETHING LARGE AND \nIMPACTFUL LIKE A TOWER \nREPLACEMENT\, OUR STAFF WOULD USE \nTHE ACTIVITY REVIEW PROCESS\, \nWHICH IS SPECIAL CONDITION OF \nTHE PERMIT TO ASSESS WHETHER \nTHAT ACTIVITY IS CONSISTENT WITH \nTHE PERMIT AUTHORIZATION \nAND SPECIAL CONDITIONS AND \nWHETHER THE SPECIAL CONDITIONS \nARE SUFFICIENT TO PREVENT \nPERMANENT ADVERSE IMPACTS THAT \nWOULD REQUIRE COMP PENS TORE \nMITIGATION. SO THERE MIGHT BE \nSOME CASE WHERE IS A SPECIFIC \nTOWER REPLACEMENT PROJECT WOULD \nREQUIRE AN INDIVIDUAL PERMIT. \nHOWEVER\, THERE ARE SOME CASES \nWHERE PG&E\, I BELIEVE\, IS \nPLANNING ON REPLACING TOWERS IN \nDIFFERENT LOCATIONS\, AND THIS \nWOULD BE ALLOWED UNDER THIS \nPERMIT WHEN THE RELOCATION OF \nTHE TOWER WOULD MOVE THE TOWER \nOUT OF BCDC JURISDICTION\, \nENTIRELY\, WILL MOVE THE TOWER \nFROM THE BAY JURISDICTION INTO \nTHE SHORELINE BAND\, OR THE \nMOVEMENT WOULD RESULT IN \nSIGNIFICANTLY LESS BAY FILL OR \nSIGNIFICANTLY IMPROVED PUBLIC \nACCESS OR VIEWS. AND THE \nRELOCATION WOULD NOT HAVE \nSIGNIFICANTLY GREATER ADVERSE \nENVIRONMENTAL IMPACTS COMPARED \nTO REPLACING THE TOWER IN THE \nSAME PLACE. \n>>PAT ECKLUND: THANK YOU VERY \nMUCH FOR CLARIFYING THAT. THAT \nWAS ONE OF MY CONCERNS THAT I \nHAD. SO\, THANK YOU VERY MUCH. \n>>CHAIR\, ZACHARY WASSERMAN: \nCOMMISSIONER NELSON? YOU’RE \nMUTED\, BARRY. \n>>BARRY NELSON: I’M GETTING AN \nECHO\, I’M NOT SURE WHY. \nCAN YOU HEAR ME NOW? \n>>CHAIR\, ZACHARY WASSERMAN: \nYES. \n>>ANDREW GUNTHER: TWO \nQUESTIONS. THE FIRST IS\, IT \nSOUNDS AS THOUGH THERE ARE A \nCOUPLE OF WAYS IN WHICH THIS \nPERMIT COULD PRODUCE PUBLIC OR \nENVIRONMENTAL BENEFITS \nRELOCATING THE TOWERS AS ROWAN \nJUST MENTIONED\, POTENTIALLY\, \nOUTSIDE OF OUR BAY JURISDICTION\, \nAND EVEN TO OUR SHORELINE BANNER \nUPLAND JURISDICTIONS\, AND \nREDUCTION IN BAY FILL FROM \nCONSOLIDATED OR REMOVING BOARD \nWALKS\, GIVEN THERE ARE 25 MILES \nOF BOARD WALKS TO REPLACE\, \nTHAT’S A PRETTY SIGNIFICANT \nNUMBER. SO I’M ASKING IF THE \nREPORTING PROCESS IN THIS PERMIT \nWILL HELP US UNDERSTAND THOSE \nBENEFITS OVER TIME\, IF THERE ARE \nINDEED THOSE KINDS OF \nSIGNIFICANT BENEFITS GIVEN THE \nSCALE OF OPERATIONS OVER THE \nLENGTH OF THIS PERMIT\, IS THE \nREPORTING GOING TO ALLOW US TO \nDETECT THOSE BENEFITS? \n>>SPEAKER: YEAH. FOR ALL OF \nTHE LARGER PROJECTS THAT ARE \nREQUIRED\, THE REVIEWS IN THE \nCLASS TWO OR CLASS THREE\, SUCH \nAS THE REPLACEMENT OF \nSTRUCTURES\, REMOVAL\, REPLACEMENT \nOF BOARD WALKS\, THAT KIND OF \nTHING\, THE ANNUAL REPORTS WOULD \nBE REQUIRED TO REPORT ON THOSE \nPROJECTS BOTH THAT ARETIVELY\, \nAND WITH THE RAW DATA OF THINGS \nLIKE\, HOW — WHAT THE NET FILL \nDIFFERENCE WAS. SO THAT OUR \nSTAFF CAN REVIEW HOW THIS \nPROGRAM IS GOING AND SEE IF \nTHERE ARE UNEXPECTED BENEFITS OR \nTHINGS THAT WE WOULD WANT TO \nCHANGE THE NEXT TIME THE PERMIT \nCOMES UP FOR RENEWAL. \n>>BARRY NELSON: SECOND \nQUESTION. GIVEN — IF THIS WAS \nA LAND PERMIT F THIS WERE A \nCAPITAL PERMIT OF THIS SIZE AND \nSCALE AND SCOPE\, I AM CERTAIN \nTHAT WE WOULD BE REQUIRING \nSIGNIFICANT PUBLIC ACCESS GIVEN \nOUR REQUIREMENT TO PROVIDE \nMAXIMUM PUBLIC ACCESS CONSISTENT \nWITH A PROJECT. BUT THIS IS AN \nO&M PERMIT\, NOT A CAPITAL \nPERMIT. SO\, CAN YOU HELP US \nUNDERSTAND\, GIVEN THE SIZE OF \nTHIS PERMIT\, HOW STAFF HAS \nTHOUGHT ABOUT PUBLIC ACCESS\, \nJUST TO MAKE SURE THAT WE’RE — \nWE DON’T WANT TO DOUBLE DIP\, IF \nTHERE WERE CAPITAL — IF THERE \nWERE REQUIREMENTS FOR PUBLIC \nACCESS REGARDING FOR SOME OF \nTHESE PROJECTS WHEN THEY WERE \nORIGINALLY CONSTRUCTED WE DON’T \nWANT TO DOUBLE DIP BUT AT THE \nSAME TIME WE WANT TO MAKE SURE \nWE’RE APPROPRIATELY THINKING \nABOUT PUBLIC ACCESS REQUIREMENTS \nFOR BIG LONG-TERM O&M PROJECTS. \n>>SPEAKER: YEAH. SO\, AS WE \nWERE GOING THROUGH THE \nAPPLICATION PROCESS\, WE \nSERIOUSLY CONSIDERED WHETHER WE \nWOULD BE — WHATEVER THIS \nPROGRAM WOULD REQUIRE PUBLIC \nACCESS IMPROVEMENTS. AND THE \nFACT IS THAT THE PROGRAM WOULD \nONLY INVOLVE ACTIVITIES ON \nEXISTING STRUCTURES. IT \nWOULDN’T INVOLVE ANY INCREASES \nIN USE OR SIGNIFICANT CHANGES IN \nUSES. AND THERE WOULDN’T BE ANY \nPERMIT PUBLIC ACCESS IMPACTS. \nSO STAFF DETERMINED THAT THERE \nWASN’T AN APPROPRIATE NEXUS TO \nREQUIRE PUBLIC ACCESS \nIMPROVEMENTS. \n>>BARRY NELSON: ARE THERE OTHER \nEXAMPLES OF LONG-TERM \nPERMITS LIKE THIS THAT DON’T \nHAVE PUBLIC ACCESS REQUIREMENTS? \n>>SPEAKER: YEAH. WE HAVE \nSEVERAL LONG-TERM O&M PERMITS \nWITH  DIFFERENT PUBLIC \nAGENCIES\, CALTRANS\, SANTA CLARA \nVALLEY WATER\, EAST BAY \nPARK DISTRICT\, CARGILL. THERE \nARE A LOT OF THEM. AND I DON’T \nBELIEVE THAT ANY OF THEM HAVE \nPUBLIC ACCESS IMPROVEMENTS \nREQUIRED. \n>>BARRY NELSON: THAT’S ALL. IF \nI COULD — \n>>SPEAKER: — [INDISCERNIBLE]\n \n>>SPEAKER: APP UP AGAIN. \n>>BARRY NELSON: CAN YOU HEAR \nME? \n>>SPEAKER: YES. \n>>SPEAKER: THE PERM FOCUS IN \nPUBLIC ACCESS A LOT OF FOCUS IS \nACTUALLY AVOIDING IMPACTS TO \nPUBLIC ACCESS DURING THESE KINDS \nOF WORK THAT PG&E NEEDS TO KEEP \nELECTRICITY AND THE GAS \nFLOWING. \nTHAT’S REALLY WHAT THE PERMIT \nPROVIDES FOR IS MAKING SURE \nTHERE AREN’T SIGNIFICANT \nLONG-TERM IMPACTS TO THE \nEXISTING PUBLIC ACCESS WITH THE \nPROJECT WE ARE THINKING ABOUT \nPUBLIC ACCESS BUT IT WAS MORE IN \nTHAT LIGHT\, WE REALIZE THE \n99\, I DON’T KNOW THE NUMBER BUT \nMOST OF THESE THINGS ARE VERY \nSMALL LIKE REPLACING RESISTORS \nOR THINGS LIKE THAT\, THAT AREN’T \nPHENOMENAL. \n>>CHAIR\, ZACHARY WASSERMAN: \nCOMMISSIONER KISHIMOTO? \n>>YORIKO KISHIMOTO: MY QUESTION \nIS ABOUT MAYBE THE LARGER \nPROBLEMS. YOU CAN TALK A LITTLE \nBIT ABOUT THE STAGING AREAS THAT \nMIGHT BE REQUIRED? I GUESS \nTHERE WAS SOME DISCUSSION ABOUT \nTHAT THERE. BUT YOU TALK ABOUT \nBOARDWALKS\, BUT — WHAT KIND OF \nHEAVY EQUIPMENT DO YOU \nPOTENTIALLY NEED FOR\, LIKE\, THE \nWORK ON THE LARGER TOWERS? AND \nHOW MANY LARGE STAGING AREAS DO \nYOU ANTICIPATE HAVING TO BUILD \nAND POTENTIALLY MITIGATE FOR? \n>>CUYLER STAPLEMANN: THANK YOU \nFOR YOUR QUESTION. I CAN JUMP IN \nHERE. A LOT OF OUR ELECTRIC \nTRANSMISSION TOWERS ARE IN THE \nBAY. THEY DO HAVE BOARDWALK \nACCESS. BUT WE PERFORM A LOT OF \nWORK ON THOSE TOWERS\, ESPECIALLY \nAT THE TOPS OF THOSE TOWERS\, BY \nHELICOPTER. SO IMPORTANT — \nTHERE IS LOTS OF RESTRICTION \nWHERE IS WE CAN SAFELY FLY \nSPECIFIC DISTANCES WE CAN’T \nCROSS PUBLIC ROADS WITHOUT \nTRAFFIC CONTROL WE TRY TO \nLOCATION THOSE HELICOPTER \nLANDING ZONES AS CLOSE TO THE \nWORK LOCATIONS AS POSSIBLE IT’S \nA SAFETY ISSUE FOR OUR WORKERS \nAS WELL AS THE PUBLIC I CAN’T \nREALLY SPEAK TO THE VOLUME OF \nLANDING ZONES\, ZONES MAY BE \nREQUIRED PER YEAR BUT GENERALLY \nTHEY ARE LOCATED ON EXISTING \nPAVED SURFACES \nLOTS\, DISTURBED AREAS THEY’RE \nSTAGE A COUPLE OF POLES AND \nINSTIGATEULARITIES AND SLIDE \nTHEM OUT TO THE WORK LOCATIONS\, \nIN THE CASE OF LARGER TOWER \nPROJECT THERE WOULD BE \nADDITIONAL TEMPORARY \nCONSTRUCTION EASTMENT OR WORK \nAREAS OUTSIDE OF OUR RIGHT OF \nWAY THAT WOULD NEED\, SORT OF\, A \nTEMPORARY RIGHT FROM THE \nPROPERTY OWNER\, AND THOSE WOULD \nGENERALLY BE LOCATED IMMEDIATELY \nIN THE VICINITY OF THE TOWER DUE \nTO A TOWER IN THE TIDAL MARSH\, \nTHOSE WORK AREAS YOU WOULD\, \nAS SMALL AS POSSIBLE TO REDUCE \nIMPACTS AND WE CAN’T ACCESS BY \nBARGE OFTENTIMES WE’LL HAVE \nEQUIPMENT ON BARGES AND THROW \nTHEM RIGHT UP TO THE TOWERS. \nBUT IN RARE OCCASIONS WE WILL \nNEED TO PLACE MATTING SOME REVE \nEQUIPMENT. \n>>YORIKO KISHIMOTO: YEAH THAT \nHELPS EITHER HELICOPTER OR BARGE \nBECAUSE YOU COULDN’T BRING HEAVY \nEQUIPMENT ALONG THE BOARDWALK. \nTHAT’S IT. \n>>SPEAKER: THE PERMITS WOULD \nALSO INCLUDE SPECIAL CONDITION \nREQUIRING RESTORATION OF \nTEMPORARY IMPACTS TO TIDAL MARSH \nIF THEY’RE EXPECTED IN A \nPROJECT. AND THESE ACTIVITIES \nTHAT ARE AUTHORIZED BY THIS \nPERMIT WOULD BE LIMITED TO THOSE \nTHAT PG&E EXPECTS TO BE ABLE TO \nBE PASSIVELY RESTORED WITHIN TWO \nYEARS. SO\, SOME OF THE LARGER \nTOWER REPLACEMENTS THAT WOULD \nREQUIRE MORE VEGETATION \nCLEARING\, MORE MATTING\, THOSE \nMIGHT BE KICKED OUT OF THIS \nPERMIT AND REQUIRE AN INDIVIDUAL \nPERMIT IF THE RESTORATION WOULD \nBE EXPECTED TO TAKE LONGER\, OR \nTHERE WOULD BE PERMIT IMPACTS. \n>>YORIKO KISHIMOTO: THANK YOU. \n>>CHAIR\, ZACHARY WASSERMAN: \nCOMMISSIONER GUNTHER? \n>>ANDREW GUNTHER: YOU CAN GUYS \nHEAR ME? \n>>SPEAKER: YEAH. \n>>SPEAKER: SPEAK UP A LITTLE \nBIT. \n>>ANDREW GUNTHER: CAN YOU HEAR \nME NOW? \n>>SPEAKER: YEAH. \n>>ANDREW GUNTHER: IT’S THE \nSETTINGS. CAN YOU HEAR ME? \n>>CHAIR\, ZACHARY WASSERMAN: \nYES. \n>>ANDREW GUNTHER: WE’RE GETTING \nSOME FEEDBACK HERE. QUICK \nQUESTION. THANK YOU FOR ALL OF \nTHE DETAIL IN YOUR \nPRESENTATION. \n>>CHAIR\, ZACHARY WASSERMAN: WE \nCAN BARELY HEAR YOU ANDY. \n>>ANDREW GUNTHER: YOU CAN \nDESCRIBE HOW YOU ARE \nCONSIDERING\, AS YOU PREPARE AND \nUPGRADE FACILITIES\, I ASSUME YOU \nARE THINKING ALSO ABOUT THE \nFUTURE CLIMATE IN WHICH THESE \nFACILITIES WILL NEED TO BE \nOPERATED. CAN YOU SAY A LITTLE \nBIT ABOUT THAT? AND WHETHER AS \nWE’RE WORKING TO IN THE AREA \nAROUND THE BAY WHETHER THERE ARE \nPOSSIBILITIES OF\, SORT OF\, \nMULTI-BENEFIT KIND OF WORK THAT \nYOU CAN DO — BECAUSE I KNOW YOU \nDON’T GO OUT TO THESE SITES \nREALLY THAT OFTEN. \n>>JON WILCOX: WE HAVE TEAMS \nLOOKING AT SEA LEVEL RISE AND \nIMPACT. WE HAVE SUBSTATIONS \nTHAT ARE CLOSE\, RAVENSWOOD IN \nPARTICULAR\, THINGS THAT ARE \nTRIGGERED FOR SEA LEVEL RISE WE \nSPEND A LOT OF TIME IF TOWERS \nNEED TO BE RAISED\, TO ADDRESS \nTHAT\, AND THOSE ISSUES OCCUR. \nWE HAVE A BIG TEAM AND THEY’RE \nDEFINITELY SPENDING TIME \nREVIEWING THAT. AND SOME OF THE \nPROJECT WORK YOU’RE GOING TO SEE \nIS PROTECTING SEA LEVEL RISE \nTHOSE ARE PROJECTS COMING \nTHROUGH RIGHT NOW\, TO YOUR \nQUESTION ABOUT MULTI-BENEFIT\, I \nTHINK THAT’S GOING TO GO TO EACH \nPROJECT WHAT WE CAN DO. WE WORK \nCLOSELY WITH THE JOINT VENTURE \nAND A LOT OF GROUPS SEEING WHAT \nWE CAN DO TO WORK TOGETHER. WE \nDIDN’T — WE HAVE THESE OTHER \nPROGRAMMATICS AS I MENTIONED \nBEFORE AND THOSE TRIGGER A LOT \nOF MITIGATION OUT THERE\, LIKE \nFISH AND WILDLIFE SERVICE AND \nCFW AND WE’RE WORKING WITH THEM \nTO CREATE LARGE-SCALE MITIGATION \nPROJECTS AS OPPOSED TO POSTAGE \nSTAMP STUFF DONE BEFORE \nHISTORICALLY THOSE ARE THINGS WE \nCAN DO TO WORK WITH JOINT \nVENTURE AND BOTH FEDS AND STATE \nAGENCIES AND LAND AGENCIESES TO \nCREATE BENEFITS RESTORATION \nOPPORTUNITIES. THERE ARE AREAS\, \nWE’RE WORKING WITH A MITIGATION \nBANK DEVELOPER WHERE WE’RE \nSWITCHING AN EASEMENT TO AN \nARIEL EASEMENT THAT WOULD NEVER \nPUT ANYTHING DOWN\, DON EDWARDS \nREFUGE RIGHT NOW THOSE ARE THE \nTHINGS COMING UP\, BUT BENEFICIAL \nASPECTS SEA LEVEL RISE ARE HIGH \nIN OUR MIND WE HAVE ASSETS THAT \nARE IN THE MIDST OF BEING \nIMPACTED. \n>>ANDREW GUNTHER: THAT’S KIND \nOF WHAT I FIGURED AND I WANT TO \nMAKE SURE ONCE YOU’RE OUT THERE \nTOUCHING THESE FACILITIES THAT \nEVERYTHING — ALL THE CAPITAL WE \nINVEST IN THIS COMMUNITY NOW \nNEEDS TO BE DONE IN THAT \nMANNER. \nTHAT’S GREAT. THANK YOU VERY \nMUCH. \n>>CHAIR\, ZACHARY WASSERMAN: \nCOMMISSIONER MOULTON-PETERS? \n>>STEPHANIE MOULTON-PETERS: \nTHANK YOU. I HAD A QUICK \nFOLLOW-UP QUESTION FOR JON\, YOU \nREFERRED TO SOMETHING CALLED A \nJOINT VENTURE\, JON\, AND I WAS \nCURIOUS WHAT THAT WAS WITH \nREGARD TO THE MITIGATION \nPROJECTS THAT YOU DO. \n>>JON WILCOX: IT’S THE SAN \nFRANCISCO BAY JOINT VENTURE\, WE \nSIT ON THAT BOARD AS WELL — I’M \nSORRY\, THE BAY AREA JOINT \nVENTURE PROGRAM\, THAT WE SIT ON\, \nWE’RE EXPLORING WITH THEM \nOPPORTUNITIES FOR RESTORATION \nTHAT EXIST OUT THERE CURRENTLY \nRIGHT. WE CAN LEVERAGE\, FOR \nEXAMPLE\, WE HAVE PROPERTY CALLED \nANTIOCH DUNES THAT WAS PART OF \nTHE REFUGE\, WE DONATED THAT BACK \nTO THE REFUGE TWO YEARS AGO IT’S \nA BIG EXPANSION. WEIGH DO WHAT \nWE CAN AS FAR AS WORKING \nTOGETHER\, THE BENEFITS ON \nMITIGATION SIDE\, BUT ALSO \nBENEFITS WHAT WE’RE CAN DO AND \nPUT INTO A REFUGE TYPE SITUATION \nOR RESTORATION\, RIGHT THOSE ARE \nTHE THINGS WE’RE LOOKING AT. \n>>STEPHANIE MOULTON-PETERS: \nGREAT. THANK YOU. \n>>CHAIR\, ZACHARY WASSERMAN: I \nDON’T SEE ANY OTHER HANDS \nRAISED. I WOULD ENTERTAIN A \nMOTION TO CLOSE THE PUBLIC \nHEARING. \n>>PAT ECKLUND: I’LL MOVE TO \nAPPROVE TO CLOSE — \n>>CHAIR\, ZACHARY WASSERMAN: \nCLOSE THE HEARING. \n>>PAT ECKLUND: PARDON ME. \n>>CHAIR\, ZACHARY WASSERMAN: \nCLOSE THE PUBLIC HEARING. \n>>PAT ECKLUND: RIGHT. I MOVE \nTO CLOSE THE PUBLIC HEARING. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU. AND I HAVE A SECOND \nFROM COMMISSIONER \nMOULTON-PETERS. THANK YOU. IS \nTHERE ANY OPPOSITION TO CLOSING \nTHE PUBLIC HEARING? SEEING \nNONE. IT IS CLOSED. \n>>PAT ECKLUND: SO TO BEGIN THE \nDISCUSSION\, I WOULD LIKE TO MOVE \nSTAFF RECOMMENDATION. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHAT’S WHAT’S COMING UP \nNEXT. \nGO AHEAD\, RON. \n>>PAT ECKLUND: SO\, I MOVED IT. \nIS THERE A SECOND? \n>>CHAIR\, ZACHARY WASSERMAN: \nNO. \nWE NEED TO HAVE IT BEFORE \nYOU GO AHEAD \nROWAN. \n>>ROWAN YELTON: STAFF \nRECOMMENDS APPROVAL OF \nCONDITIONS OF PROPOSED PERMANENT \nAPPLICATION NUMBER 202300200 FOR \nFIVE-YEAR PROGRAM FOR OPERATIONS \nAND MAINTENANCE OF ELECTRICAL \nGAS TRANSMISSION AND \nDISTRIBUTION FACILITIES \nTHROUGHOUT THE BAY AREA \nINCLUDING SPECIAL CONDITIONS \nREQUIRING ACTIVITY PROPOSAL FOR \nSTAFF REVIEW INCLUDING ANNUAL \nREPORTING SPECIES PROTECTION \nINCLUDING RESTORATION TEMPORARY \nDISTURBANCES COMPLIANCE WITH \nAPPROPRIATE ENVIRONMENTAL WORK \nWINDOWS AND COMPLIANCE WITH \nAGENCY PROGRAMMATIC PERMITS AND \nINDIVIDUAL PERMITS CONDITIONS \nREGARDING AVOIDANCE MINIMIZATION \nMITIGATION TEMPORARY IMPACTS TO \nPUBLIC ACCESS. THE STAFF \nBELIEVE THAT THE PROJECT IS \nCONSISTENT WITH THE REQUIREMENTS \nOF THE MCATEER-PETRIS AND THE \nSAN FRANCISCO BAY PLAN. \n>>LARRY GOLDZBAND: MAY I ADD \nSOMETHING ROWAN\, WHICH IS THIS \nRECOMMENDATION IS FOR ITEM \nEIGHT\, NOT ITEM NINE. SIMPLY \nFOR ITEM EIGHT\, WHICH IS — IS \nTHAT CORRECT? \n>>PAT ECKLUND: RIGHT. NUMBER \nNINE IS DIFFERENT. I WOULD LIKE \nTO MOVE THE STAFF RECOMMENDATION \nFOR THIS PERMIT. \n>>CHAIR\, ZACHARY WASSERMAN: IS \nTHERE A SECOND? \nCOMMISSIONER GUNTHER SECONDS. \nAND I ASSUME THE APPLICANT \nACCEPTS THE CONDITIONS. BUT I \nWOULD LIKE TO HEAR AFFIRMATION. \n>>ION WILCOX: WE DO. THANK \nYOU. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU VERY MUCH. \n>>PAT ECKLUND: AND\, ZACK\, I \nWOULD LIKE TO THANK FOR THEIR \nTHOROUGHNESS\, IN DEVELOPING \nTHOSE CONDITIONS\, AS SOMEONE WHO \nWAS IN CHARGE OF THE NPDS \nPERMITTING PROGRAM FOR EPA MANY \nYEARS AGO\, I KNOW WRITING THESE \nPERMITS IS NOT SOMETHING THAT’S \nEASY\, AND I ALSO WANTED TO THANK \nPG&E FOR AGREEING TO NOT ONLY \nMAINTAIN WHAT YOU HAVE GOT BUT \nTRY TO IMPROVE THE CURRENT \nPUBLIC ACCESS AND VISUAL ASPECT \nOF IT\, AS WELL. THIS IS THE \nTIME WHEN WE SHOULD BE DOING \nTHAT. SO I WANTED TO MAKE THOSE \nTWO COMMENTS VERY MUCH. \n>>CHAIR\, ZACHARY WASSERMAN: YOU \nCAN TAKE THE SLIDE DOWN SO THAT \nI CAN SEE THE \nPLEASE? THANK YOU. I WOULD \nASK FOR A MOTION ON THE STAFF \nRECOMMENDATION. \n>>PAT ECKLUND: I MOVED IT. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU. TECHNICALLY WE NEED \nTO MAKE THE MOTION AFTER IT \nCOMES IN. IS THERE A SECOND FOR \nTHE MOTION? COMMISSIONER GORIN \nSECONDS. ALL RIGHT. IF THERE \nIS NO FURTHER COMMENTS\, SIERRA\, \nPLEASE CALL THE ROLL ON THIS \nQUESTION ON ITEM EIGHT. \n>>CLERK OF THE BOARD: \nCOMMISSIONER ADDIEGO? \n>>MARK ADDIEGO: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER AHN? \n>>EDDIE AHN: AYE. \n>>CLERK OF THE BOARD: \nCOMMISSIONER ECKLUND? \n>>PAT ECKLUND: AYE. \n>>CLERK OF THE BOARD: \nCOMMISSIONER GILMORE? \n>>MARIE GILMORE: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER GORIN? \n>>SUSAN GORIN: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER GUNTHER? \n>>ANDREW GUNTHER: YES. \n>>CLERK OF THE BOARD: \nCOMMISSION PER HASZ? \nCOMMISSIONER LESKOVITZ? \n>>SPEAKER: YES. \n>>CLERK OF THE BOARD: \nKISHIMOTO? \n>>YORIKO KISHIMOTO: YES. \n>>CLERK OF THE BOARD: \nMOULTON-PETERS? \n>>STEPHANIE MOULTON-PETERS: \nYES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER NELSON? \n>>BARRY NELSON: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER PEMBERTON? \n>>SHERI PEMBERTON: ABSTAIN. \n>>CLERK OF THE BOARD: \nCOMMISSIONER PINE? \n>>DAVE PINE: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER RANDOLPH? \n>>SPEAKER: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER ZAPATA? CHAIR \nWASSERMAN? \n>>CHAIR\, ZACHARY WASSERMAN: \nYES. \n>>CLERK OF THE BOARD: TOTAL OF \n14 YESES. \n>>CHAIR\, ZACHARY WASSERMAN: THE \nMOTION PASSES. THANK YOU. I \nWOULD NOW ASK \nFOR THE STAFF RECOMMENDATION ON \nITEM NINE. \n>>SPEAKER: THE STAFF RECOMMENDS \nAPPROVAL WITH CONDITIONS OF THE \nPROPOSED PERMIT APPLICATION \nNUMBER 202300300MD FOR THE \nFIVE-YEAR PROGRAM OF OPERATION \nAND MAINTENANCE ELECTRICAL AND \nGAS TRANSMISSION DISTRIBUTION \nFACILITIES THROUGHOUT THE \nPRIMARY MANAGEMENT AREA OF \nSUISUN MARSH THE PERMIT WOULD \nINCLUDE THE SAME SPECIAL \nCONDITIONS AS 2023002. THE \nSTAFF BELIEVES THAT THE PROJECT \nIS CONSISTENT WITH THE \nREQUIREMENTS OF THE \nMCATEER-PETRIS ACT. SAN \nFRANCISCO BAY PLAN\, SUISUN MARSH \nPROTECTION ACT\, AND SUISUN MARSH \nPRESERVATION ACT\, AND THE SUISUN \nMARSH PROTECTION PLAN. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU. \nTHEN WILL YOU TAKE DOWN THE \nSLIDE\, PLEASE? IS THERE A \nMOTION TO APPROVE THE STAFF \nRECOMMENDATION ON ITEM NINE? \nCOMMISSIONER PINE\, I BELIEVE \nYOUR HAND IS US. \n>>PAT ECKLUND: AND I’LL SECOND \nTHE MOTION. \n>>CHAIR\, ZACHARY WASSERMAN: AND \nCOMMISSIONER ECKLUND SECONDS. \nIF THERE ARE NO FURTHER \nCOMMENTS\, SIERRA\, PLEASE CALL \nTHE ROLL. \n>>CLERK OF THE BOARD: \nCOMMISSION ADDIEGO? \n>>MARK ADDIEGO: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER AHN? \n>>EDDIE AHN: YES. \n>>CLERK OF THE BOARD: ECKLUND? \n>>PAT ECKLUND: AYE. \n>>CLERK OF THE BOARD: GILMORE? \n>>MARIE GILMORE: YES. \n>>CLERK OF THE BOARD: GUNTHER? \n>>ANDREW GUNTHER: YES. \n>>CLERK OF THE BOARD: HASZ? \nCOMMISSIONER LESKOVITZ? \n>>SPEAKER: AYE. \n>>CLERK OF THE BOARD: \nCOMMISSIONER KIMBALL? \n>>SPEAKER: YES. \n>>CLERK OF THE BOARD: \nKISHIMOTO? \n>>YORIKO KISHIMOTO: YES. \n>>CLERK OF THE BOARD: MOULTON \nPETERS? \n>>STEPHANIE MOULTON-PETERS: \nYES. \n>>CLERK OF THE BOARD: NELSON? \n>>BARRY NELSON: YES. \n>>CLERK OF THE BOARD: \nPEMBERTON? \n>>SHERI PEMBERTON: ABSTAIN. \n>>CLERK OF THE BOARD: \nCOMMISSIONER. \n>>DAVE PINE: PINE YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER RANDOLPH? \n>>SEAN RANDOLPH: YES. \n>>CLERK OF THE BOARD: ZAPATA? \nWASSERMAN. \n>>CHAIR\, ZACHARY WASSERMAN: \nYES. \n>>CLERK OF THE BOARD: TOTAL OF \n15 YESES ZERO NOS AND ONE \nABSTENTION. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU ALL AS FOR ALL YOUR \nWORK. WE LOOK FORWARD TO THIS \nGOING FORWARD. ITEM TEN PUBLIC \nHEARING AND POSSIBLE VOTE ON \nAPPLICATION FROM REGIS HOMES \nBAY AREA LLC TO REDEVELOP \nAPPROXIMATELY 2.54 ACRE NEW \nRESIDENTIAL PROJECT CONSISTING \nOF 56 FOR SALE TOWNHOUSES AS \nWELL AS SHORELINE PUBLIC ACCESS \nOPEN SPACE AREAS WITHIN THE BAY \nAND 100 FEET OF SHORELINE BAND \nAT 505 EAST BAY SHORELINE ROAD \nREDWOOD CITY\, BCDC SHORELINE \nDEVELOPMENT PERMITS MANAGER WILL \nMAKE THE PRESENTATION AND \nINTRODUCE THE APPLICANT \nSPEAKERS. \n>>LARRY GOLDZBAND: BE RIGHT \nTHERE WE’RE DOING A \nTECHNOLOGICAL FIX. \n>>CLERK OF THE BOARD: WE’RE \nWORKING ON SOME SOUND IN THE \nROOM. GIVE US ONE MINUTE. \n>>SPEAKER: THANK YOU CHAIR \nWASSERMAN. GOOD AFTERNOON \nCOMMISSIONERS I’M KATHARINE PAN \nSHORELINE DEVELOPMENT PROGRAM \nMANAGER AT BEA R BCDC I’LL BE \nPROVIDING A BRIEF SUMMARY OF \nTHIS NEXT APPLICATION NUMBER \n2023005 FOR RESIDENTIAL \nDEVELOPMENT AT 505 EAST BAY \nSHORE ROAD IN REDWOOD CITY SAN \nMATEO COUNTY I’LL INTRODUCE \nREGIS HOMES WHO WILL SHARE THE \nDETAILS. \n>>SPEAKER: THEIR PROJECT WITH \nYOU. SUMMARY FOR THIS PROJECT \nWAS MAILED ON APRIL 5TH\, 2024 \nAND STAFF RECOMMENDATION \nFOLLOWED ON MAY 10TH\, 2024. \nALL RIGHT.   TO ORIENT YOU\, \nTHE PROJECT IS LOCATED IN \nREDWOOD CITY IN SAN MATEO COUNTY \nNEARBY LANDMARKS INCLUDE BEAR \nISLAND ECOLOGICAL RESERVE AND \nSMITH SLEW TO THE NORTH AND PORT \nOF REDWOOD CITY CARGILLS REDWOOD \nCITY SALT PLANT NEAR THE EAST \nBEAR ISLAND ECOLOGICAL RESERVE \nPART OF SAN FRANCISCO BAY PLAN \nDESIGNATED WILDLIFE PRIORITY \nUSED R USE AREA BUT ITSELF IS \nNOT PART OF PRIORITY AREAS. THE \nHALF ACRE SITUATED JUST OFF \nWHIPPLE AVENUE OVERPASS \nOFF-HIGHWAY 101 PREVIOUS USE OF \nTHE SITE WAS FOR METAL RECYCLING \nSUPPLY OPERATION DATING BACK TO \n1963 THERE ARE NO EXISTING BCDC \nPERMITS ON THE SITE. TO THE \nSOUTH IS FORMER TOYOTA 101 \nDEARLISHIP AND EAST 557 EAST \nBAY SHORE ROAD CURRENTLY VACANT \nMOVIE THEATRE COMPLEX IN THE \nPROCESS OF REDEVELOPMENT. THE \nPROJECT FOR THE NEIGHBORING \nDEVELOPMENT WAS APPROVED BY THE \nCOMMISSION IN JUNE OF LAST \nYEAR. \nNOTABLE FEATURES TO THE NORTH OF \nTHE SITE WE FREQUENTLY REFERENCE \nIN THE STAFF RECOMMENDATION \nIMMEDIATELY TO THE NORTH IS A \nTIDALING INFLUENCE DITCH WITH \nMUTED TIDAL MARSH HABITAT PART \nOF THE JURISDICTION’S NORTHED \nOF THAT IS PAVED TRAIL THE LEVY \nTRAIL RECOMMENDATION AND NORTHS \nOF THAT IS WHAT WE REFER TO AS \nTHE UNNAMED SLEW WHICH IS A \nTRANSCRIBETARY OF SMITH SLEW AND \nNORTH OF THAT IS THE BAY AREA \nISLANDS TRAIL SEGMENT THE TIDAL \nDITCH IS CHARACTERIZED AS HAVING \nMUTED TIDESAL MARSH HABITAT \nLIMITED DUE TO SIZE AND \nISOLATION PROVIDING SUITABLE \nHABITAT FOR MARSH HARVEST MOUSE \nAND SHOE\, BEAR \nISLANDS ECOLOGICAL RESERVE \nNORTH ARE BOTH BIOLOGICAL \nHABITAT FOR A VARIETY OF SPECIAL \nSTATUS SPECIES\, IMAGINES OF THE \nSITE TAKEN AT HIGH AND LOW TIDE. \nREGIS HOMES BAY AREA LLC IS \nPROPOSING TO REMEDIATE AND \nREDEVELOP THE PROPERTY AT 505 \nEAST BAY SHORE ROAD WITH \nRESIDENTIAL TOWNHOME PROJECT \nCONSISTING OF 56 TOTAL UNITS \nINCLUDING EIGHT AFFORDABLE UNITS \nAS WELL AS SHORELINE PUBLIC \nACCESS OPEN SPACE AREAS 1.39 \nACRES OF THE PROJECT WOULD BE \nWITHIN THE COMMISSION’S BAY \nSHORELINE BAN JURISDICTION \nINCLUDING THREE TOWNHOME \nBUILDINGS IN A PUBLIC ACCESS \nAREA IN SHORELINE TRAIL. DUE TO \nTHE PRESENCE OF TIDAL MARSH IN A \nDITCH THE BAY SHORELINE IN THIS \nAREA IS CONSIDERED THE UPLAND \nEDGE OF MARSH VEGETATION UP TO \nFIVE FEET ABOVE MEANS SEA LEVEL \nTHE DIAGRAM YOU CAN SEE IT IN \nRED. THE PROJECT WILL INVOLVE \n600 FRIEFR FEET OF NEW BAY FILL \nCAN I HAVING OF SMALL PORTIONS \nOF NEW SHORELINE TRAIL OVERLOOKS \nCAN’T LEVERED OVER THE DITCH \nFROM A RETAINING WALL SITUATED \nIN THE SHORELINE BAND MAYBE HARD \nTO SEE HERE THE PARTS CAN’T \nLEVERING CROSS OVER THE BAY \nJURISDICTION. DEDICATED OPEN \nSPACE TO MAINTAIN A VISUAL \nCONNECTION TO BEAR ISLANDS \nWITHIN THE SHORELINE BAND THE \nSITE WILL INCLUDE SITE \nPREPARATION REMOVING ALL \nEXISTING SITE FEATURES \nREMEDIATING PCB CONTAMINATED \nSOILS RAISING ELEVATIONS \nAPPROXIMATELY 5 TO 7 FEET THE \nPROJECT WILL INCLUDE A FEW 550 \nFOOT RETAINING WALL ALONG THE \nDITCH 3\, 3 STORY RESIDENTIAL \nBUILDINGS WITH 20 TOWNHOME UNITS \nASSOCIATED CIRCULATION AREAS AND \nAPPROXIMATELY 16\,560 FEET OF \nPROJECT PUBLIC ACCESS \nIMPROVEMENTS TAKING PLACE \nOFF-SITE ON PUBLICLY OWNED \nPROPERTY. THE PROJECT WILL \nPROVIDE APPROXIMATELY 18\,800 \nSQUARE FEET OF DEDICATED \nPUBLICLY OWNED PUBLIC ACCESS IN \nAN AREA WHERE PUBLIC ACCESS \nDOESN’T CURRENTLY EXIST THIS \nINCLUDES 14\,250 SQUARE FEET OF \nDEDICATED PUBLIC ACCESS IN THE \nBAY AND SHORELINE BAND AND 180 \nFOOT OF DEDICATED PUBLIC ACCESS \nOUTSIDE OF COMMISSION’S \nJURISDICTION. IMPROVEMENTS IN \nTHE PUBLIC ACCESS AREA WILL \nINCLUDE A TEN FOOT WIDE CONCRETE \nPATH WITH 210 FOOT SHOULDERS ON \nEACH SIDE THAT WILL CONNECT \nROADWAY TO PLAN IMPROVEMENTS AT \n557 EAST BAY SHORE OVERLOOKS \nOBSERVATION DECK DELIVERED OVER \nTHE TIDAL DITCH WITH VIEWS \nTOWARD THE BEAR ISLANDS AND \nPLAZA AT THE TRAIL ENTRANCE\, \nPERMIT IS FIVE FEVEN EAST BAY \nSHORE SITES TIDESAL TO \nFACILITIES ON THE SIDE. IN \nADDITION PROJECT WILL PROVIDE \n4\,550 TOTAL SQUARE FEET OF \nPUBLIC ACCESS\, INCLUDING NEW \nTRAIL PLAZA SIDEWALK CONNECTION \nTO THE BEAR ISLAND TRAIL HEAD \nAND SIDEWALK ALONG THE EAST BAY \nSHORE ROAD LEADING TO FIVE NEW \nPUBLIC SHORE PARKING SPACES IN \nTHE RIGHT OF WAY S CONTAMINATION \nIN THE SOIL AND SEDIMENT ON THE \nSITE IN THE TIDAL DITCH THE \nWATER QUALITY CONTROL BOARD IS \nCONDUCTED THROUGH SEPARATE \nRELATED REMEDIATION PROJECTS \nINCLUDING RENEEDIATION OF THE \nON-SITE AREA SHOWN HERE IN \nPURPLE OR BLUE THIS WORK BASED \nON-SITE CLEAN UP PLAN DEVELOPED \nUNDER OVERSIGHT ASSIST WATER \nBOARD INVOLVING CONSTRUCTION OF \nTHE RETAINING WALL EXCAVATING \nCONTAMINATED SOIL AROUND THE \nPLAN UTILITY LINES AND GRADING \nAND CAPPING CONTAMINATED SOIL \nUNDER GEO TEXTILE AND IMPORTING \nCLEAN SOIL. IN ADDITION ANOTHER \nPROJECT IS BEING PROPOSED BY A \nDIFFERENCE APPLICANT TO \nREMEDIATE THE SITE BANK IN \nYELLOW AND ORANGE SITES IN AREAS \nBELOW THE RETAINING WALL AND \nDITCH MEETING REMEDIATION \nPROJECTS COMPLETED TO THE \nCONSTRUCTION OF ANY HOUSING OR \nPUBLIC ACCESS COMPONENTS THE \nPROJECT SITE BANK AREA WILL \nBECOME DEDICATED OPEN SPACE. \nTHE PROJECT WILL ELEVATE THE \nENTIRE SITE TO 5 TO 7 FEET ABOVE \nEXISTING GRADE FINISHED GRADE OF \n13 FEET AND VD88 EXCEPT FOR THE \nNORTHWEST CORNER PORTION OF THE \nPUBLIC ACCESS ELEVATIONS \nDECREASE TO AROUND 11 FEET TO \nCONFORM WITH EXISTING GRADES IN \nTHE CALTRANS RIGHT OF WAY. \nSTORM TIDAL LEVEL PROJECTS AND \nCONTRACTS WITH PROPOSED GRANT \nAWARDS OVERED TO RISE 12.SKWIEN \nFEET 88 FROM CURRENT LEVELS OF \n10.69 FEET ON HIGH EMISSIONS \nSCENARIO PROVIDED BY THE \nOCEANARY PROTECTION COUNCIL \nUNDER 2018 SEA LEVEL RISE \nGUIDANCE. AT THE PROPOSED \nELEVATIONS MOST PROJECT AND \nPUBLIC ACCESS AREA WILL BE \nRESILIENT TO FLOODING FROM THE \n100 YEAR STORM TIED IN 2050 \nUNDER MEDIUM HIGH RISK HIGH \nEMISSION SCENARIO WITH EXCEPTION \nOF IMPROVEMENTS IN THE NORTHWEST \nPART OF THE SITE. \nHOWEVER THE 100 YEAR STORM TIME \nIS PROJECTED TO REACH 13.6 FEET \nBY 2060 AND 14.5 FEET BY 2070 \nMEANING PUBLIC ACCESS AREAS \nWOULD BE AT RISK OF FLOODING \nBEFORE THE END OF THE CENTURY. \nGROUNDS WATER LEVELS POTENTIAL \nTO COMPROMISE PROJECT STORM \nDRAINS BY 2050 AND PROJECTED TO \nBE AT OUR ABOVE GROUNDS LEVEL BY \n2100. THIS SLIDE SHOWS WHAT \nTHAT WILL LOOK LIKE BASED ON \nCURRENT CONDITIONS NEARLY ALL OF \nTHE SURROUNDING AREA WOULD BE \nFACING IMPACTS BY THIS TIME. \nTHE APPLICANTS CONTEMPLATED \nADAPTATION STRATEGIES DURING THE \nDESIGN PHASE INCLUDING RAISING \nTHE EDGE CHATTY RETAINING WALL \nAND ELEVATES THE MULTI-USE TRAIL \nBUT HAVE NOT COMMITTED TO A \nSINGLE ADAPTATION STRATEGY AT \nTHIS TIME STAFF HAS AGREED TO \nMONITOR THE SITE AND ENGAGE IN \nAN ADAPTATION PLANNING PROCESS \nTHAT WILL BEGIN BY 2050 OR AT \nANY EARLY STAGES OR ANY SIGNS \nMUCH FLOODING TO REASSESS SITE \nCONDITIONS USING BEST AVAILABLE \nSCIENCE AT THE AND DEVELOP AND \nIMPLEMENT APPROPRIATE ADAPTATION \nMEASURES TO AVOID IMPACT ON THE \nPUBLIC ACCESS AREA BECAUSE THE \nPROJECT INVOLVES SALE OF TOWN \nHOMES AND EXPECT PERMIT TO BE \nTAKEN OVER BY HOMEOWNERS \nASSOCIATION REQUIRES NOTICE TO \nBUYERS THAT CLEARLY INDICATES \nRESPONSIBILITIES OF THE \nPERMITTEE TO MAINTAIN AND ADAPT \nPUBLIC ACCESS AREA FOR THE LIFE \nOF THE PROJECT RECOMMENDATION \nFOR CONTENTS OF THAT NOTICE IS \nINCLUDED IN APPENDIX C OF THE \nSTAFF RECOMMENDATION. ACCORDING \nTO THE COMMISSION’S VULNERABLE \nMAPPING TOOL THE PROJECT SITE IS \nLOCATED WITHIN A BLOCK \nIDENTIFIED AS HAVING LOW SOCIAL \nVULNERABILITY GIVEN INDUSTRIAL \nCOMMERCIAL NATURE OF SURROUNDING \nDEVELOPMENT MUCH OF THE AREA \nSHOWS HAVING LOW SOCIAL \nVULNERABILITY ALSO IDENTIFIED IS \nHIGHEST CONTAMINATION VULNERABLE \nWHICH IS ASSOCIATED WITH NEARBY \nHAZARDOUS CLEAN UP ACTIVITIES \nGROUNDS WATER THREATS HAZARDOUS \nWASTE FACILITIES AND SOLID WASTE \nFACILITIES. PROJECT DESIGN \nAPPLICANT CONDUCTED OUTREACH TO \nCOMMUNITY GROUPS TO IDENTIFY \nENVIRONMENTAL SOCIAL EQUITY \nCONCERNS\, DESIRES FOR AFFORDABLE \nHOUSING AND COMMUNITIES IMPROVED \nSHORELINE ACCESS TO TRAIL \nCONNECTIONS AND PARKING ISSUES \nAPPLICANTS PROPOSING TO MAKE \nOFFSITE PUBLIC ACCESS \nIMPROVEMENTS INCLUDING SEGMENTS \nALONG EAST BAY SHORE ROAD AND \nFIVE DESIGNATED PUBLIC SHORE \nPARKING SPACES. THE PROJECT HAS \nBEEN DESIGNED TO INCLUDE EIGHT \nBELOW MARKET RATE UNITS THAT \nWILL BE AFFORDABLE TO HOUSEHOLDS \nMAKING UP TO ONE HUNDREDS 20% OF \nTHE AREA MEDIAN INCOME WHICH IS \nAPPROXIMATELY 21\,000 FOR A \nFAMILY OF FOUR. RELEVANT POLICY \nISSUES RAISED BY PROJECT INCLUDE \nWEATHER PROPOSED PUBLIC ACCESS \nIS MAXIMUM FEASIBLE CONSISTENT \nWITH THE PROJECT OTHERWISE \nCANNOT WITH MCATEER-PETRIS\, BAY \nPLAN IN TERMS OF BAY FILL \nAPPEARANCE AND DESIGN SCENIC \nVIEWS WATER QUALITY MITIGATION \nFISH AND WILDLIFE AND CLIMATE \nCHANGE AND ENVIRONMENTAL JUSTICE \nAND SOCIAL EQUITY. WITH THAT I \nWOULD LIKE TO INTRODUCE KRYSTA \nHEINS VICE PRESIDENT FOR \nDEVELOPMENT AT SEARS REGIS HOMES \nBAY AREA TO PRESENT THE \nPROPOSAL IN GREATER DETAIL \n>>LARRY GOLDZBAND: I WANT TO \nREMIND FOLKS THAT WE ARE CLOSE \nTO A QUORUM. SO\, PLEASE WE NEED \nYOU TO STAY. THANK YOU VERY \nMUCH. \n>>SPEAKER: THANKS \nKATHARINE. \nAPPRECIATE THAT. I’M CHRIS \nDEHAN WITH REGIS HOMES JOINED BY \nJEFF SMITH ALSO WITH REGIS HOMES \nAND OUR DESIGN TEAM. REGIS \nHOMES IS A LOCAL HOME BUILDER \nAND DEVELOPER BASED IN SAN \nMATEO. GREAT. THANK YOU. \nREGIS HOME BUILDER BASED IN SAN \nMATEO WE HAVE BEEN IN BUSINESS \nFOR 30 YEARS WE HAVE A LONG \nTRACK RECORD DELIVERING HOUSING \nTHROUGHOUT THE BAY AREA AND HERE \nIN REDWOOD CITY INCLUDING THE \nTHREE PROJECTS YOU SEE ON THE \nSCREEN BEFORE YOU. WE’RE REALLY \nEXCITED ABOUT THIS PROJECT. \nHERE TO TELL YOU MORE ABOUT OUR \nHOUSING PROPOSAL AT 505 EAST BAY \nSHORE ROAD. I WOULD LIKE TO \nSTART BY THANKING BCDC STAFF WHO \nHELPED US GET HERE TODAY\, \nINCLUDING KATHARINE\, YURIE\, \nJESSICA\, TONY\, ANDREA\, ETHAN\, \nAND SO MANY MORE. IT’S BEEN A \nHUGE TEAM. THANK YOU\, ALL. 505 \nEAST BAY SHORE IS A SMALL BUT \nIMPORTANT HOUSING PROPOSAL \nTHAT’S A BROADER TRANSFORMATION \nOF THE BEAR ISLAND NEIGHBORHOOD \nTHAT STARTED WITH CITIES GENERAL \nPLAN UPDATE BACK IN 2010 THE \nVISION IS MIXED USE WATERFRONT \nNEIGHBORHOOD CONSISTING OF \nHOUSING OF MIXED USES\, \nDEVELOPMENT OF COMMUNITIES LIKE \nBLUE HARBOR VILLE AS MARINA AND \nOF COURSE THE APPROVAL OF 480 \nUNIT PROJECT NEXT DOOR AT 557 \nEAST BAY SHORE WE’RE PART OF \nTHAT TRANSFORMATION. OUR \nPROJECT SITE IS THE GATEWAY TO \nTHAT NEIGHBORHOOD\, YOU GET OFF \nAT WHIPPLE AND COME ON TO \nBAYSHORE ROAD THE SITE IS \nWALKABLE TO DOWNTOWN\, AND \nINCLUDES RESOURCES TO BEAR \nISLANDS AND WILDLIFE REFUGE. \nTHIS IS WHAT IT LOOKS LIKE TODAY \nTHERE ARE NO TREES NO \nAPPEAL\, THE BUILDINGS ARE AGING. \nIT’S LACKING BASIC PUBLIC \nACCESS AND SAFETY MEASURES LIKE \nA SIDEWALK STREET TREES\, \nPARKING\, NOTHING CHATTY KIND. \nSO TODAY WE HAVE OPPORTUNITY TO \nTRANSFORM THIS SITE. NOT ONLY \nCAN WE BUILD NEW HOUSING\, WE CAN \nALSO BEAUTIFY THE ENTRANCE TO \nTHE NEIGHBORHOODS\, WE CAN CREATE \nNEW PUBLIC ACCESS TO THE BAY \nFRONT\, AND ADD MUCH NEEDED \nSAFETY FEATURES TO THE GATEWAY \nSITE. I WANT TO FILL IN A FEW \nGAPS HERE. \nJUST OVER TWO AND A HALF ACRES \nTHIS\, IS A SMALL SITE IN THE \nGRAND SCHEME OF THINGS WE’RE \nEXCITED AT THE OPPORTUNITY TO \nTURN IT INTO 56 NEW HOMES \nINCLUDING THE EIGHT AFFORDABLE \nHOMES THAT KATHARINE MENTIONED. \nLET’S SEE. WE TALKED ABOUT THE \nDITCH AND LEVY TRAILS. SO\, I \nWON’T GO THROUGH THAT. I WANT \nTO MENTION FEATURES OF THE SITE \nDESIGN. WE HAVE BROKEN UP THE \nHOMES INTO NINE BUILDINGS ACROSS \nTHE STATE TO AVOID CREATING TOO \nMUCH MASS. WE HAVE PASEOS \nRUNNING THROUGH THE SITE TO \nENHANCE VIEWS TO CREATE VIEW \nCORRIDORS AND ENHANCE CONNECTION \nTHROUGH TO THE BAY. WE MAXIMIZE \nLANDSCAPING ACROSS THE SITE YOU \nCAN SEE THAT HERE AND INCLUDED A \nMODEST PRIVATE OUTDOOR AMENITY \nSPACE FOR RESIDENTS IN THE LOWER \nRIGHT HAND CORNER BUT TRIED TO \nMAKE MOST OF THIS AS PUBLIC AS \nPOSSIBLE. I’LL SHARE \nARCHITECTURE NEXT. HOMES ARE \nTHREE STORY TALL\, ARCHITECTURE \nIS CONTEMPORARY WITH MIX OF \nMATERIALS PRIVATE OUTDOOR SPACE\, \nTHREE LEVELS\, ABOVE GRADE THAT \nWAS EXCEPTIONAL BECAUSE WE \nWANTED THE PUBLIC SPACE ALONG \nTHE TRAIL TO FEEL PUBLIC SO WE \nELEVATED THE PRIVATE OUTDOOR \nSPACES. HERE IS A VIEW OF THE \nTRAIL WITH THE DITCH IN THE \nFOREGROUND AND THE BAY AND \nWILDLIFE REFUGE IN THE \nBACKGROUND WE’RE PROUD TO OFFER \nA FULL 14 FOOT WIDTH BAY TRAIL \nSECTION HERE THAT CONSISTS OF \nTEN FOOT CENTER WALKWAY WITH TWO \nFOOT SHOULDERS ON EITHER SIDE \nFOR MULTI-MODAL USE\, WE HAVE \nCAN’T LEVERED OVERLOOKS WE CALL \nNODES WITH INFORMATIONAL SIGNAGE \nAND PERFORMINGS TO ENHANCE THE \nPUBLIC ENJOYMENT AND USE OF THE \nTRAIL. WE HAVE PASEOS RUNNING \nTHROUGH AND EMPHASIS AND \nCONNECTION THROUGH THE BAY\, \nPRIVATE OUTDOOR SPACES \nDELINEATED WITH LANDSCAPING AND \nNOT FENCES TRYING TO CREATE AN \nOPEN EXPERIENCE. SO IN ADDITION \nTO HELPING ADDRESS THE HOUSING \nSHORTAGE THIS PROJECT OFFERS A \nNUMBER OF DIFFERENT COMMUNITY \nBENEFITS INCLUDING THE \nAFFORDABLE HOUSING THAT WE \nTALKED BUT I WANT TO POINT OUT \nTHAT’S 15% OF THE OVERALL HOMES \nAT THE MODERATE INCOME LEVEL \nTHAT WAS AN INCREASE FROM OUR \nRIM REQUIREMENT OF 10%. THE NEW \nPUBLIC ACCESS AND OPEN SPACE \nEASEMENTS TOGETHER ARE OVER \n20\,000 SQUARE FEET MORE THAN 18% \nOF OUR SITE AREA NOT INCLUDING \nOFFSITE IMPROVEMENTS I’LL TALK \nABOUT NEXT. WE’RE EXCITED TO \nOFFER SIGNIFICANT BIKE \nPEDESTRIAN IMPROVEMENTS \nADAPTATION FOR SEA LEVEL RISE \nAND MORE THAT I’LL OUTLINE IN \nACKNOWLEDGE SLIDES AND NEW \nDEVELOPMENT WILL BRING \nSIGNIFICANT DEVELOPMENT AND \nINFRASTRUCTURE FEES AND OF \nCOURSE ENHANCED PROPERTY TAX \nREVENUE TO THE CITY TO FURTHER \nSUPPORT IMPROVEMENTS IN THE \nAREA. \nI WANTED TO EMPHASIZE THESE ARE \nFOR SALE HOMES WHICH IS GOING TO \nHELP THE CITY MEET ITS GOAL OF \nINCREASING OWNERSHIP HOUSE STOCK \nAS SOME OF YOU MAY KNOW THERE \nHAS BEEN DEVELOPMENT IN REDWOOD \nCITY LION SHARE OF WHICH IS \nAPARTMENT HOMES THIS IS A BADLY \nNEEDED UNDERSERVED SEGMENT OF \nTHE MARKET THOSE AFFORDABLE \nUNITS WILL ALSO BE OFFERED FOR \nSALE WHICH IS FAIRLY RARE. AT \nTHE MODERATE INCOME LEVEL \nPERFECT FOR FIRST SPONSORED AND \nESSENTIAL MEMBERS OF THE \nCOMMUNITY AT MARKET RATE HOMES \nSIZE AT THIS PRICE POINT TOWN \nHOMES ARE PERFECT FOR FIRST TIME \nHOME BUYERS WHICH ARE\, SORT OF\, \nMOST UNDER SERVED SEGMENT OF THE \nMARKET. I WANT TO FOCUS ON THE \nTRAIL AND HOW WE DESIGNED IT. \nWITH THE GOAL OF MAXIMIZING \nPUBLIC ACCESS WHILE MINIMIZING \nANY POTENTIAL IMPACTS TO THE BAY \nOLDER IN OUR DESIGN PROCESS WE \nENGAGED BROADLY TO COMPLETE A \nBIOLOGICAL STUDY TO LOOK AT THE \nDITCH AND TIDAL VEGETATION IN IT \nAND COMPLETED A JURISDICTIONAL \nDETERMINATION WITH THE ARMY CORP \nBASED ON THAT JURISDICTIONAL \nDETERMINATION WE RECONFIGURED \nOUR SITE PLAN\, UNDERSTANDING \nWHERE THE DITCH AND BAY IS AND \nDESIGN EVERYTHING AROUND THAT \nRATHER THAN PUSHING INTO IT. \nWORKING WITH BCDC STAFF WE ADDED \nA CAN’T LEVER ALONG THE TRAIL TO \nACHIEVE THE FULL 14 FOOT WIDTH \nBAY TRAIL SECTION WHILE AVOIDING \nPHYSICAL IMPACTS INTO THE \nDITCH. \nWE’RE AWARE OF THE RISK SEA \nLEVEL RISE POSES TO THE \nCOMMUNITY AND WE’RE COMMITTED TO \nDOING OUR PART TO PREPARE THE \nCOMMUNITY FOR FUTURE CONDITIONS \nOUR PROJECT INCLUDES A NEW SEA \nWALL ALONG THE DITCH TO HELP US \nBUILD UP THE SITE ENABLING US TO \nADD NEW PUBLIC ACCESS WHILE \nMAINTAINING FEASIBLE UNIT COUNT \nTHE SEA WALL WAS PIVOT ALL TO \nOUR SITE PLAN AND ENABLING US TO \nRAISE THE SITE UP BETWEEN 5 AND \n7 FEET ACROSS THE SITE PROVIDING \nPROTECTION OF 2100 MEDIAN HIGH \nWATER ALIGN AND ADAPTABLE TO 100 \nYEAR FLOOD ELEVATIONS IF NEEDED \nIN THE FUTURE. I WANT TO \nCLARIFY CONTEXT\, BEYOND THE \nDRAINAGE DITCH WE TALKED ABOUT\, \nTHE LEVEE AND SLEW AT BUYER BARE \nISLANDS REFUGE THERE IS AN \nEXISTING BAY TRAIL SEGMENT IN \nGREEN HERE IN BLUE I WANT TO \nPOINT OUT THE OTHER PUBLIC \nACCESS WALK WAYS LIKE THE PG \nLEVEE TRAIL AND WALKWAYS FROM \nOTHER NEW DEVELOPMENTS IN THE \nAREA AND THEN IN YELLOW YOU CAN \nSEE THE NEW TRAIL SEGMENTS FROM \nOUR PROJECT SITE AND 557 EAST \nBAY SHORE ROAD COMBINED HERE. \nSO JUST WANTED TO POINT OUT THAT \nTHEY’RE ADDITIVE TO AN EXISTING \nNETWORK OF PUBLIC ACCESS IN THE \nAREA. SPEAKING OF CONTEXT\, I \nWANTED TO ZOOM IN ON AN EXISTING \nFLAW AND A PRETTY SERIOUS ONE \nABOUT THIS NETWORK OF PUBLIC \nACCESS. THIS IS A VIEW OF THE \nINTERSECTION AT WHIPPLE ROAD AND \nBAYSHORE AT THE FRONT OF OUR \nSITE WHERE THE EXISTING BAY \nTRAIL HEAD IS LOCATED. AS \nTHINGS STAND TODAY YOU CAN SEE \nTHE INTERSECTION IS INCOMPLETE \nAND UNSAFE THERE IS NO SIDEWALK\, \nNO PARKING\, NO SAVE PEDESTRIAN \nACCESS AT ALL TO THE BAY TRAIL\, \nTRAIL HEAD THEN THE CROSSWALK TO \nNOWHERE WHICH DEAD ENDS INTO A \nCHAIN LINK FENCE TODAY IN \nADDITION TO BUILDING MUCH NEEDED \nNEW HOUSING WE HAVE OPPORTUNITY \nTO FIX THIS PROBLEM. OUR \nPROPOSAL INCLUDES ING WHY BEYOND \nOUR PROPERTY LINE WITH \nSIGNIFICANT OFFSITE IMPROVEMENTS \nTO CREATE A SAFER CONNECTION TO \nTHE TRAIL SYSTEM INCLUDING A NEW \nSIDEWALK WITH RAISED LANDSCAPE \nPLANTERS TO PROVIDE ENHANCED \nPEDESTRIAN PROTECTION. THIS \nJURISDICTION CREATES OPPORTUNITY \nFOR A NEW TRAIL HEAD WE’RE \nCALLING IT A PLAZA WITH SEATING \nELEMENTS\, A DRINKING FOUNTAIN\, \nSIGNAGE\, AND A MICRO-MOBILITY \nSTATION OR THE CITY’S BIKESHARE \nAND/OR SCOOTER SHARE PROGRAM AND \nOF COURSE WE GET TO COMPLETE THE \nCROSSWALK TO NOWHERE. \nALL RIGHT. AS MANY OF THE \nCOMMISSIONERS MAY RECALL THE 557 \nEAST BAY SHORE ROAD SITE WAS \nAPPROVED WITH PACKAGE OF PUBLIC \nACCESS AMENITIES HOWEVER THEY’RE \nCOMPLETELY ORPHANED AND \nINACCESSIBLE BY THE PUBLIC \nWITHOUT TRAVERSING THROUGH THE \nSITE FROM BAYSHORE ROAD WE \nPROVIDE A DIRECT CONNECTION FROM \nTHE SITE THROUGH OURS TO THE \nTRAIL HEAD CREATING A CONTINUOUS \nPATHWAY. WE’RE PROUD OF HOW \nSUSTAINABLE THIS PROJECT WILL BE \nTHESE HOMES WILL BE ALL ELECTRIC \nNO NATURAL GAS PLUMBED TO THE \nPROPERTY NO TAIL PIPES TO THESE \nHOMES THEY WILL HAVE SOLAR PV \nPANELS INSTALLED AS WELL AS EV \nCHARGING OUTLET’S PART OF ALL \nELECTRIC CONSTRUCTION INCLUDES \nHEAT PUMP WATER HEATING WHICH \nINCLUDES TECHNOLOGY YOU’RE GOING \nTO HEAR A LOT ABOUT IN THE FIGHT \nAGAINST CLIMATE CHANGE PURPLE \nPLUMBING FOR IRRIGATED RECYCLED \nWATER AND SO MUCH MORE. AS ALL \nOF US IN THIS INDUSTRY KNOW IT \nCAN BE QUITE A JOURNEY TO GET \nNEW HOUSING APPROVED I WON’T GO \nTHROUGH IN DETAIL BUT WANT TO \nMENTION WE’RE REALLY EXCITED TO \nBE HERE TODAY. WE WERE APPROVED \nBY THE CITY ABOUT A YEAR AGO AND \nPRIOR TO THAT WE WENT THROUGH \nFOUR ROUNDS OF DESIGN REVIEW TWO \nWITH THE CITY AND TWO WITH BCDC \nWE COMPLETED A FULL \nENVIRONMENTAL IMPACT REPORT AND \nCONDUCTED EXTENSIVE COMMUNITY \nOUTREACH. AND WE ARE ASKING FOR \nYOUR APPROVAL THIS AFTERNOON. \nSPEAKING OF COMMUNITY OUTREACH\, \nPART OF OUR PROCESS OF REGIS \nHOMES IS TO MEET WITH AS MANY \nSTAKEHOLDERS AS POSSIBLE \nINCLUDING STAKEHOLDERS BUT FOLKS \nIN THE CITY MORE BROADLY AND IN \nTHE BAY AREA. NOT ONLY DO WE \nMEET WITH GROUPS THAT SUPPORT \nHOUSING WE TRY TO MEET WITH AS \nMANY GROUPS AS WE CAN THAT MAY \nSEE THE WORLD DIFFERENTLY THAN \nWE DO THIS IS A LIST OF GROUPS \nWE HAVE MET WITH THROUGH THE \nYEARS IMPORTANTLY MENTION \nSUPPORT OF THE BEAR ISLAND \nNEIGHBORHOOD\, BOOSTER\, AND WE \nSAT DOWN WITH CITIZENS COMMITTEE \nTO COMPLETE THE REFUGE AND \nSIERRA CLUB TO HEAR ABOUT THEIR \nCONCERNS WE MADE A FEW CHANGES \nIN \nRESPONSE. AND WITH THAT WE’RE \nPROUD TO HAVE THE ENDORSEMENT OF \nTHESE FINE GROUPS HERE AND THANK \nYOU FOR YOUR TIME THIS AFTERNOON \nI’LL \n>>CHAIR\, ZACHARY WASSERMAN: \nI’LL OPEN THE PUBLIC HEARING. \nDO WE HAVE PUBLIC SPEAKERS? \n>>CLERK OF THE BOARD: YES\, \nCHAIR WASSERMAN. \n>>CHAIR\, ZACHARY WASSERMAN: HOW \nMANY? \n>>CLERK OF THE BOARD: CURRENTLY \nTHREE HANDS RAISED VIRTUALLY\, \nAND NONE IN-PERSON. \n>>CHAIR\, ZACHARY WASSERMAN: \nLET’S CALL THEM. \n>>CLERK OF THE BOARD: LUIS — \nPARDON ME FOR YOUR LAST NAME\, \nMIRANTE\, YOU’RE UP FIRST\, \nFOLLOWED BY GITA \nD. LUIS? \n>>SPEAKER: CAN YOU HEAR ME. \n>>CLERK OF THE BOARD: YES. \n>>CHAIR\, ZACHARY WASSERMAN: \nYES. \n>>SPEAKER: HELLO MR. CHAIR\, \nMEMBERS\, MY NAME IS \nLUISMIRANTE YOU NAILED MY LAST \nNAME LIKE AN OLYMPIC GYM \nAND-A-HALF CONGRATULATIONS THANK \nYOU I’M HERE TODAY PROUD TO \nSUPPORT THIS PROJECT \nON BEHALF OF THE BAY AREA \nCOUNCIL ALL WITH THE GOAL OF \nMAKING THE BAY AREA THE BEST \nPLACE IN THE COUNTRY TO LIVE AND \nWORK. THE HOUSING CRISIS THE \nBAY AREA FACES IS AS YOU KNOW \nOBVIOUSLY ONE OF THE MOST \nIMMENSE CHALLENGES THAT OUR \nEMPLOYERS AND OUR RESIDENTS IN \nTHIS REGION FACE TODAY SO WE’RE \nPROUD TODAY TO BE A PART OF \nHELPING SUPPORT THIS PROJECT \nWHICH IS A SMALL BUT MIGHT \nCONTRIBUTION TO REDUCE YOU THE \nINTENSITY OF THAT CRISIS. OUR \nPROJECT ENDORSEMENT COMMITTEE \nREVIEWED THIS PROJECT AND \nUNANIMOUSLY VOTED TO SUPPORT IT \nIN PART BECAUSE THE PROJECT \nALIGNS WITH OUR GOALS OF \nEXPANDING AFFORDABLE \nHOMEOWNERSHIP OPTIONS IN A JOB \nMARKET THAT SO CLEARLY NEEDS \nTHEM AND BECAUSE THE PUBLIC \nBENEFITS AND RESILIENCY EFFORTS \nTHAT THE PROJECT UNDERTOOK GO \nABOVE AND BEYOND IN OUR OPINION \nIN TERMS OF CONTRIBUTING VALUE \nTO THE PUBLIC. SO\, WHEN LOOKING \nAT THIS PROJECT\, I HOPE THAT YOU \nSEE IT’S NOT JUST A HOUSING \nPROJECT BUT ALSO ONE THAT \nIMPROVES THE REGION’S RESILIENCY \nHOWEVER SLIGHTLY\, AND IS PART OF \nA BIGGER PICTURE THAT WE NEED TO \nMEET TO GET TO OUR CLIMATE GOALS \nAND TO MAKE SURE THAT OUR REGION \nCAN ADAPT TO AND BE RESILIENT TO \nCLIMATE CHANGE W THAT I’M HAPPY \nTO ANSWER QUESTIONS YOU HAVE \nABOUT OUR SUPPORT LETTER WHICH \nWAS TRANSMITTED TO YOU YESTERDAY \nAND OTHERWISE URGE YOUR SUPPORT \nFOR THIS STERLING PROJECT. \nTHANK YOU. \n>>CLERK OF THE BOARD: THANK \nYOU. GITA \nDEV. YOU ARE NEXT. \n>>SPEAKER: CAN YOU HEAR ME. \n>>CLERK OF THE BOARD: YES WE \nCAN. \n>>SPEAKER: YOU CAN GO TO SLIDE \nNUMBER 14 AND THEN WE COULD \nSTART THE CLOCK? \n>>CLERK OF THE BOARD: \nKATHARINE\, CAN YOU SHARE SLIDE \n14? THANK YOU. WHICH \nPRESENTATION WAS IT? OUR STAFF \nPRESENTATION OR THE APPLICANT’S \nPRESENTATION? \n>>SPEAKER: I BELIEVE IT WAS THE \nAPPLICANT’S PRESENTATION\, THE \nLAST ONE. \n>>CLERK OF THE BOARD: ONE \nMINUTE. \n>>SPEAKER: 14 OR 17. EITHER \nONE WILL DO. \n>>CLERK OF THE BOARD: IS THIS \nTHE CORRECT SLIDE? \n>>SPEAKER: IT ACTUALLY SHOWED A \nSITE PLAN. MAYBE TRY 17. \nJUST THE PREVIOUS ONE. JUST GO \nBACK TWO. ONE MORE. \nYEAH. I THINK THIS WILL BE \nFINE. THIS WILL BE FINE. THANK \nYOU SO MUCH. \n>>CLERK OF THE BOARD: YOUR TIME \nIS NOW RUNNING. \n>>SPEAKER: THANK YOU. I’M GITA \nDEFINITELY\, I’M WITH THE SIERRA \nCLUB ALIVE CAMPAIGN. I \nAM APPRECIATIVE THAT REGIS \nHOMES PROJECTS\, HOWEVER I WANT \nTO MAKE IT CLEAR THAT SIERRA \nCLUB DID NOT MEET WITH REGIS \nHOMES ON THIS PROJECT THEY DID \nREACH OUT AND WE DECLINED ALSO I \nWOULD LIKE TO NOTE THAT \nCITIZEN’S COMMITTEE TO COMPLETE \nTHE REFUGE IS ADAMANTLY OPPOSED \nTO THIS PROJECT THERE WERE ALSO \nCOMMUNITY BENEFITS BUT SOME OF \nTHOSE ARE NOT BENEFITS SOME OF \nTHOSE ARE REQUIRED FEES. SO\, \nGIVEN THAT\, WHAT I WOULD LIKE TO \nPOINT OUT IS FOR\, I ASSUME THAT \nALL YOU COMMISSIONERS REALIZE \nTHAT THE FRONT ROW OF TOWN HOMES \nTHAT ARE SHOWN IN THIS SITE PLAN \nARE ALL WITHIN THE BCDC 100 FOOT \nSET BACK BAND. AND WITH GIVEN \nSEA LEVEL RISE\, YOU CAN SEE THAT \nWE REALLY NEED THAT 100 FEET. \nYOU CAN SEE THAT THE PROJECT \nNEXT TO IT IS RESPECTING THAT \n100 FOOT SET BACK WITH ITS \nHOMES. I WOULD ALSO POINT OUT \nTHAT THIS SEGMENT OF WHAT \nTHEY’RE CALLING THE BAY TRAIL IS \nREALLY AN ISOLATED SEGMENT THAT \nIS REALLY FOR THE ENJOYMENT \nENJOIMENT OF THE PEOPLE WHO \nLIVE IN THESE HOMES BECAUSE \nTHERE IS NO CONNECTION BACK TO \nTHE BLUE LINE WHICH IS USED AS A \nPUBLIC TRAIL\, AND I AM VERY \nFAMILIAR WITH IT. I DO ACCEPT \nALL OF THE POINTS ABOUT HOW \nDIFFICULT THE CONNECTION IS TO \nBEAR ISLAND\, AT THE WILL LOW\, AT \nTHE WHIPPLE ROAD. HOWEVER\, I \nREALLY THINK THIS WOULD BE THE \nWRONG TIME TO ENCROACH TO ALLOW \nENCROACHMENTS INTO THIS 100 FOOT \nSET BACK BAND. ONE SHORELINE\, \nAS YOU ALL KNOW\, CAME BEFORE US \nAND SAID THAT IT IS THEIR POLICY \nTO TRY TO MAINTAIN A 100 FOOT \nSET BACK IN ORDER TO ALLOW FOR \nTHE BAY TO STAY ALIVE. TO NOT \nHAVE SEA WALLS RIGHT UP AGAINST \nTHE BAY. \nAND YOU CAN TELL IF YOU HAD \nANYTHING TO DO WITH \nCONSTRUCTION\, THAT DOING \nCONSTRUCTION INTO THE BAY\, INTO \nTHAT SLOUGH\, INTO THAT DITCH \nWHICH HAS ENDANGERED SPECIES \nYOU’RE GOING TO HAVE TO CLOSE \nOFF THAT DITCH IN ORDER TO BE \nABLE TO DRAIN IN ORDER TO BE \nABLE TO PULL THAT STUFF \nUNDERGROUND. I WOULD SAY ONE \nTHING\, AFFORDABLE HOUSING\, THIS \nIS NOT THE PLACE TO PUT \nHOMEOWNER AFFORDABLE HOUSING\, \nTHEY’RE GOING TO GET HIT UP WITH \nA LOT OF COSTS WHEN THE SEA \nLEVELS IN 2050. THE STORM \nDRAINS ARE GOING TO HAVE TO BE \nREDONE THIS IS NOT THE PLACE TO \nLOCATE HOUSING AND PARTICULARLY \nAFFORDABLE HOUSING. \n>>CLERK OF THE BOARD: THANK YOU \nFOR YOUR PUBLIC COMMENT YOUR \nTIME HAS NOW FINISHED. \n>>SPEAKER: THANK YOU. \n>>CLERK OF THE BOARD: MOVING ON \nTO KEVIN CHAN. YOU MAY NOW \nUNMUTE. \n>>SPEAKER: GOOD AFTERNOON \nMEMBERS OF THE SAN FRANCISCO BAY \nCONSERVATION AND DEVELOPMENT \nCOMMISSION MY NAME IS KEN CHAN \nAND I AM THE SENIOR ORGANIZER \nWITHIN THE HOUSING LEADERSHIP \nCOUNCIL SAN MATEO COUNTY WE WORK \nWITH COMMITTEES AND THEIR \nLEADERS TO PRODUCE AND RESERVE \nQUALITY AFFORDABLE HOMES \nAPPRECIATION TO STAFF FOR THE \nHARD WORK ON TODAY’S \nPRESENTATION\, ON BEHALF OF HCL \nOUR LETTER I WOULD LIKE TO \nEXPRESS OUR SUPPORT FOR 505 \nBAYSHORE TOWNHOME PROJECT REGIS \nHOMES BAY AREA AS YOU MAY \nALREADY KNOW CREATING OWNERSHIP \nOF AFFORDABLE HOMES IN OUR STATE \nIS DIFFICULT BECAUSE OF LACK OF \nAVAILABLE FUNDING. THIS IS WHY \nWE SUPPORT THE EIGHT AFFORDABLE\, \nTWO BEDROOM AND 4 TO 8 MARKET \nRATE HOMES THAT THE CITY \nDISPARATELY NEED\, FAMILIES WILL \nGET STABILITY THEY NEED TO \nTHRIVE IN THEIR COMMUNITIES \nWHERE THEY WILL NO LONGER WORRY \nABOUT QUALITY OF AFFORDABLE \nHOMES AND ALSO BE ABLE TO LIVE \nNEAR THEIR PLACES OF WORK \nREDUCES STRESS ON THE BAY AREA \nINFRASTRUCTURE AND DECREASE BOTH \nTHEIRS AND YOUR TIME ON THE ROAD \nLEAVING TIME FOR HEALTH FAMILY \nAND COMMUNITY. THANK YOU FOR \nYOUR CONTINUED LEADERSHIP AND WE \nURGE YOU TO APPROVE THE 505 \nEAST BAY SHORE TOWNHOME \nPROPOSAL. \nTHANK YOU SO MUCH. \n>>CLERK OF THE BOARD: THANK \nYOU. CHAIR WASSERMAN THERE IS \nNO MORE PUBLIC COMMENT. \n>>SPEAKER: I WOULD ENTERTAIN A \nMOTION TO CLOSE THE PUBLIC \nHEARING. \n>>PAT ECKLUND: I’LL MOVE TO \nCLOSE THE PUBLIC HEARING. \n>>CHAIR\, ZACHARY WASSERMAN: \nCOMMISSIONER ECKLUND MOVES. AND \nCOMMISSIONER NELSON SECONDS. \nTHERE IS NO OBJECTION. THE \nPUBLIC HEARING IS CLOSED. \nCOMMISSIONER QUESTIONS AND \nCOMMENTS? \n>>PAT ECKLUND: — UH — \n>>CHAIR\, ZACHARY WASSERMAN: \nCOMMISSIONER KISHIMOTO? \n>>YORIKO KISHIMOTO: YES\, THANK \nYOU. LET’S SEE. I WAS GOING TO \nASK IF EITHER STAFF OR THE \nAPPLICANT WOULD LIKE TO COMMENT \nON THAT — THE COMMENT ABOUT THE \n100 FOOT SET BACK AND — JUST \nGIVE US A LITTLE BIT MORE \nCONTEXT ABOUT THAT? \n>>SPEAKER: HAPPY TO. I HOPE \nCAN YOU HEAR ME. KATHARINE\, I \nACTUALLY THOUGHT THAT SLIDE 14 \nWAS REALLY HELPFUL FOR THIS \nSUBJECT. I’M HAPPY TO COMMENT \nON THAT. THE SHORT ANSWER IS \nTHIS IS A SMALL SITE PUTTING A \n100 FOOT SET BACK WOULD MAKE \nTHIS UNDEVELOPABLE THAT’S WHY \nWE’RE TRYING TO MAXIMIZE AMOUNT \nOF PUBLIC ACCESS THAT WE CAN \nOFFER TO THE SITE UNDERSTANDING \nWE CAN’T GET TO THE FULL 100 \nFEET ALSO MENTION TO LOOK AT THE \nOTHER DEVELOPMENTS IN THE AREA \nIF WE CAN GET THE SLIDE UP HERE \nIF YOU LOOK AT THE VILLAS\, BLUE \nHARBOR\, MARIN A NONE HAVE 100 \nFOOT SET BACK SOME HAVE A \nSIMILAR SEA WALL WITH SMALLER \nSIDEWALK. OUR TRAIL SECTION IS \n14 FEET PLUS LANDSCAPING SETI \nWENT OUT TO BLUE HARBOR VILLE AS \nAND MEASURED EIGHT FOOT AND TEN \nFOOT SIDEWALKS SO THIS IS A HUGE \nINCREASE COMPARED TO THE LARGER \nSITES. I HOPE THAT’S HELPFUL. \nTHE 557 EAST BAY SHORE SITE NEXT \nTO US IS LARGER IT HAS 480 \nUNITS APARTMENT COMPLEX A \nDEVELOPMENT THAT’S LARGE THEY’RE \nCAN SUPPORT MORE PUBLIC BENEFITS \nLIKE THIS. \nGREAT. THANK YOU. IF YOU LOOK \nTO THE TOP RIGHT HERE YOU CAN \nSEE THE DEVELOPMENTS I’M TALKING \nABOUT AND IF YOU SQUINT\, ONE \nPARTICULAR MARINA VERY LIMITED \nSET BACK OURS IS MUCH LARGER AND \nWE’RE PROUD OF THAT. \n>>SPEAKER: AND I ALSO WANT TO \nJUST CLARIFY\, SO\, BCDC’S \nJURISDICTION IS THE 100 FOOT \nSHORELINE BAND THAT JUST MEANS \nTHAT WE HAVE PERMITTING \nAUTHORITY WITHIN THAT AREA. \nIT’S NOT A SET BACK. IT \nDOESN’T\, SORT OF\, PRECLUDE THIS \nTYPE OF DEVELOPMENT IN IT. SO\, \nI WANT TO CLARIFY THE DIFFERENCE \nBETWEEN OUR PERMITTING \nJURISDICTION AND THE CONCEPT OF \nA SET BACK. I DON’T KNOW IF YOU \nHAVE ANYTHING ELSE TO ADD. \n>>SPEAKER: YES\, WELL\, THAT’S \nHELPFUL. BUT\, SO\, ARE THE ONE \nSHORELINE AND THE OTHER POLICIES \nWE HAVE. SO THEY RECOMMEND  . \n>>YORIKO KISHIMOTO: UP TO\, YOU \nKNOW\, THE 100 FOOT SET BACK OR \nMAXIMUM SET BACK\, BUT THEY LEAVE \nIT UP TO BCDC DISCRETION\, IS \nTHAT RIGHT? \n>>CHAIR\, ZACHARY WASSERMAN: I \n— CAN WE GET CLARIFICATION \nEITHER FROM KATHARINE OR FROM \nLEGAL ON WHAT OUR JURISDICTIONAL \nAUTHORITY IS WITHIN THE 100 \nSHORELINE BAND? \n>>YORIKO KISHIMOTO: AND POLICY \nRECOMMENDATIONS\, YEAH. \n>>SPEAKER: SO\, WE DON’T HAVE \nANY POLICY RECOMMENDATIONS ABOUT \nNOT BUILDING WITHIN THE 100 FOOT \nBAND. OUR AUTHORITY\, BASICALLY\, \nUNDER — SORRY. IT’S HARD UNDER \n— UNDER 66632.4 \nIS BASICALLY PUBLIC ACCESS. IT \nSAYS BASICALLY THE COMMISSION \nMAY DENY AN APPLICATION FOR A \nPERMIT OR FOR A PROPOSED PROJECT \nONLY ON THE GROUNDS THAT THE \nPROJECT FAILS TO PROVIDE MAXIMUM \nFEASIBLE PUBLIC ACCESS WITHIN \nTHAT SHORELINE BAND. IN FACT\, \nOUR REGULATIONS ENVISION THAT WE \nWILL BUILD WITHIN THAT SHORELINE \nBAND. THAT’S PRETTY CLEAR. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU. GO AHEAD\, \nCOMMISSIONER KISHIMOTO. . \n>>YORIKO KISHIMOTO: OKAY. LET \nME THINK ABOUT THAT. AND I \nGUESS THE ONLY OTHER QUESTION I \nHAVE IS LIGHTING\, I GUESS THERE \nIS NO LIGHTING\, PLAN FOR THAT \nWALKWAY OR ADDING LIGHTING TO \nTHAT AREA? \n>>SPEAKER: OF COURSE\, YEAH\, \nTHERE IS LOW BALLARD LIGHTING\, \nALL ALONG\, WE HAVE CONDITIONS \nAPPROVAL FROM THE CITY RELATED \nTO DARK SKY ORDINANCE BUT THE \nPATHWAY WILL BE LIT. I THINK \nTHAT’S YOUR QUESTION. \n>>YORIKO KISHIMOTO: YEAH. \nOKAY. WELL\, I’M SURPRISED\, I \nWOULD THINK THAT WE WOULD WANT \nTO MINIMIZE LIGHTING\, BECAUSE OF \nWILDLIFE ISSUES. BUT THAT’S NOT \nWITHIN OUR SET OF \nRECOMMENDATIONS OR GUIDELINES \nEITHER? \n>>SPEAKER: SO WE DIDN’T INCLUDE \nWITHIN THE STAFF RECOMMENDATION \nANY CONDITIONS RELATED TO \nLIGHTING. I MIGHT. \n>>KATHARINE PAN: I DON’T KNOW \nIF OUR BAY DEVELOPMENT ANALYST \nHAVE ANY COMMENTS ON THIS BUT \nWITH LIGHTING\, I KNOW ESPECIALLY \nWITH PUBLIC ACCESS AS IT GETS \nLATER INTO THE EVENING THAT \nTHERE IS ALSO A SAFETY CONCERN \nRELATED TO LIGHTING\, SO I DON’T \nKNOW IF WITHIN THE EIR\, THAT \nTHERE WAS ANY SPECIFICATION TO \nLIKE THE INTENSITY OF THE \nLIGHTING THAT WAS ALLOWED. BUT \nI’LL LET THE APPLICANT SPEAK TO \nTHAT. \n>>SPEAKER: NOT THAT I RECALL \nAND I’LL ADD I THINK LIGHTING \nFOR WALKWAYS MIGHT BE A BUILDING \nCODE ISSUE I’M NOT SURE\, SO I’M \nNOT SURE YOU CAN’T LIGHT A \nPATHWAY IN THIS SITUATION BUT WE \nALSO HAVE LOW LIGHTING TO TRY TO \nMITIGATE T I HOPE THAT’S \nHELPFUL. \n>>YORIKO KISHIMOTO: WELL\, LOW \nLIGHTING IS BETTER THAN TOO MUCH \nLIGHTING. BUT\, YES\, I — I \nMEAN\, I WOULDN’T — I WOULD HOPE \nTHAT BCDC LOOKS AT THAT LIGHTING \nISSUE. BECAUSE I WOULD IMAGINE \nTHAT IT WOULD HAVE SOME IMPACT \nON THE HABITAT AND WILDLIFE. \nSO\, THAT’S — I GUESS THAT’S THE \nCOMMENT I’LL MAKE AT THIS \nPOINT. \nTHANK YOU VERY MUCH. AND I DO \nAPPRECIATE ALL THE OTHER \nSUSTAINABILITY FEATURES AND \nSUCH\, BUT THERE’S — BUT IT IS \nAT A SENSITIVE LOCATION. SO\, I \nAPPRECIATE THAT. THANK YOU. \n>>CHAIR\, ZACHARY WASSERMAN: \nCOMMISSIONER ZAPEDA. \n>>CESAR ZEPEDA: THANK YOU \nCHAIR. WOULD STAFF BE ABLE TO \nPUT UP THE SLIDE AGAIN? ONE OF \nTHOSE INFAMOUS SLIDES THAT HAS \nBEEN PRESENTED. PAGE 14 OR 12 I \nDON’T REMEMBER WHICH ONE IT IS \nTHE ONE THIS’S LOOKING AT THE \nNEXT DOOR PROPERTY\, THAT’S \nALREADY BEEN APPROVED. I HAVE A \nQUESTION ON THIS ONE. THANK \nYOU. JUST\, HISTORY\, AND FOR ME \nTO LEARN MORE ABOUT THE — TO BE \nCONSISTENT IN OUR RESPONSES WITH \nANY PROPERTY. SO\, THE PROPERTY \nRIGHT NEXT DOOR\, I SEE THE 100 \nFOOT LINE\, AND I’M IMAGINING \nTHE LINE THERE BASED ON ONE OF \nTHE OTHER SLIDES THAT DREW THE \nLINE IN THERE ON THE YELLOW \nSQUARE. \nSO THE PROPERTY NEXT DOOR THAT \nWAS ALREADY APPROVED BY BCDC I’M \nASSUMING\, IN PRIOR MONTHS OR \nYEARS\, I’M NOT SURE WHEN IT WAS \nPROVED\, BUT IF STAFF IS ABLE TO \nTELL US — HOW THEY  THE \nDECISION FOR HAVING THAT GREEN \nAREA BE GREATER THAN WHAT WE’RE \nREQUESTING THIS PROJECT? AND IF \nTHERE IS A RHYME OR REASON WHY \nONE WOULD HAVE IT BUT THE OTHER \nWOULD NOT OTHER THAN THE SPACE \nIS SMALLER AND EVERYTHING IS \nNEEDED TO BUILD MORE HOUSING? \n>>SPEAKER: SO\, FOR THE 557 EAST \nBAY SHORE PROJECT THAT WAS \nAPPROVED BY THE COMMISSION ABOUT \nTHIS TIME LAST YEAR\, IT REALLY \nDOES\, SORT OF\, COME DOWN \nPROBABLY TO SIZE. YOU KNOW\, THE \nQUESTION FOR US — OR THE \nQUESTION BEFORE THE COMMISSION \nIS THIS MAXIMUM FEASIBLE PUBLIC \nACCESS CONSISTENT WITH THE \nPROJECT AND SO FOR THAT PROJECT \nIT’S\, AS YOU CAN SEE IT’S \nSIGNIFICANTLY LARGER. WE PUSHED \n— OR WE WORKED WITH THEM TO \nENSURE THAT AS MUCH OF THAT \nSHORELINE BAND BE DEDICATED \nPUBLIC ACCESS AS POSSIBLE. IT \nWAS SOMETHING THEY WERE ABLE TO \nACCOMMODATE BASED ON THEIR \nPROJECT. FOR THIS ONE — AND \nYOU CAN SEE PRETTY MUCH\, LIKE\, \nWHERE THAT GREEN SPACE ENDS. \nPART OF THEIR APARTMENT BUILDING \nDOES CROSS OVER INTO THE SHORE \nLINER BAND\, BUT THAT PRETTY MUCH \nCORRESPONDS TO THE SHORELINE \nBAND. SO IF YOU CONTINUE ACROSS \nON TO THIS SITE YOU CAN SEE THAT \nPRETTY MUCH CUTS THIS SITE IN \nAND A HALF. AND SO\, I THINK\, IN \nTERMS OF FEASIBILITY\, THAT’S \nMORE FOR THE PROJECT PROPONENT \nTO SPEAK TO THE DETAILS OF \nTHAT. \nBUT YOU KNOW\, THE QUESTION IS\, \nLIKE\, FOR A PROJECT TO MOVE \nFORWARD\, WHAT IS THE MAXIMUM \nFEASIBLE PUBLIC ACCESS THAT \nTHEY’RE ABLE TO PROVIDE\, AND IN \nTHIS CASE\, YOU KNOW\, WE DID DO A \nCOMPARISON WITH SOME OTHER \nPROJECTS WITHIN THE STAFF \nRECOMMENDATION AND IT — IT’S IN \nTHE BALLPARK OF PERCENTAGES OF \nTHE SITE\, BUT OF COURSE THAT IS \nTHE QUESTION BEFORE THE \nCOMMISSION. \n>>CESAR ZEPEDA: DO WE HAVE A \nMINIMUM AMOUNT? I KNOW WE HAVE \n100 FEET BCDC JURISDICTION BUT \nDO WE HAVE A MINIMUM AMOUNT THAT \nHAS TO BE GIVEN TO PUBLIC \nACCESS? BECAUSE HERE\, THE 100 \nLINE\, THERE IS ANOTHER ONE\, I \nTHINK IT WAS THE SECOND TO LAST \nLINE THAT HAS THE BCDC \nJURISDICTION LINE WHICH IS RIGHT \nWHERE — I BELIEVE IS RIGHT \nWHERE THE HOMES\, I THINK THIS IS \nTHE PURPLE LINE IS THE BCDC \nDINE? SO\, IT’S PRETTY — LIKE \nYOU WERE SAYING IT’S PRETTY MUCH \nHALF OF THE PROPERTY. SO\, FOR \nCONSISTENCY PURPOSES\, AND I’M \nSURE THIS WON’T BE THE ONLY \nPROPERTY THAT WE’RE GOING TO BE \nREVIEWING IN THE NEXT COUPLE OF \nYEARS\, BECAUSE WE NEED MORE \nHOUSING\, WHAT IS THE MINIMUM \nREQUIREMENT WITHIN THE 100 \nFEET? \nAND IS IT BASED ON WHAT THEY’RE \nTELLING US THAT THEY CAN GIVE \nUS? OR BASED ON A NUMBER THAT \nWE HAVE THAT SAYS\, IN OUR 100 \nFEET\, WE MUST HAVE A MINIMUM OF \nX? \n>>SPEAKER: WE DO NOT HAVE A \nMINIMUM AMOUNT\, WHETHER THAT’S \nIN TOTAL ACREAGE OR SQUARE \nFOOTAGE OR PERCENTAGE OF A SITE \nTHAT’S REQUIRED BY A LAW OR \nPOLICY TO BE DEDICATED OR \nIMPROVED AS PUBLIC ACCESS. IN \nTHE STAFF REPORT\, YOU KNOW\, THIS \nIS ONE OF THE REASONS WHY WE \nTAKE SUCH GREAT PAINS WITH THAT \nSECTION OF FINDINGS\, TO GO \nTHROUGH WITH COMPARISONS WITH \nPAST COMMISSION DECISIONS AND \nTHEN LOOKING AT OF COURSE THE \nWAY THAT THAT PUBLIC ACCESS AREA \nIS ACTUALLY PRESENTED AND \nIMPROVED\, LIKE HOW USEABLE IS T \nWHAT ACTUAL BENEFITS IS IT \nPROVIDING WHAT’S CONNECTSTIVITY\, \nHOW ACCESSIBLE IS IT\, ALL OF \nTHOSE ASPECTS ARE\, SORT OF\, \nDETAILED IN OUR POLICY. YOU \nKNOW\, WE DO WANT PUBLIC ACCESS \nTO BE USABLE WE WANT IT TO BE \nACCESSIBLE\, WE WANT IT TO SERVE\, \nLIKE\, YOU KNOW\, A WIDE RANGE OF \nPOPULATIONS\, ET CETERA. SO \nTHOSE ARE THE SORTS OF THINGS \nTHAT WE LOOK AT OR THAT WE \nLOOKED AT IN THE STAFF \nRECOMMENDATION. BUT AS FOR THE \nACTUAL AMOUNT\, THAT’S ONE OF THE \nTHINGS THAT THE POLICIES AND \nLAWS DON’T PROVIDE. THAT’S — \nTHAT IS\, LIKE\, THE DISCRETIONARY \nPART OF THIS APPROVAL. \n>>CESAR ZEPEDA: THANK YOU. AND \nDO WE HAPPEN TO KNOW\, OUT OF ALL \nTHE OTHER PROJECTS THAT WE HAVE \nAPPROVED IN THE PAST\, WHICH ONE \nIS THE ONE THAT HAS THE LEAST \nAMOUNT OF PUBLIC ACCESS? THIS \nONE HAS A 14 FOOT TRAIL. DO WE \nKNOW IF WE HAVE ANY WITH LESS? \nJUST TRYING TO FIGURE OUT \nBECAUSE WITH EVERY VOTE WE SET \nNEW PRECEDENCE AND I WANT TO \nKNOW HOW WE’RE SETTING IT. \n>>SPEAKER: SO\, WITHOUT TAKING \nTHE SLIDE DOWN AND\, SORT OF\, \nOPENING UP THE STAFF RACK\, I \nCOULDN’T TELL YOU SPECIFICALLY\, \nBUT I — WHAT CHRIS WAS SAYING \nABOUT THE BLUE HARBOR \nDEVELOPMENT\, FOR EXAMPLE\, YOU \nKNOW\, THAT TRAIL IS SMALLER. \nINITIALLY\, I THINK THIS PROJECT \nCAME IN WITH A SIMILARLY\, SORT \nOF\, NARROW TRAIL AREA THAT ENDED \nUP BECOMING EXPANDED AS WE \nTALKED THROUGH THE PROCESS WITH \nTHEM. OR AS THEY MADE THEIR WAY \nTHROUGH THE PROCESS. SO\, THERE \nARE\, CERTAINLY\, PROJECTS WITHIN \nTHE COMMISSION’S JURISDICTION \nWITH LESS PUBLIC ACCESS \n[LAUGHTER] \nBUT I WOULDN’T BE ABLE TO \nIMMEDIATELY POINT THOSE OUT TO \nYOU\, AND I WOULDN’T NECESSARILY \n— YOU KNOW\, EVERY PROJECT \nSHOULD BE KIND OF CONSIDERED ON \nITS OWN MERIT\, AND SO THAT’S\, \nSORT OF\, THE OTHER REASON WHY \nTHE COMPARISON IS DIFFICULT. \nBECAUSE YOU DO JUST — JUST \nBECAUSE ANOTHER PROJECT HAS LESS \nDOESN’T NECESSARILY MEAN THAT \nTHIS IS BETTER. IT IS LIKE\, A \nPROJECT BY PROJECT BASIS. KIND \nOF ENCOURAGE TO YOU LOOK AT IT \nTHAT WAY. \n>>JEFF SMITH: CAN I ADD ANOTHER \nPIECE OF INFORMATION THIS IS \nJEFF SMITH THE APPLICANT WITH \nREGIS. \n>>CHAIR\, ZACHARY WASSERMAN: GO \nAHEAD. \n>>SPEAKER: TWO PIECES OF \nINFORMATION IF YOU COULD GO BACK \nTO THE SLIDE THAT KIND OF SHOWS \nTHE GENERAL AREA. AND I KNOW \nTHIS BECAUSE WE WORKED VERY \nCLOSELY WITH 557 ON THEIR \nDESIGN. IN FACT WE HAVE THE \nSAME CIVIL ENGINEER THE SAME \nLANDSCAPE ENGINEER\, WE HAVE THE \nSAME ENVIRONMENTAL CONSULTANTS \nAND WE KNOW THE ARCHITECT. THE \n557 PROPERTY\, IF YOU REMEMBER \nBACK\, IT WAS THE OLD THEATRE\, \nAND WHEN THEY BUILT THAT \nTHEATRE\, THEY ACTUALLY GAVE BCDC \nAN EAST EASEMENT\, A 50 \nFOOD EASEMENT BACK IN THE DAY \nIT’S OVER 50 YEARS OLD THAT WAS \nTHE PRIMARY REASON THEY DECIDED \nTO ORIENTED SITE AS THEY DID \nTHAT’S WHY THIS SITE LOOKS \nDIFFERENT IN ADDITION TO THE \nFACT THAT IT’S SEVEN TIMES \nBIGGER. I WANT TO ALSO POINT \nOUT THE BLUE HARBOR PROJECT \nWHICH WAS IN THE UPPER RIGHT \nHAND CORNER WHICH DOES HAVE A \nBCDC PERMIT WITH A SMALL WALK. \nWE DID PUSH OUR BUILDINGS BACK \nTO MAINTAIN THE DESIRED WALKWAY \nAND SET BACK THAT BCDC STAFF \nASKED US TO THAT GIVES CONTEXT \nOF THE THREE PROJECTS IN THE \nAREA. \n>>CESAR ZEPEDA: THANK YOU. MY \nLAST YE IS DO WE REQUIRE SOME \nKIND OF SIGNAGE THAT SAYS THIS \nIS PUBLIC ACCESS? \n>>SPEAKER: WE DO. SO\, THAT IS \nPART OF THE\, YOU KNOW\, MAKING IT \nUSEABLE\, MAKING IT WELCOMING\, SO \nTHERE IS WITHIN THE STAFF \nRECOMMENDATION AT LEAST SOME \nREQUIREMENTS AROUND WAYFINDING \nAND SIGNAGE.   AND THERE IS \nKIND OF A STANDARD PUBLIC SHORE \nACCESS SIGN THAT YOU SEE AROUND \nTHE BAY AREA. AND THAT’S\, SORT \nOF\, LIKE I CAN’T BRANDING THAT \nWE REQUIRE. \n>>CESAR ZEPEDA: THANK YOU SO \nMUCH. NO MORE QUESTIONS. THANK \nYOU. \n>>CHAIR\, ZACHARY WASSERMAN: CAN \nI HAVE THE FULL SCREEN BACK\, \nPLEASE? THANK YOU. \nI DON’T SEE ANY OTHER \nQUESTIONS. \nCOMMISSIONER ADDIEGO? \n>>MARK ADDIEGO: THANK YOU CHAIR \nWASSERMAN. SO\, I UNDERSTAND \nWHERE THE 100 FEET PUTS IT \nWITHIN THE PROJECT\, BUT ARE WE \nSTARTING AT THE SLOUGH\, OR ARE \nWE STARTING AT THE DITCH? WHEN \nWE MEASURE OUT THE 100 FEET? \n248 STARTS AT THE DITCH. SO\, \nTHAT TIDAL DITCH\, IT’S \nTIDALLY INFLUENCED SO THIS IS \nSOMETHING WE DISCUSSED WITH THE \n557 APPLICANT BUT THE BAY TIDAL \nINFLUENCED THE WATER BODY AND \nALSO BECAUSE THERE IS MARSH \nVEGETATION WITHIN THE DITCH \nTHAT\, SORT OF\, CHANGES LIKE HOW \nWE WOULD NORMALLY SAY THE BAY \nSHORELINE IS MEAN HIGH WATER BUT \nIN THE AREAS OF TIDAL MARSH IT \nMAKES IT EDGE EVER TIDAL MARSH \nUP TO FIVE FEET ABOVE MEANS SEA \nLEVEL SO THAT’S THE LINE THAT \nTHEY’RE GOING FROM AS BAY \nSHORELINE THAT’S MARSH \nVEGETATION FIVE FEET ABOVE SEA \nLEVEL MARK. \n>>MARK ADDIEGO: IT’S \nINTERESTING IT’S CALLED A DITCH \nI ASSUME AT ONE POINT IT WAS \nCALLED A DRAINAGE DITCH WHEN IT \nWAS ALL COMMERCIAL PROPERTIES \nTHEN IT BECAME PART OF THE MARSH \nOVER TIME BECAUSE SOMEONE DIDN’T \nMAINTAIN THE DITCH AND THE FLOW \nOF WATER OFFSITE. \n>>SPEAKER: YEAH. MY \nUNDERSTANDING IS THAT THERE WAS \nONCE WAS A TIDAL GATE IN THAT \nAREA BUT AT SOME POINT IN THE \nPAST IT MALFUNCTIONED AND \nACCORDING TO OUR REGULATIONS\, IT \nTURNED THAT AREA BACK INTO BAY. \n>>MARK ADDIEGO: OKAY. THANK \nYOU. \n>>CHAIR\, ZACHARY WASSERMAN: \nJEFF\, DID YOU WANT TO SAY \nSOMETHING? \n>>SPEAKER: JEFF SMITH: JUST \nFOR CONTEXT I FEEL LIKE I HAVE \nBEEN WORKING ON THIS FOR SO LONG \nAND JUST A BIT OF HISTORY THAT’S \nEXACTLY THE CASE COMMISSIONER \nADDIEGO THERE IS ONE SMALL PIPE \n12 INCH PIPE THAT CONNECTS THE \nDITCH TO THE SLOUGH IT WASN’T A \nDRAINAGE DITCH AND ALLOWED WATER \nTO GO OUT IT DID NOT ALLOW WATER \nTO GET BACK IN AND UNFORTUNATELY \nAT SOME POINT SOMEONE FAILED TO \nMAINTAIN THAT AND MADE \nCONNECTION BUT IF YOU HAVE TO GO \nBACK OUT TO THE SLOUGH IT WOULD \nMOVE THE LINE NORTH 60 TO 70 \nFEET THAT WAS INITIAL DISCUSSION \nWE SAID RATHER THAN FIGHT OVER \nTHE LINE LET’S WORK TOGETHER \nTHAT WAS SIX YEARS AGO\, WORKING \nWITH THE CITY AND BCDC STAFF AND \nTHEN THE COMMISSION SO \nAPPRECIATE THAT. \n>>CHAIR\, ZACHARY WASSERMAN: \nCOMMISSIONER KISHIMOTO? \n>>YORIKO KISHIMOTO: I HAVE ONE \nFOLLOW-UP QUESTION\, SINCE THE \nARGUMENT IS IT’S SUCH A \nRELATIVELY NARROW PARCEL OR \nSMALL PARCEL\, SO JUST GOING BACK \nTO — I DON’T KNOW WHAT THE \nHISTORY OF THE PARCEL WAS OR \nWHEN IT WAS SOLD\, BUT I MEAN\, \nWHEN IF IT WAS SUBDIVIDED\, OR \nWHEN IT WAS SOLD\, I MEAN\, IT WAS \nSOLD WITH THAT 100 FOOT \nJURISDICTION LINE IN MIND. IS \nTHAT CORRECT? OR IS THAT \nSOMETHING THAT BCDC HAS\, OR THE \nCITY WOULD HAVE ANY — GIVES ANY \nCONSIDERATION TO? \n>>SPEAKER: WOULD YOU MIND \nREPHRASING THAT QUESTION. \n>>YORIKO KISHIMOTO: JUST KIND \nOF LOOKING AT THE VIABILITY OF \nTHAT PARCEL AS COMMERCIAL PARCEL \nFOR EITHER HOUSING OR COMMERCIAL \nUSE AND IF YOU ACKNOWLEDGE THERE \nIS THAT IMPORTANT 100 FOOT \nJURISDICTIONAL AREA\, WOULD THEY \nHAVE SUBDIVIDED IT WITH — OR \nSOLD IT WITH THAT FULL \nUNDERSTANDING? \nI MEAN\, IF THE ARGUMENT IS THAT \nIT IS THAT THE PEARLS IS TOO \nNARROW TO GIVE THE FULL \nCONSIDERATION FOR PUBLIC \nACCESS? \n>>SPEAKER: SO\, THAT HISTORY IS \nNOT SOMETHING THAT I’M AWARE \nOF. \nI WILL SAY OUR JURISDICTION HAS \nHAD THE SAME DESCRIPTION SINCE \nTHE MCATEER-PETRIS ACT WAS \nPASSED\, AND\, SO\, ANYONE DOING \nDUE DILIGENCE ON PROPERTY ALONG \nTHE BAY FRONT SHOULD BECOME \nAWARE THAT THEIR PROPERTY IS \nSUBJECT TO BCDC PERMITTING \nAUTHORITY. WHAT I WILL SAY\, \nTHOUGH\, JUST TO GIVE WHOEVER \nORIGINALLY SUBDIVIDE THAT AREA\, \nTHE BENEFIT OF THE DOUBT\, YOU \nKNOW\, AS JEFF WAS SAYING AT SOME \nPOINT\, THAT AREA ACTUALLY WENT \nSUBJECT TO BCDC JURISDICTION THE \nSAME WAY BECAUSE THAT DITCH \nDIDN’T — WASN’T ALWAYS PART OF \nOUR BAY JURISDICTION. \n>>SPEAKER: COMMISSIONERS\, I \nTHINK I WANT TO BE REALLY \nCLEAR. \nOUR JURISDICTION HERE IS MAXIMAL \n— MAXIMUM PUBLIC — MAXIMUM \nFEASIBLE PUBLIC ACCESS IN OUR \nSHORELINE BAND. THAT’S WHAT \nWE’RE — \n>>SPEAKER: CONSISTENT WITH THE \nPROJECT. \n>>SPEAKER: YES CONSISTENT WITH \nTHE PROJECT. STAFF DOES A \nPROCESS\, THEY GO LOOK AT THE \nPROJECT AND THEY DETERMINE WHAT \nIS MAXIMUM FEASIBLE PUBLIC \nACCESS. THAT’S WHAT WE’RE \nCALLED UPON TO DO HERE. THERE \nIS NO 100 FOOT SET BACK. THAT \nIS A MISNOMER THAT. IS \nNOTHING. \nIT DOES NOT EXIST. SO WHEN \nPEOPLE BUY A PIECE OF PROPERTY \nTHAT IN OUR SHORELINE BAND\, IT’S \nNOT THAT THEY EXPECT TO MOVE THE \nPROPERTY 100 FEET OFF THAT. IS \nNOT — THIS IS NOT AN EASEMENT \nFOR PUBLIC ACCESS. WHAT WE DO \nIS WE DETERMINE WHAT IS MAXIMUM \nFEASIBLE PUBLIC ACCESS \nCONSISTENT WITH THE PROJECT THAT \nIS THERE. THAT’S — AND I WANT \nTO BE REAL CLEAR ABOUT THAT \nBECAUSE I FEEL LIKE WE’RE \nGETTING OFF ON A TANGENT HERE \nAND MISUNDERSTANDING WHAT THE \nPROCESS IS. THE PROCESS IS \nSIMPLY\, IS THIS THE MAXIMUM \nFEASIBLE PUBLIC ACCESS GIVEN \nWITH THIS PROJECT\, GIVEN THE \nCONSTRAINTS OF THE SITE. WE’RE \nGIVEN A PARTICULAR SITE\, DECIDE \nWHAT ARE THE CONSTRAINTS OF THE \nSITE HOW DO YOU PROVIDE MAC MUM \nFEASIBLE PUBLIC ACCESS THERE ARE \nMANY PROJECTS THAT HAVE COME \nBEFORE BCDC AND A LOT OF THOSE \nARE SINGLE-FAMILY HOME PROJECTS \nSO IF SOMEONE HAS A \nSINGLE-FAMILY HOME PROJECT WE \nSAY WHAT’S THE MAXIMUM FEASIBLE \nPUBLIC ACCESS WHICH MAY BE ZERO \nWITH A SINGLE-FAMILY HOME \nBECAUSE YOU DON’T WANT PEOPLE \nWANDERING INTO THE SINGLE-FAMILY \nHOME SO THERE IS NO PUBLIC \nACCESS IN THE SHORELINE BAND ON \nTHAT OR IT MAY HAPPEN THERE MAY \nBE ABILITY TO PROVIDE SOME \nSTAIRS DOWN THERE OR SOMETHING \nWE LOOK AT EACH PROJECT AND MAKE \nCASE BY CASE DETERMINATION AND \nFROM IS NO SET BACK IT JUST \nDOESN’T EXIST AS A CONCEPT \nWITHIN OUR REGULATIONS I THINK \nIT’S IMPORTANT THAT WE \nUNDERSTAND THAT THE COMMISSION \nCAN APPROVE OR DENY THE PROJECT \nBUT IT’S GOT TO BE BASED ON \nMAXIMUM FEASIBLE PUBLIC ACCESS \nAND STAFF HAS PROVIDED \nCONSISTENT WITH THE PROJECT — \nYES LARRY KEEPS \nSAY CONSISTENT WITH THE \nPROJECT\, HE’S CORRECT WE LOOK AT \nTHE PROJECT\, LOOK AT THE STAFF \nRECOMMENDATION AND SAY HAS THE \nAPPLICANT PROVIDED MAXIMUM \nFEASIBLE PUBLIC ACCESS. \nSTAFF BELIEVES THEY HAVE GIVEN \nTHE CONSTRAINTS OF THE PROJECT \nTHE QUESTION IS\, DO YOU THINK \nTHEY HAVE\, AND THAT’S WHAT \nYOU’RE VOTING O REALLY NOTHING \nELSE. I MEAN\, THE CITY OF \nREDWOOD CITY HAS GONE INTO THE \nOTHER ISSUES\, YOU KNOW\, THAT’S \nOUR JURISDICTION\, THAT’S OUR JOB \nTODAY. \n>>YORIKO KISHIMOTO: YES. I — \nOKAY\, POINT TAKEN. I UNDERSTAND \nTHAT. YEAH\, ARE THE ONLY POINT \nI WOULD MAKE IS \nPERHAPS BEYOND TODAY A \nDISCUSSION IS WHEN IN THE LONGER \nTERM WHEN CITIES DO LOOK AT \nZONING FOR AREAS ALONG THE \nSHORELINE AS WE HOPE THAT THEY \nALLOW\, YOU KNOW\, ZONE WITH — \nWITH SEA LEVEL RISE\, ET CETERA\, \nIN — AS ONE OF THE \nCONSIDERATIONS. SO\, THANK YOU. \n>>CHAIR\, ZACHARY WASSERMAN: I \nHAVE A COUPLE OF QUESTIONS AND A \nREQUEST/SUGGESTION. I WANT TO \nREEMPHASIZE WHAT GREG SAID. THE \n100 FEET SHORELINE BAND IS \nWITHIN OUR JURISDICTION UNDER \nSTATE LAW\, UNDER THE \nMCATEER-PETRIS ACT FOR PURPOSES \nOF MAXIMUM FEASIBLE PUBLIC \nACCESS WITHIN THE CONSTRAINTS OF \nTHE PROJECT. THERE IS A \nSEPARATE OVERLYING PIECE\, WHICH \nI THINK WE WILL GET TO IN THE \nFUTURE\, COMING FROM OUR \nGUIDELINES TO JURISDICTIONS \nUNDER SB272 OF HOW TO RESPOND\, \nTHAT MAY HAVE SOME EFFECT ON THE \nACTIVITIES WITHIN THE 100 \nSHORELINE. BUT THE PRIMARY \nJURISDICTION OVER WHAT GOES \nTHERE\, ACCEPT FOR PUBLIC ACCESS \nIS UP TO LOCAL JURISDICTION NOT \nTHIS AGENCY. \nMY SUGGESTION REQUEST IS \nWHETHER WE CAN HAVE A CONDITION \nTHAT THE — THAT THE CONDITIONS \nIN THE EXISTENCE OF PERMIT IS \nRECORDED. \nWE HAVE HAD OCCASIONAL \nDISCUSSIONS ABOUT THIS THERE IS \nA CONDITION HOMEOWNERS BE GIVEN \nNOTICE BUT IT SEEMS TO ME THE \nWAY DO THAT NOTICE IS RECORDING \nTHE PERMIT SO THAT SHOWS UP IN \nTHE RECORD AND IT’S PARTICULARLY \nOUT FOR THIS PROJECT WHICH IS \nFOR SALE PROJECT SO THAT THE \nINDIVIDUAL OWNERS AND SUCCESSORS \nAND BUYERS WOULD THEN CLEARLY \nHAVE NOTICED BECAUSE IT WOULD BE \nIN THE RECORD AND TITLE REPORT I \nPOSE THAT TO STAFF AND THEN \nASSUMING THAT’S OKAY WE’LL POSE \nTO SEE WHETHER IT’S ACCEPTABLE \nTO THE APPLICANT \n>>SPEAKER: QUICKLY THERE IS \nALREADY ONE CONDITION WITHIN THE \nPERMIT SO IT’S IN ADDITION TO \nTHE NOTICE TO BUYERS ANY TIME WE \nHAVE DEDICATION CONDITION WITHIN \nA PERMIT IT’S TYPICAL WHERE WE \nWOULD REQUIRE RECORDING AS WELL \nTHE TIMING ON THIS ONE IS \nSLIGHTLY DIFFERENT IF THAT IT’S \nREQUIRED AT THE TIME OF CLOSE OF \nSALE OF THE PROPERTY. \n>>KATHARINE PAN: BECAUSE THE \nPERMITTEE CURRENTLY DOES NOT \nACTUAL LE OWN THE PROPERTY\, THEY \nHAVE AN OPTION TO PURCHASE. BUT \nIT IS IN THERE THAT AT THAT \nTIME\, WHEN THEY’RE READY TO MOVE \nFORWARD WITH THE PROJECT\, THAT \nIT WILL BE RECORDED. \nI THINK AT THIS POINT IT’S NOT. \n>>CHAIR\, ZACHARY WASSERMAN: NO\, \nYEAH\, I APPRECIATE THAT. THAT \nUNDER THESE CIRCUMSTANCES\, YOU \nCAN’T RECORD THE PERMIT UNTIL IT \nCOMES INTO THE APPLICANT’S HANDS \nTHAT\, MAKES PERFECT SENSE. I \nJUST WANT TO MAKE SURE STAFF IS \nSATISFIED THAT WE’RE FULLY \nPROTECTED. NO DISRESPECT AT ALL \nTO THE APPLICANT THAT THAT WILL \nBE DONE. SO\, IT’S THERE. \nTHAT’S FINE. I’M SATISFIED. \n>>LARRY GOLDZBAND: CHAIR \nWASSERMAN\, CAN I INTERRUPT FOR A \nSECOND. CAN I PLEASE ASK ALL \nCOMMISSIONERS TO TURN ON YOUR \nCAMERAS\, ALL COMMISSIONERS ON \nTHE CAMERA AT ALL TIMES WE NEED \nTO MAKE SURE WE’RE KEEPING \nQUORUM AND THE ONLY WAY WE CAN \nTELL IS IF WE CAN SEE YOU. \nTHANK YOU. \n>>CHAIR\, ZACHARY WASSERMAN: IF \nTHERE ARE NO OTHER COMMENTS THEN \nSTAFF RECOMMENDATION\, PLEASE. \nOH I’M SORRY. WE DID CLOSE THE \nPUBLIC HEARING\, DIDN’T WE? \nTHANK YOU. STAFF \nRECOMMENDATION\, \nPLEASE. \n>>SPEAKER: ALL RIGHT. SO THIS \nSTAFF RECOMMENDATION WAS MAILED \nTO YOU ON MAY 10TH\, 2024. IN \nHERE I WOULD LIKE TO TAKE A \nMOMENT TO RECOGNIZE THAT A LOT \nOF THE HARD WORK ON THE STAFF \nANALYSIS AND RECOMMENDATION WAS \nACTUALLY COMPLETED BY JESSICA \nFINKEL ONE OF OUR EXCELLENT \nPERMIT ANALYSTS WHO RECENTLY \nWENT ON PLAN LEAVE AND SO \nCOULDN’T BE HERE TO PRESENT THE \nITEM TO YOU TODAY I WANT TO \nPRESS MY APPRECIATION FOR HER \nEFFORTS BECAUSE IT MADE IT \nPOSSIBLE FOR US TO CARRY IT THE \nREST OF THE WAY. WITH THAT \nSTAFF RECOMMENDS THAT THE \nCOMMISSION APPROVE THE PERMIT \nAPPLICATION WITH SEVERAL \nCONDITIONS AMONG THEM ARE \nDEDICATION OF THE ON-SITE PUBLIC \nACCESS AREAS AND IMPROVEMENTS \nWITHIN THE TOTAL PUBLIC ACCESS \nAREA INCLUDING IN THE CALTRANS \nREDWOOD CITY RIGHTS OF WAY \nPRELIMINARY PLAN REVIEW PROCESS \nENSURING FEASIBILITY AND \nCONSISTENCY OF FINAL DESIGN \nSUBMITTING PROPERTY INTERESTS \nFOR WORK ON LANDS THAT ARE NOT \nCURRENTLY OWNED BY PERMITTEE \nPRIOR TO BEGINNING WORK \nSUBMITTING APPLICABLE WATER \nQUALITY CERTIFICATIONS OR WASTE \nCHARGE REQUIREMENTS FROM THE \nWATER BOARD PRIOR TO BEGINNING \nWORK DOCUMENTING COMPLETION OF \nON-SITE AND OFFSITE REMEDIATION \nPRIOR TO BEGINNING WORK ON \nINHABITABLE SPACES MEASURES TO \nPROTECT BAY RESOURCES \nCOMPENSATORY MITIGATION FOR THE \nHABITAT IMPACTS OF NEW BAY FILL\, \nMONITORING AND ADAPTATION \nPLANNING TO ENSURE CONTINUED \nVIABILITY PUBLIC ACCESS NOTICING \nFUTURE HOME BUYERS ABOUT \nRESPONSIBILITIES UNDER PERMIT \nINCLUDING REQUIREMENTS TO \nMAINTAINS ADAPT PUBLIC ACCESS \nAREAS STAFF CONSISTENT WITH THE \nCOMMISSIONS LAWS AND POLICIES \nRECOMMENDS THAT YOU ADOPT \nRECOMMENDATION FOR APPROVAL. \n>>CHAIR\, ZACHARY WASSERMAN: \nTAKE DOWN THE SLIDE SO YOU CAN \nSEE THE SCREEN PLEASE. IS THERE \nA MOTION? \n>>PAT ECKLUND: I’LL MOVE THE \nSTAFF — \n>>CHAIR\, ZACHARY WASSERMAN: I’M \nRECOGNIZING COMMISSIONER \nADDIEGO. \n>>MARK ADDIEGO: I WOULD LIKE TO \nMOVE APPROVAL OF THE STAFF \nRECOMMENDATION PATTED PAT EKLUND \nI’LL SECOND. THANK YOU. \n>>CHAIR\, ZACHARY WASSERMAN: \nECKLUND SECONDS. IF THERE ARE \nNO FURTHER QUESTIONS SIERRA \nPLEASE CALL THE ROLL. \n>>CLERK OF THE BOARD: \nCOMMISSIONER ADDIEGO? \n>>MARK ADDIEGO: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER ECKLUND? \n>>PAT ECKLUND: AYE. \n>>CLERK OF THE BOARD: \nCOMMISSIONER GILMORE? \n>>MARIE GILMORE: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER GORIN? \n>>SUSAN GORIN: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER GUNTHER? \n>>ANDREW GUNTHER: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER KIMBAL? \n>>SPEAKER: ABSTAIN. \n>>CLERK OF THE BOARD: \nCOMMISSIONER KISHIMOTO? \n>>YORIKO KISHIMOTO: IT’S A \nTOUGH ONE\, BUT\, YES\, I GUESS SO. \n>>CLERK OF THE BOARD: \nCOMMISSIONER LEFKOZITZ? \n>>SPEAKER: AYE. \n>>CLERK OF THE BOARD: \nCOMMISSIONER MOULTON-PETERS? \n>>STEPHANIE MOULTON-PETERS: \nYES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER NELSON? \n>>BARRY NELSON: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER PEMBERTON? \n>>SHERI PEMBERTON: AYE. \n>>CLERK OF THE BOARD: \nCOMMISSIONER PINE? \n>>DAVE PINE: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER RANDOLPH? \n>>SEAN RANDOLPH: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER ZEPEDA? \n>>CESAR ZEPEDA: YES. \n>>CLERK OF THE BOARD: CHAIR \nWASSERMAN? \n>>CHAIR\, ZACHARY WASSERMAN: \nYES. \n>>CLERK OF THE BOARD: I HAVE A \nTOTAL OF 14 YESES\, ZERO NOS\, AND \nONE ABSTENTION. \n>>CHAIR\, ZACHARY WASSERMAN: THE \nMOTION PASSES. THANKS ALL OF \nYOU FOR ALL OF YOUR HARD WORK \nAND THANK YOU TO THE COMMISSION \nFOR THE THOUGHTFUL QUESTIONS. \nTHAT BRINGS US TO ITEM TEN\, WE \nWILL RECEIVE A BRIEFING AND \nCONSIDERATION OF AUTHORIZING OUR \nEXECUTIVE DIRECTOR TO ENTER INTO \nA MEMORANDUM OF UNDERSTANDING \nAMONG BCDC AND THE MEMBER \nAGENCIES OF THE BAY AREA \nREGIONAL COLLABORATIVE\, BARC. \nTHE PURPOSE OF THE MOU IS TO \nCOORDINATE EFFORTS TO ADDRESS \nTHE THREATS OF FLOODING AND SEA \nLEVEL RISE IN THE SAN FRANCISCO \nBAY AREA. \nJESSICA FAIN OUR PLANNING \nDIRECTOR WILL INTRODUCE THE \nISSUE THEN INTRODUCE ALLISON \nBROOKS EXECUTIVE DIRECTOR THE \nLEADER OF THIS EFFORT TO DRAFT \nAND ADOPT THE MOU. \n>>JESSICA FAIN: GOOD AFTERNOON \nCHAIR WASSERMAN AND GOOD \nAFTERNOON COMMISSIONERS I’M \nPLEASED TO BE HERE AT THE END OF \nTODAY’S MEETING WITH YOU TO \nPRESENT AND SEEK YOUR \nAUTHORIZATION FOR OUR EXECUTIVE \nDIRECTOR TO ENTER INTO AN \nINTER-AGENCY MEMORANDUM OF \nUNDERSTANDING ON FLOODING AND \nSEA LEVEL RISE. I’M JOINED \nTODAY BY ALLISON BROOKS THE \nEXECUTIVE DIRECTOR OF THE BAY \nAREA REGIONAL COLLABORATIVE WHO \nHAS HELPED SPEARHEAD THIS EFFORT \nAND WHO IS GOING TO BE \nCOPRESENTING WITH ME TODAY. SO \nIF SOMEONE CAN PULL UP THE \nPRESENTATION\, WE CAN GET GOING. \nTHANK YOU. SO\, THE COMMISSION \nIS WELL AWARE THAT SEA LEVEL \nRISE IS HAPPENING AND THAT AS A \nREGION IT WILL FUNDAMENTALLY \nCHANGE THE WAY THAT WE WILL \nLIVE\, WORK\, AND RECREATE ALONG \nOUR BAY SHORELINE. NEXT SLIDE \nPLEASE. IT WILL ALSO COST A LOT \nOF MONEY. HERE IS A SLIDE FROM \nA RECENT REPORT THAT BCDC AND \nMTC ABAG RELEASED LAST SUMMER \nTHAT MAPS OUT THE $110 BILLION \nTHAT IS ESTIMATED\, THAT IT WILL \nCOST THE REGION TO ADAPT TO \nRISING SEA LEVEL BY \nMID-CENTURY. \nAND WHEN YOU LOOK AT THIS $110 \nBILLION ESTIMATE\, ABOUT HALF \nTHOSE COSTS ARE BASED ON WHAT WE \nKNOW OR OUR PLANNED PROJECTS\, IF \nYOU LOOK AT THE MAP ON THE RIGHT \nTHOSE ARE THE BLUE SPACES AS \nWELL AS WHAT WE CALL PLACE \nHOLDER PROJECTS GREEN LINES \nWHERE NO PROJECT EXISTS BUT WE \nKNOW SOMETHING WILL HAVE TO \nHAPPEN THERE. WHILE THIS IS A \nLOT OF MONEY IT APPEALS IN \nCOMPARISON TO THE ESTIMATED $231 \nBILLION IN \nANTICIPATED DAMAGES SHOULD WE \nDO NOTHING. \n$230 BILLION ARE BASED ON \nACCESSED PROPERTY VALUES AS WELL \nAS TRANSPORTATION ASSETS. THE \nREPORT INDICATED THERE IS \nCONSIDERABLE UNEVENNESS ACROSS \nTHE REGION IN TERMS OF PROJECT \nTYPES HOW FAR ALONG PLACES ARE \nAS WELL AS ABILITY OF LOCAL \nGOVERNMENTS AND OTHER PLACES TO \nRAISE FUNDS THERE ARE EQUITY \nIMPLICATIONS TO THIS WORK AS WE \nLOOK ACROSS THIS REGION TO TRY \nTO ADAPT AS A REGION. \nADDITIONALLY IT’S WORTH NOTING \nTHERE IS A WIDE RANGE OF \nACTIVITIES THAT ARE NEEDED BOTH \nTHE RESTORATION OF OUR BAY \nWETLANDS\, AND OTHER NATURE-BASED \nSTRATEGIES. BUT WE ALSO KNOW \nTHAT A VARIETY OF GRAY \nINFRASTRUCTURE STRATEGIES ARE \nNEEDED IN OTHER PLACES. SO \nWHILE A LOT OF THE WORK THAT A \nLOT OF OUR REGIONAL AND STATE \nAGENCIES ARE FOCUSED ON NOW \nACCELERATING NATURE-BASED \nSTRATEGIES THERE IS NOT A \nSIMILAR ANALOG FOR GRAY \nINFRASTRUCTURE WHERE \nNATURE-BASED STRATEGIES ARE NOT \nFEASIBLE AND BOTH OF THESE TYPES \nOF SOLUTIONS ARE REQUIRED. NEXT \nSLIDE PLEASE. \nSO THIS REPORT AS WELL AS BCDC’S \nWORK THROUGH OUR BAY ADAPT \nPROGRAM HAVE REALLY IDENTIFIED \nTHE NEED TO NOT JUST IDENTIFY \nTHIS BIG FUNDING GAP\, BUT THAT \nWE NEED TO WORK TOGETHER TO \nIDENTIFY HOW WE CAN IDENTIFY \nLEADS WHO CAN SPEARHEAD AND HELP \nFILL THE GAPS WITH SOME OF THESE \nFUNDING HOLES. THE BAY ADAPT \nJOINT PLATFORM FOR EXAMPLE\, \nCALLS FOR A REVENUE GENERATION \nAND DISTRIBUTION PLAN AND \nACCOMPANYING GOVERNANCE \nSTRUCTURE TO RAISE AND \nDISTRIBUTE FUNDS AND THIS REPORT \nWE RELEASED LAST YEAR LIKEWISE \nCALLS FOR ESTABLISHING AND \nDEVELOPING BETTER LEAD ROLES FOR \nORGANIZING HOW WE FUND THIS \nWORK. THE BAY AREA REGIONAL \nCOLLABORATION HAVE ROLLED UP \nTHEIR SLEEVES TO DEVELOP THE SEA \nLEVEL RISE MOU IT IS ATTACHED IN \nYOUR MEETING PACKAGE TODAY\, \nATTACHMENT A\, AND I’LL TURN IT \nOVER TO ALLISON TO TALK US \nTHROUGH IT. \n>>ALLISON BROOKS: THANKS \nJESSICA\, AND THANKS FOR HAVING \nME HERE TODAY. I CAN SIT DOWN? \n[LAUGHTER] \nGREAT. THANKS JESSICA. IT’S \nGREAT TO BE WITH YOU TODAY \nCOMMISSIONERS. NEXT SLIDE. A \nQUICK RECAP OF WHAT IS THE BAY \nAREA REGIONAL COLLABORATION. IT \nWAS CREATED THROUGH STATE \nSTATUTE. WE HAVE FOUR MEMBER \nAGENCIES WRITTEN INTO THE \nLEGISLATION. THE TOP $4\, \nINCLUDING BCDC\, AND THEN WE HAVE \nTHE EXECUTIVE OFFICERS OF THREE \nAGENCIES THAT PARTICIPATE \nREGULARLY IN OUR EFFORTS\, AND \nTHEY ARE SIGNATORIES OF THIS \nMOU\, AS WELL. AND THEY’RE ALL \n— WE’RE MAKING OUR WAY THROUGH \nGETTING THEIR APPROVAL\, EACH \nAGENCY’S APPROVAL TO HAVE THE \nEXECUTIVE DIRECTORS OR OFFICERS \nSIGN THE MOU. EACH ARE KIND OF \nAPPROACHING IT IN THEIR OWN WAY\, \nBUT YOU’RE THE FIRST ONE TO \nBRING — YOU’RE THE FIRST ENTITY \nTHAT WE’RE BRINGING IT FORWARD \nTO\, SO THAT’S EXCITING. NEXT \nSLIDE\, PLEASE. \nSO\, WHAT IS — WHAT’S IN THE \nMOU? WHAT IS THE MOU\, IF YOU \nHAVEN’T HAD A CHANCE TO POUR \nOVER IT QUITE YET\, WELL\, ITS \nPURPOSE IS TO ALIGN EFFORTS \nEXPERTISE AND CORE FUNCTIONS \nACROSS THOSE SEVEN AGENCIES TO \nACCOMPLISH SOME KEY GOALS\, \nACCELERATE PROJECT \nIMPLEMENTATION\, INCREASE THE BAY \nAREA’S COMPETITIVENESS FOR \nFUNDING SO HOW CAN WE WORK \nTOGETHER TO GO AFTER \nINCREASINGLY MORE SCARCE \nRESOURCES AT THE STATE LEVEL AND \nAT THE FEDERAL LEVEL TO SUPPORT \nSOME OF OUR BIG ADAPTATION \nPROJECTS WE WANT TO MOVE FORWARD \nAROUND THE REGION. ANOTHER GOAL \nIS TO ESTABLISH STRUCTURES \nCOORDINATION AND PROJECT \nPRIORITIZATION\, SUPPORT \nMULTI-JURISDICTIONAL \nPARTNERSHIPS\, AND SUPPORT CITIES \nAND COUNTIES\, AND WORK WITH YOU \nALL TO EXPAND YOUR CAPACITY TO \nFUND AND IMPLEMENT ADAPTATION \nPROJECTS AT THE LOCAL LEVEL\, \nBECAUSE WE KNOW THAT’S REALLY \nWHERE THE RUBBER HITS THE ROAD. \nSO\, I’LL QUICKLY GIVE A BRIEF \nSUMMARY OF EACH OF THE FIVE \nTOPIC AREAS WHICH YOU’RE SEEING \nON THE SLIDE HERE THAT ARE \nCOVERED IN THE MOU\, THESE CORE \nFUNCTIONAL AREAS WHERE WE HAVE \nIDENTIFIED LEADS WHERE\, AS MUCH \nAS POSSIBLE. SO\, ON THE \nPLANNING SIDE\, PREPARING FOR SEA \nLEVEL RISE AND FLOODING RISK\, \nTHAT FOCUSES ON PLANS\, POLICIES \nAND PROJECT PRIORITIES TO FOSTER \nAN ENABLING ENVIRONMENT FOR WIDE \nSCALE ADVANCEMENT OF EQUITABLE \nMULTI-BENEFIT CLIMATE ADAPTATION \nPROJECTS. THE FIRST MAIN ITEMS \nINCLUDED IN THAT ARE BCDC \nDEVELOPING YOUR REGIONAL \nSHORELINE ADAPTATION PLAN FOR \nSENATE BILL 272\, WHICH IS OFF \nAND RUNNING\, AND THE SECOND IS \nTO DEVELOP A SEA LEVEL RISE \nFUNDING AND INVESTMENT STRATEGY \nTHAT’S BEEN GOING TO BE LED BY \nBCDC AND MTC ABAG TO REALLY \nPRIORITIZE PROJECTS AND FUNDING \nSTRATEGIES WHICH WILL THEN BE \nINCLUDED IN PLANNED BAY AREA. \nSO\, WE HAVE MADE GREAT STRIDES \nWORKING TOGETHER OVER THE YEARS \nTO REALLY START TO INTEGRATE \nTHESE EFFORTS AND I THINK IT’S \nSHOWING UP HERE REALLY NICELY. \nON THE FUND MANAGEMENT SIDE\, IT \nDESCRIBES HOW THE AGENCIES WILL \nCOLLABORATE TO SEEK\, SECURE\, AND \nDISTRIBUTE FUNDING TO SUPPORT \nTHE DELIVERY OF PROJECTS THAT WE \nHAVE IDENTIFIED THE STATE \nCOASTAL CONSERVANCY IS THE LEAD \nFOR FUNDING PROPOSALS TO FEDERAL \nAGENCIES\, THE STATE COASTAL \nCONSERVANCY WITH BARC WILL TRACK \nWITH STAFF AND COORDINATE \nFUNDING PROPOSALS AND THERE ARE \nROLES IN THERE FOR SAN FRANCISCO \nESTUARY PARTNERSHIP\, MTC AND \nABAG AND CALTRANS TO RAISE \nFUNDS\, ALIGN AND DISTRIBUTE \nFUNDING\, AS WELL AS COORDINATE \nON LEGISLATIVE ADVOCACY AND \nREGIONAL FUNDING MEASURES. THIS \nSECTION ON TECHNICAL ASSISTANCE \nFOCUSES ON HOW REGIONAL AGENCIES \nCAN BEST SUPPORT PROJECT \nDEVELOPMENT AND DELIVERY THROUGH \nA REGIONAL TA PROGRAM. THIS IS \nINTENDED TO AUGMENT THE CAPACITY \nOF LOCAL GOVERNMENT\, SPECIAL \nDISTRICTS AND LOCAL \nORGANIZATIONS. OF COURSE\, \nREALLY BRINGING THIS TO THE \nSCALE\, I THINK WE ALL WOULD \nBENEFIT FROM AND REALLY WHAT WE \nNEED IS \nGOING TO NEED IS MORE FUNDING. \nTHERE IS A LOT TO START WITH AND \nMANY INVOLVED IN THIS SPACE \nWE’RE WORKING TOGETHER TO FOCUS \nON HOW WE CAN ORGANIZE OURSELVES \nAND POTENTIALLY EXPAND AND MEET \nTHE NEEDS OF THE REGION \nPROVIDING TECHNICAL ASSISTANCE. \nTHE REGULATORY ALIGNMENT SECTION \nIS FAIRLY SHORT BUT WE COMMIT \nTHE AGENCIES TO WORK TOGETHER \nAND WITH THE REGULATED COMMUNITY \nTO CONTINUALLY IMPROVE THE \nPERMITTING PROCESS TO FACILITATE \nMULTI-BENEFIT CLIMATE ADAPTATION \nPROJECT DELIVERY WHILE \nMAINTAINING IMPORTANT \nENVIRONMENTAL PROTECTIONS\, AND \nFINALLY THE COORDINATION SECTION \nFOR COLLABORATIVE \nDECISION-MAKING DESCRIBES THE \nPROCESS AND FORUMS FOR \nCOLLABORATION AND \nDECISION-MAKING. AND IT’S WORTH \nNOTING\, THINGS CHANGE. WE KNOW \nTHINGS — THERE IS A LOT OF \nCHANGE IN THE WORLD. SO\, THE \nMOU DOESN’T SUPERSEDE OR CHANGE \nANY AUTHORITIES OR JURISDICTIONS \nOF INDIVIDUAL AGENCIES. IT \nDOESN’T LOCK US INTO THIS \nRELATIONSHIP MOVING FORWARD\, IT \nALLOWS FOR CHANGES TO OCCUR \nMOVING FORWARD. IT’S EXCITING \nTHE AGENCIES ARE COMMITTING TO \nREALLY KIND OF FIGURING OUT HOW \nTO SYNC OF AND ALIGN THESE \nEFFORTS AROUND THESE FUNCTIONS. \nNEXT SLIDE PLEASE. \nHERE IS A QUICK ROLES AT A \nGLANCE SUMMARY SHEET WE HAVE \nPREPARED THAT IDENTIFY THE PRIME \nENTITIES FOR THE DIFFERENCE \nFUNCTIONAL AREAS THE CORE AGENCY \nIS RESPONSIBLE FOR THEM AND \nESSENTIALLY EVERYBODY’S INVOLVED \nIN EVERYTHING ON THIS NEXT \nSLIDE. SO WHAT DOES THIS MEAN? \nWHY DOES THIS MATTER? WELL\, WE \nHAVE NEVER DONE SOMETHING LIKE \nTHIS BEFORE IT’S INTRODUCING A \nCOORDINATED REGIONAL STRATEGY TO \nFUND AND DELIVER PROJECTS WHICH \nREALLY HASN’T BEEN UNDERTAKEN. \nIT IS SIGNIFICANT AND THERE IS A \nLOT OF WORK TO DO TO REALLY \nOPERATIONALIZE THIS BUT IT IS \nOUTLINING RULES AND \nRESPONSIBILITIES ACROSS \nFUNCTIONAL AREAS TO ACHIEVE \nTHESE SHARED GOALS. I THINK WE \nHAVE ALL BEEN WORKING ON THIS\, \nAND I THINK THIS IS A PRETTY BIG \nDEAL\, AND I’LL HAPPENED IT OVER \n— WE HAVE ONE MORE SLIDE? I \nTHINK THAT’S IT. THAT WOULD BE \nIT. OH\, YEAH\, I CAN HAND IT \nOVER TO JESSICA NOW. \n>>JESSICA FAIN: SORRY. IN CASE \nTHIS SOUNDS SOMEWHAT FAMILIAR TO \nYOU OR ANY OF THESE CONCEPTS\, IT \nREALLY SHOULD. MUCH OF THIS \nCOMES FROM THE BAY ADAPT JOINT \nPLATFORM THE CONSENSUS DRIVEN \nROADMAP FOR REGIONAL SEA LEVEL \nRISE ADAPTATION LED BY BCDC \nADOPTED IN 2021 THE MOU SPECIFIC \nCALLS OUT FOR EXAMPLE\, SOME OF \nOUR BAY ADAPT GROUPS LIKE THE \nIMPLEMENT BAY ADAPT \nIMPLEMENTATION COORDINATING \nGROUP OUR LEADERSHIP GROUP TO BE \nA FORUM THAT’S TO HELP MOVE THAT \nMOU FORWARD RELIES ON REGIONAL \nSHORELINE ADAPTATION PLAN \nBACKBONE TO SUPPORT THAT BCDC IS \nPROVIDING TO HELP MOVE IT \nFORWARD AS L LASTLY THE MOU \nADVANCING SEVERAL OF BCDC’S \nSTRATEGIC PLAN GOALS NAMELY GOAL \nONE LEADING REGIONAL PLANNING \nEFFORTS THAT RESULT IN \nSUCCESSFUL EQUITABLE ADAPTATION\, \nGOAL TWO IMPROVING OUR \nREGULATORY PLANNING FUNCTION IN \nA UNIFIED REGIONAL SCALE \nAPPROACH AND GOAL THREE \nEMBEDDING EQUITY INITIATIVES AND \nPRACTICES THROUGH THE OUR \nPROGRAMS. NEXT SLIDE. \nSO\, OUR NEXT STEPS\, AS ALLISON \nMENTIONED\, EACH OF THE AGENCIES \nIS WORKING THIS THROUGH THEIR \nOWN SYSTEM WE LIKE TO BE FIRST \nLIKE ALL THINGS RELATED TO SEA \nLEVEL RISE\, PAVING THE WAY\, THEN \nTHE IDEA IS THAT THE BARC \nGOVERNING BOARD MEETING IN JULY\, \nHOPEFULLY THE FULL BOARD WILL \nAPPROVE THIS\, THEN THE HARD WORK \nBEGINS AS WE START TO REALLY \nDIVE INTO THE WORKPLAN THAT \nWE’RE DEVELOPING AND MOVING \nTHESE PIECES FORWARD. \nNEXT SLIDE. \nI’LL READ THE STAFF \nRECOMMENDATION AND THEN PERHAPS \nWE CAN OPEN IT UP FOR \nDISCUSSION. BUT\, WE’RE ASKING \nYOU TODAY TO AUTHORIZE THE \nEXECUTIVE DIRECTOR TO ENTER INTO \nA MEMORANDUM OF UNDERSTANDING \nAMONG THE SAN FRANCISCO BAY \nCONSERVATION DEVELOPMENT \nCOMMISSION AND THE ASSOCIATION \nOF BAY AREA GOVERNMENTS\, ALSO \nHOST SAN FRANCISCO ESTUARY \nPARTNERSHIP\, THE BAAQMD\, THE BAY \nAREA REGIONAL COLLABORATIVE\, THE \nCALIFORNIA STATE COASTAL \nCONSERVANCY\, THE CALIFORNIA \nDEPARTMENT OF TRANSPORTATION \nDISTRICT FOUR\, THE METROPOLITAN \nTRANSPORTATION COMMISSION\, AND \nTHE CALIFORNIA REGIONAL WATER \nQUALITY CONTROL BOARD\, SAN \nFRANCISCO BAY REGION. TO \nCOORDINATE EVERYDAYS TO ADDRESS \nTHE THREATS OF FLOODING AND SEA \nLEVEL RISE IN THE SAN FRANCISCO \nBAY AREA. \n>>CHAIR\, ZACHARY WASSERMAN: WE \nTHANK ALL OF THE PRESENTERS. I \nWILL HAVE SOME REMARKS IN A \nBIT. \nDO WE HAVE ANY PUBLIC COMMENTS? \n>>CLERK OF THE BOARD: NONE \nIN-PERSON AND NO HANDS RAISED\, \nCHAIR WASSERMAN. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU. COMMENTS OR \nQUESTIONS FROM THE COMMISSION? \nCOMMISSIONER JOHN-BAPTISTE? \n>>ALICIA JOHN BAPTISTE: THANKS \nCHAIR WASSERMAN\, AND THANKS TO \nALLISON AND STAFF FOR THE \nPRESENTATION. JUST WANT TO \nCONGRATULATE YOU ALL ON GETTING \nTO THIS POINT. I KNOW IT’S \nGOING TO BE COMPLEX TO FIGURE \nOUT HOW TO WORK ACROSS SO MANY \nDIFFERENT AGENCIES BUT HAVING A \nSHARED UNDERSTANDING OF WHO IS \nDOING WHAT AND WHAT THE PURPOSE \nIS IS INCREDIBLY HELPFUL AND I \nTHINK THIS IS GOING TO BE A \nVALUABLE TOOL. SO\, \nCONGRATULATIONS FOR THAT. I HAD \nONE SPECIFIC QUESTION THAT MAYBE \nALLISON CAN SPEAK TO. I NOTED \nIN THE WRITE-UP THAT YOU HAVE A \nLEAD IDENTIFIED FOR SEEKING AND \nSECURING FEDERAL FUNDING. I \nDIDN’T SEE ANY REFERENCE TO THE \nSAME THING ON THE STATE LEVEL. \nBUT THAT’S — I ASSUME THE \nPATHWAY THAT WE’LL NEED TO \nPURSUE AS WELL\, AND I WONDER IF \nYOU COULD SPEAK TO THE APPROACH \nTHAT’S PLANNED THERE? \n>>ALLISON BROOKS: YEAH. THAT’S \nA GREAT QUESTION. IT’S PART OF \nTHE COORDINATION THAT WE’RE \nDOING\, WHERE WE’RE HAVING A \nSUBCOMMITTEE OF THE KEY AGENCIES \nAROUND THE FUND-RAISING TO\, \nFIRST\, IDENTIFY — WE’RE GOING \nTO HAVE A LIST AND IDENTIFY ALL \nTHE ACTIVE FUNDING OPPORTUNITIES \nTHAT ARE COMING FORWARD\, AND \nTHROUGH OUR WORK TOGETHER AND \nCOORDINATION\, WE’LL IDENTIFY WHO \nTHE APPROPRIATE LEAD IS FOR A \nSPECIFIC GRANT OPPORTUNITY AS \nTHEY COME FORWARD BASED ON WHO \nIS BEST POSITIONED TO GO AFTER \nIT. AND THEN THROUGH THAT\, \nWE’LL IDENTIFY OPPORTUNITIES FOR \nJOINT PROPOSALS THAT MAY COME \nFORWARD. BUT\, REALLY\, I THINK \nIT’S HELPFUL TO JUST SAY WE’RE \nGOING TO START WITH THE COASTAL \nCONSERVANCY AS THE KIND OF MAIN \nENTITY. BUT THERE WILL BE \nOPPORTUNITIES WHICH WE RECOGNIZE \nFOR STATE GRANTS AND OTHERS \nWHERE ANOTHER APPLICANT CAN \nPROBABLY BETTER SUITED TO GO \nAFTER IT. SO\, THAT’S REALLY \nWHERE THE COORDINATION AND THE \nSYSTEM WE’RE SETTING UP TO \nREGULARLY BE ON TOP OF THESE \nOPPORTUNITIES WILL KICK N FOR \nSURE.   . \n>>CHAIR\, ZACHARY WASSERMAN: \nCOMMISSIONER NELSON? \n>>BARRY NELSON: A QUESTION \nABOUT FINANCE. I’M REALLY \nPLEASED TO SEE THE DISCUSSION \nWITH INVESTMENT STRATEGY IN \nPLANNING\, NUMBER ONE\, BUT UNDER \nNUMBER TWO\, I HAVE A QUESTION\, A \nLOT OF THE DISCUSSION AS STAFF \nWAS JUST TALKING ABOUT\, IS ABOUT \nA LOT OF LANGUAGE IN HERE ABOUT \nSEEKING FUNDING FROM STATE \nGRANTS FEDERAL GRANTS AND \nREGIONAL SOURCES. WE HAVE \nTALKED MANY TIMES ABOUT THE \nPOTENTIAL FOR A REGIONAL — A \nREGIONAL BALLOT MEASURE\, LIKE \nMEASURE AA\, THAT WOULD BE \nSUBSTANTIALLY LARGER\, FINANCE \nADAPTATION\, I KNOW 2H DISCUSSES \nTHAT POTENTIAL\, BUT IT SAYS \nLEAVING INSTRUCT BE DETERMINED \nFOR THAT ITEM\, THAT IDEA IS \nCRITICAL THERE MAY BE ANALOGOUS \nIDEAS THAT ARE JUST NOT QUITE \nTHAT BUT SOMETHING ELSE CREATIVE \nALONG THOSE LINES. I WANTED TO \nASK WHY 2H IS LEFT UNRESOLVED \nAND WHETHER THIS MOU ADEQUATELY \nCAPTURED OTHER POTENTIAL \nCREATIVE FUNDING MECHANISMS? \nBECAUSE WE’RE GOING TO HAVE TO \nCOME UP WITH THOSE \nMECHANISMS. \n>>JESSICA FAIN: I CAN TRY TO \nANSWER THIS\, I DON’T THINK \nANYONE IS JUMPING TO LEAD THE \nFUNDING MEASURES AT THIS POINT\, \nAND CERTAINLY\, WOULDN’T WELL \nSUITED\, BCDC IS NOT GOING TO \nLEAD A REGIONAL FUNDING MEASURE \nFOR EXAMPLE\, MTC AND ABAG ARE \nOCCUPIED RIGHT NOW WITH OTHER \nBALLOT MEASURES INCLUDING \nHOUSING AND TRANSPORTATION WHICH \nHAVE RESILIENCY COMPONENTS AS \nWELL BUT AREN’T SPECIFIC ON THIS \nTOPIC. I THINK THIS IS \nIMPORTANT TO INCLUDE THIS IS A \nCONCEPT WE DON’T WANT TO LOSE \nIT’S KNOWN IT’S IMPORTANT TO BE \nDISCUSSED FOR A LONG TIME THAT \nWE’RE COMMITTING TO BUT I THINK \nTHERE IS MORE TO BE DONE IN \nTERMS OF FIGURING OUT EXACTLY \nTHE RIGHT LEAD ON HOW TO MOVE \nTHAT FORWARD. \n>>CHAIR\, ZACHARY WASSERMAN: ONE \nOF THE DIFFICULTIES IS THIS MOU \nIS REALLY AIMED AT THESE \nGOVERNMENT AGENCIES AND WHILE \nGOVERNMENT AGENCIES WERE \nINVOLVED IN AA\, THEY WERE NOT \nTHE LEAD AND THAT MAY BE THE \nCASE AGAIN. BUT WE WILL \nCERTAINLY BE VERY INVOLVED IN \nNOT ONLY THINKING ABOUT IT\, BUT \nMAKING SURE IT STAYS AT THE TOP \nOF EVERYBODY’S ATTENTION. \nCOMMISSIONER MOULTON-PETERS? \n>>STEPHANIE MOULTON-PETERS: \nTHANK YOU. I WANT TO THANK \nJESSICA AND ALLISON AND ALL OF \nTHE AGENCIES. I HAVE BEEN \nFOLLOWING THIS AND VERY \nGRATIFIED TO SEE ALL THE \nPROGRESS IT’S MADE. I WANT TO \nOFFER A FURTHER THOUGHT ALONG \nTHE LINES THAT COMMISSIONER \nNELSON JUST OFFERED\, AND THAT \nIS\, I KNOW THE FOCUS HERE IS ON \nCOORDINATING GRANT APPLICATIONS \nFOR FEDERAL AND STATE FUNDING\, I \nTHINK IT’S ALSO IMPORTANT TO \nREALIZE THAT THE PRIVATE AND \nNON-PROFIT SECTORS WILL PLAY A \nROLE IN FUNDING IN THE KIND OF \nMITIGATION ACTIVITIES THAT WE’RE \nLOOKING FOR. AND SO WHILE IT \nDOESN’T TOTALLY FIT WITHIN THE \nGRID AND TABLE THAT WE SAW\, I \nTHINK THE AGENCIES\, AND BARC\, \nWANT TO CONSIDER IN THE FUTURE \nHOW WE WOULD INCORPORATE THE \nPRIVATE AND NGO SECT ON WERES \nWHO WILL INEVITABLY GET INTO THE \nPICTURE AND HOW WE LEVERAGE \nTHOSE DOLLARS ALONG WITH THE \nSTATE AND FEDERAL FUNDING. SO \nJUST WANTED TO THROW THAT INTO \nTHE POT FOR FUTURE \nCONSIDERATION. THANK YOU. \n>>CHAIR\, ZACHARY WASSERMAN: I \nWANT TO JOIN IN THANKING \nEVERYBODY. WHEN I WAS INVOLVED \nIN A NUMBER OF DISCUSSIONS \nLEADING UP TO THIS MOU\, AND \nTHERE WAS INITIALLY A LOT OF \nSKEPTICISM\, NOT ABOUT DOING IT\, \nBUT HOW DIFFICULT IT WOULD BE\, \nOR NOT\, AND HOW QUICKLY WE COULD \nDO IT. AND I THINK WE ARE \nBEATING PEOPLE’S EXPECTATIONS. \nI SHARE JESSICA’S PRIDE IN OUR \nBEING FIRST AGENCY TO APPROVE \nIT\, AND I THINK IT WILL MOVE \nALONG WITH ALL OF THE AGENCIES\, \nBUT IN PART BECAUSE THIS CLEARLY \nWAS A COOPERATIVE EFFORT. NOT \nALWAYS WILLINGLY\, BUT EVERYBODY \nUNDERSTANDS THE IMPORTANCE OF \nDOING THIS AND TAKING THIS \nAPPROACH. AND A LOT OF THE \nFOCUS IS ON FINANCING\, BUT THE \nMOU GOES BEYOND THAT AND TALKS \nABOUT TECHNICAL ASSISTANCE AND \nMOVING TOWARDS IMPLEMENTATION. \nSO\, I WOULD — IF THERE ARE NO \nFURTHER QUESTIONS\, WELCOME \nSOMEONE MAKING THE MOTION TO \nAPPROVE THE RECOMMENDATION THAT \nWE AUTHORIZE OUR EXECUTIVE \nDIRECTOR. \n>>CLERK OF THE BOARD: CHAIR \nWASSERMAN\, I BELIEVE YOU NEED TO \nCLOSE THE PUBLIC HEARING FIRST? \nNEVER MIND. I STAND CORRECTED. \n>>PAT ECKLUND: OKAY\, I WOULD \nLIKE TO MOVE THE STAFF \nRECOMMENDATION. \n>>CHAIR\, ZACHARY WASSERMAN: \nCOMMISSIONER ECKLUND MOVES. \n>>ANDREW GUNTHER: SECOND. \n>>CHAIR\, ZACHARY WASSERMAN: AND \nCOMMISSIONER GUNTHER SECONDS. \nIF THERE ARE NO COMMENTS\, SEER A \nPLEASE CALL THE ROLL. \n>>CLERK OF THE BOARD: CAN I \nCONFIRM THAT WAS ECKLUND AND \nGUNTHER\, CORRECT? \n>>PAT ECKLUND: YES. \n>>CHAIR\, ZACHARY WASSERMAN: \nYES. \n>>CLERK OF THE BOARD: THANK \nYOU. COMMISSIONER ADDIEGO? \n>>MARK ADDIEGO: YES. \n>>CLERK OF THE BOARD: ECKLUND? \n>>PAT ECKLUND: AYE. \n>>CLERK OF THE BOARD: GORIN? \n>>SUSAN GORIN: YES. \n>>CLERK OF THE BOARD: GUNTHER? \n>>ANDREW GUNTHER: YES. \n>>CLERK OF THE BOARD: KIMBALL? \n>>SPEAKER: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER KISHIMOTO? \n>>YORIKO KISHIMOTO: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER LEFKOZITZ? \n>>SPEAKER: YES. \n>>CLERK OF THE BOARD: MOULTON \nPETERS? \n>>STEPHANIE MOULTON-PETERS: \nYES. \n>>CLERK OF THE BOARD: NELSON? \n>>BARRY NELSON: YES. \n>>CLERK OF THE BOARD: \nPEMBERTON? \n>>SHERI PEMBERTON: AYE. \n>>CLERK OF THE BOARD: \nCOMMISSIONER PINE? \n>>DAVE PINE: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER RANDOLPH? \n>>SEAN RANDOLPH: YES. \n>>CLERK OF THE BOARD: ZEPEDA? \n>>CESAR ZEPEDA: YES. \n>>CLERK OF THE BOARD: \nCOMMISSIONER BEACH? \n>>JUSTINE BEACH: ABSTAIN. \n>>CHAIR\, ZACHARY WASSERMAN: YOU \nCAN THROW IN A REGRETFUL. \n>>SPEAKER: VERY REGRETFULLY\, \nPERSONALLY SUPPORT. \n>>CLERK OF THE BOARD: CHAIR \nWASSERMAN? \n>>CHAIR\, ZACHARY WASSERMAN: \nVERY HAPPILY\, YES. \n>>CLERK OF THE BOARD: A TOTAL \nOF 15 YESES\, ZERO NOS\, AND ONE \nABSTENTION. \n>>CHAIR\, ZACHARY WASSERMAN: \nTHANK YOU\, ALL VERY MUCH. I \nAPPRECIATE THIS. I APPRECIATE \nYOUR ATTENTION AND EFFORTS\, AS \nALWAYS. \nAND WITH THAT\, I WOULD \nENTERTAIN A MOTION TO ADJOURN \n>>PAT ECKLUND: I’LL MOVE TO \nADJOURN. \n>>CHAIR\, ZACHARY WASSERMAN: \nCOMMISSIONER ECKLUND MOVES TO \nADJOURN AND COMMISSIONER NELSON \nSECONDS. \n>>PAT ECKLUND: SO WE’RE ON OUR \nWAY NOW TO ABAG. \n>>CHAIR\, ZACHARY WASSERMAN: \n[LAUGHTER] \nIF THERE AREN’T NO OBJECTIONS \n\n \n			\n				\n				\n				\n				\n				Learn How to Participate\n				Bagley-Keene Open Meeting Act\nAs a state agency\, the Commission is governed by the Bagley-Keene Open Meeting Act which requires the Commission to: (1) publish an agenda at least ten days in advance of any meeting; and (2) describe specifically in that agenda the items to be transacted or discussed. Public notices of Commission meetings and staff reports (as applicable) dealing with matters on the meeting agendas can be found on BCDC’s website. Simply access Commission Meetings under the “Public Meetings” tab on the website and select the date of the meeting. \nHow to Provide Comments and Comment Time Limits\nPursuant to state law\, the Commission is currently conducting its public meetings in a “hybrid” fashion. Each meeting notice will specify (1) where the meeting is being primarily held physically\, (2) all teleconference locations\, which will be publicly-accessible\, and (3) the ZOOM virtual meeting link. If you would like to comment at the beginning of the meeting or on an item scheduled for public discussion\, you may do so in one of three ways: (1) being present at the primary physical or a teleconference meeting location; (2) emailing comments in advance to public comment until 10 a.m. on the day of the meeting; and (3) participating via ZOOM during the meeting. \nIf you plan to participate through ZOOM\, please use your ZOOM-enabled device and click on the “raise your hand” button\, and then wait to speak until called upon. If you are using a telephone to call into the meeting\, select *6 to unmute your phone and you will then be able to speak. We ask that everyone use the mute button when not speaking. It is also important that you not put your phone on hold. Each speaker may be limited to a maximum of three minutes or less at the discretion of the Chair during the public comment period depending on the volume of persons intending to provide public comment. Any speakers who exceed the time limits or interfere with the meeting may be muted by the Chair. It is strongly recommended that public comments be submitted in writing so they can be distributed to all Commission members in advance of the meeting for review. You are encouraged to submit written comments of any length and detailed information to the staff prior to the meeting at the email address above\, which will be distributed to the Commission members. \nQuestions and Staff Reports\nIf you have any questions concerning an item on the agenda\, would like to receive notice of future hearings\, or access staff reports related to the item\, please contact the staff member whose name\, email address and direct phone number are indicated in parenthesis at the end of the agenda item. \nCampaign Contributions\nState law requires Commissioners to disqualify themselves from voting on any matter if they have received a campaign contribution from an interested party within the past 12 months. If you intend to speak on any hearing item\, please indicate in your testimony if you have made campaign contributions in excess of $250 to any Commissioner within the last year\, and if so\, to which Commissioner(s) you have contributed. Other legal requirements govern contributions by applicants and other interested parties and establish criteria for Commissioner conflicts of interest. Please consult with the staff counsel if you have any questions about the rules that pertain to campaign contributions or conflicts of interest. \nAccess to Meetings\nMeetings are physically held in venues that are accessible to persons with disabilities. If you require special assistance or have technical questions\, please contact staff at least three days prior to the meeting via email. We will attempt to make the virtual meeting accessible via ZOOM accessibility capabilities\, as well.
URL:https://www.bcdc.ca.gov/event/may-16-2024-commission-meeting/
CATEGORIES:Commission
END:VEVENT
END:VCALENDAR